Amberpoint BP-LR020122 (2)WATER INJECTION OBSERVATION
ENGINEERIIx~3, INC.
Date of Service: 01/22/02 Report No.:
Client No.: 3181 Project No.:
Client: Transw~t~_.~ Fl, ~_~..'. ~..., ~: ,,~Project:
~'"'5'6~,,b4~fi~g Valley Rd, S~
General Contractor:
Location: ' Building Pad
injector:
94021029.0005
94021029
Amberpoint Building No. 1
Amberpint Bus. Pk ~ Coppell
Coppell, Texas
Hill & Wilkinson
Jowell
Procedure:
On this date, a representative of HBC Engineering, Inc. observed the injection of water at this
site. During the injection process, the following observations were recorded.
Pass No.: 1st No. of Probes: 4 Probe Length: 12 feet
OBSERVATION
SPECIFICATION Yes No N/A
Surfactant added to each load. X
Injection pressure 50 to 200 psi at manifold. X
Injection downward in 18 inch intervals. X
Total depth of injection was 10 feet. X
Spacing of injection was 5 feet maximum. X
Injection to refusal at each location. X
Comments:
Technician: S. Campbell
Report Distribution:
(1) Transwestem Commercial Services
(1) O'Brien & Associates, lnc.
(1) TechniStruciures, Inc.
(1) City of Copp¢ll - Constr. lnsp.
(1) City of Coppell - Bldg. lnsp.
(1) Hill & Wilkinson, Ltd.
Engineering, Inc.
Eugene Harbour
Principal