Loading...
Amberpoint BP-LR020122 (2)WATER INJECTION OBSERVATION ENGINEERIIx~3, INC. Date of Service: 01/22/02 Report No.: Client No.: 3181 Project No.: Client: Transw~t~_.~ Fl, ~_~..'. ~..., ~: ,,~Project: ~'"'5'6~,,b4~fi~g Valley Rd, S~ General Contractor: Location: ' Building Pad injector: 94021029.0005 94021029 Amberpoint Building No. 1 Amberpint Bus. Pk ~ Coppell Coppell, Texas Hill & Wilkinson Jowell Procedure: On this date, a representative of HBC Engineering, Inc. observed the injection of water at this site. During the injection process, the following observations were recorded. Pass No.: 1st No. of Probes: 4 Probe Length: 12 feet OBSERVATION SPECIFICATION Yes No N/A Surfactant added to each load. X Injection pressure 50 to 200 psi at manifold. X Injection downward in 18 inch intervals. X Total depth of injection was 10 feet. X Spacing of injection was 5 feet maximum. X Injection to refusal at each location. X Comments: Technician: S. Campbell Report Distribution: (1) Transwestem Commercial Services (1) O'Brien & Associates, lnc. (1) TechniStruciures, Inc. (1) City of Copp¢ll - Constr. lnsp. (1) City of Coppell - Bldg. lnsp. (1) Hill & Wilkinson, Ltd. Engineering, Inc. Eugene Harbour Principal 99ss ll~is report is exclusively for the use of the client indicated above and shall not be reproduced in full without written approval of HBC Engineer