Amberpoint BP-LR020123WATER INJECTION OBSERVATION ENGINEERINg, INC, Date of Service: Client No.: Client: Location: 01/23/02 3181 Transwestem Commercial Services 5001 Spring Valley Rd. Suite 600 W Dallas, TX 75244 Report No.: Project No.: Project: Building Pad 94021029.0011 94021029 Amberpoint Building No. 1 Amberpoint Bus. Pk ~ Coppell Coppell, Texas General Contractor: Injector: Procedure: On this date, a representative of HBC Engineering, Inc. observed the injection of water at this site. During the injection process, the following observations were recorded. Pass No.: 1 st No. of Probes: 4 Probe Length: l 0 feet OBSERVATION SPECIFICATION Yes No NIA Surfactant added to each load. X Injection pressure 50 to 200 psi at manifold. X Injection downward in 18 inch intervals. X Total depth of injection was 10 feet. X Spacing of injection was 5 feet maximum. X Injection to refusal at each location. X Commen~: Technician: S. Long Report Distribution: (1) Transwcstcm Commercial Services (1) O'Bricn & Associates, Inc. (1) TcchniStmctures, Inc. (1) City of Coppell - Constr. Insp. 99ss I-fiG Engineering, Inc. (1) City of Coppell - Bldg. lnsp. (1) Hill & Wilkinson, Ltd. Eugene Harbour Principal This repod is exclusively for the use of the client indicated above and shall not be reproduced in full without written approval of HBC Engineer WATER INJECTION OBSERVATION Date of Service: Client No.: Client: Location: Procedure: 01/23/02 3181 Tramswestem Commercial Services 5001 Spring Valley Rd, Suite 600 W Dallas, TX 75244 Report No.: Project No.: Project: 94021029.0010 94021029 Amberpoint Building No. 1 Amberpoint Bus2 Pk. ~ Coppell Coppell, Texas Building Pad General Contractor: Hill & Wilkinson Injector: JoweI1 On this date, a representative of HBC Engineering, Inc. observed the injection of water at this site. During the injection process, the following observations were recorded. Pass No.: 1st No. of Probes: 4 Probe Length: 12 feet OBSERVATION SPECIFICATION Yes No NIA Surfactant added to each load. X Injection pressure 50 to 200 psi at manifold. X Injection downward in 18 inch intervals. X Total depth of injection was 10 feet. X Spacing of injection was 5 feet maximum. X Iniection to refusal at each location. X Comments: Technician: S* Campbell Report Distribution: (l) Transwcstem Commercial Services (1) O'Brien & Associates, Inc. ( 1 ) TechniStmcturcs, Inc. (t) City of Coppell - Constr. Insp. (l) City of Coppell - Bldg. lnsp. (1) ltill & Wilkinson, Ltd. Engineering, Inc. ~-)uger~ne Harbour Principal 99ss This report is exclusively for the use of the client indicated abeve and shall not be reproduced in f~ll without written approval of H BC Engineer