Amberpoint BP-LR020123WATER INJECTION OBSERVATION
ENGINEERINg, INC,
Date of Service:
Client No.:
Client:
Location:
01/23/02
3181
Transwestem Commercial Services
5001 Spring Valley Rd. Suite 600 W
Dallas, TX 75244
Report No.:
Project No.:
Project:
Building Pad
94021029.0011
94021029
Amberpoint Building No. 1
Amberpoint Bus. Pk ~ Coppell
Coppell, Texas
General Contractor:
Injector:
Procedure:
On this date, a representative of HBC Engineering, Inc. observed the injection of water at this
site. During the injection process, the following observations were recorded.
Pass No.: 1 st No. of Probes: 4 Probe Length: l 0 feet
OBSERVATION
SPECIFICATION Yes No NIA
Surfactant added to each load. X
Injection pressure 50 to 200 psi at manifold. X
Injection downward in 18 inch intervals. X
Total depth of injection was 10 feet. X
Spacing of injection was 5 feet maximum. X
Injection to refusal at each location. X
Commen~:
Technician: S. Long
Report Distribution:
(1) Transwcstcm Commercial Services
(1) O'Bricn & Associates, Inc.
(1) TcchniStmctures, Inc.
(1) City of Coppell - Constr. Insp.
99ss
I-fiG Engineering, Inc.
(1) City of Coppell - Bldg. lnsp.
(1) Hill & Wilkinson, Ltd.
Eugene Harbour
Principal
This repod is exclusively for the use of the client indicated above and shall not be reproduced in full without written approval of HBC Engineer
WATER INJECTION OBSERVATION
Date of Service:
Client No.:
Client:
Location:
Procedure:
01/23/02
3181
Tramswestem Commercial Services
5001 Spring Valley Rd, Suite 600 W
Dallas, TX 75244
Report No.:
Project No.:
Project:
94021029.0010
94021029
Amberpoint Building No. 1
Amberpoint Bus2 Pk. ~ Coppell
Coppell, Texas
Building Pad
General Contractor: Hill & Wilkinson
Injector: JoweI1
On this date, a representative of HBC Engineering, Inc. observed the injection of water at this
site. During the injection process, the following observations were recorded.
Pass No.: 1st No. of Probes: 4 Probe Length: 12 feet
OBSERVATION
SPECIFICATION Yes No NIA
Surfactant added to each load. X
Injection pressure 50 to 200 psi at manifold. X
Injection downward in 18 inch intervals. X
Total depth of injection was 10 feet. X
Spacing of injection was 5 feet maximum. X
Iniection to refusal at each location. X
Comments:
Technician: S* Campbell
Report Distribution:
(l) Transwcstem Commercial Services
(1) O'Brien & Associates, Inc.
( 1 ) TechniStmcturcs, Inc.
(t) City of Coppell - Constr. Insp.
(l) City of Coppell - Bldg. lnsp.
(1) ltill & Wilkinson, Ltd.
Engineering, Inc.
~-)uger~ne Harbour
Principal
99ss This report is exclusively for the use of the client indicated abeve and shall not be reproduced in f~ll without written approval of H BC Engineer