Loading...
WA9701-QU020128 (2)- STATEMENT OF QUALIFICATIONS FOR - PROFESSIONAL CIVIL ENGINEERING SERVICES Coppell, Dallas County, Texas Denton Tap Road Water Line - Bethel Road to Airline Drive WA 97-01 T H I~' C. I T Y 0 F COPP-ELL - The City of Coppell 255 Parkway Boulevard _ Dallas, Texas 75019 Submitted by -- Pacheco Koch Consulting Engineem, Inc. 8350 N. Central Expressway, Suite 1000 Dallas, Texas 75206 January 28,2002 January 28, 2002 PK No.: 0100 Ms. Suzan C. Taylor CIP Coordinator -- CITY OF COPPELL 255 Parkway Boulevard Coppell, Texas 75019  Re: DENTON TAP ROAD WATER LINE '- Bethel Road to Airline Drive WA 97-01 Coppell, Dallas County, Texas Dear Ms. Taylor: Pacheco Koch Consulting Engineers is extremely pleased to have been requested to submit a Statement of Qualifications for professional civil engineering services to the _ City of Coppell for the referenced project. We believe that our firm has the expertise and ability to successfully provide all of the services you require. We hope that you will review our qualifications carefully as we believe that we are very capable of providing quality design services emphasizing responsiveness and communication with both the City of Coppell and Dallas County. -' We greatly appreciate this opportunity and look forward to the prospect of working with you. Thank you for your time and your consideration of Pacheco Koch. Mark A. Pach~¢o, P.~=., R.P.L.S. President MAP/as enc. TABLE OF CONTENTS I. FIRM INFORMATION II. REFERENCES II1. PROJECT APPROACH IV. RELATED EXPERIENCE V. MANAGEMENT PLAN VI. RECENT / CURRENT PROJECTS IN COPPELL ._. VII. MBE CERTIFICATION VIII. INSURANCE COVERAGE SECTION 1: FIRM INFORMATION PACHECO KOCH CONSULTING ENGINEERS, INC. was formed in March of 1990 by uniting the talents and experience of Mark A. Pacheco and James A. Koch, Jr., to provide quality professional civil engineering and land surveying services to both private and public -- sector clients. The goal of the company was to combine the latest technology in engineering and surveying with a responsive, client-oriented staff to produce the best professional service possible. Located in Campbell Centre at Central Expressway and Northwest Highway in central Dallas, Pacheco Koch provides its clients with high-quality, state of the art, professional services by -- utilizing a full complement of computer aided design and drafting hardware and software as well as the most recent technology in surveying instrumentation. Design is accomplished by all personnel on a network of workstations utilizing AutoCAD 2000 computer-aided drafting _ software and Land Development Desktop Release 3 engineering and surveying software. In addition, Pacheco Koch can also prepare drawings using Microstation J if desired. Pacheco Koch survey crews employ electronic total stations with computerized data collectors for all _ surveying tasks. Pacheco Koch also utilizes the latest technology in Global Positioning System (GPS) surveying equipment when appropriate to meet the project goals. Due to the involvement of the principals in all phases of services offered, Pacheco Koch furnishes its clients with a unique, service-oriented product, stressing timeliness and responsiveness, through continuous direct contact between the principal and the client. The combination of Mr. Koch's extensive experience in the private development and surveying -- fields with Mr. Pacheco's experience in municipal engineering, construction and surveying, both as a private consultant and as a municipal representative, allows Pacheco Koch to provide a unique insightto their clients for all civil engineering and surveying projects. Pacheco Koch currently employs forty-six personnel including engineers, CAD technicians, surveyors and administrative staff as follows: Registered Professional Engineers* 4 Certified Engineers-in-Training 7 _ Registered Professional Land Surveyors* 1 Certified Surveyors-in-Training 2 Civil Engineering Technicians 10 Survey Technicians 3 -- Surveyors 10 Research Assistants 2 Administrative 6 -- Computer Systems Manager '1 TOTAL 46 *Two of the Registered Professional Engineers are also Registered Professional Land Surveyors. SECTION 2: REFERENCES Pacheco Koch believes the best proof of our qualifications lies in the satisfaction of our past and present clients. The following is a list of persons who have utilized Pacheco Koch and are familiar with our product and service: · Mufid Abdulqader · Hamid Baha CITY OF DALLAS DALLAS WATER UTILITIES DEPT. -- 320 E. Jefferson Boulevard, Room 309 320 E. Jefferson, Room 218 Dallas, Texas 75203 Dallas, Texas 75203 (214) 948-4670 (214) 948-4388 -- - Dinesh Valia - Timothy Lott CITY OF DALLAS DALLAS HOUSING AUTHORITY 320 E. Jefferson Boulevard, Room 305 3939 North Hampton Road, Suite 350 _ Dallas, Texas 75203 Dallas, Texas 75212 (214) 948-4207 (214) 951-8316 · Matt Singleton · Susan Beane -- CITY OF GRAPEVINE CITY OF RICHARDSON 501 Shady Brook Drive 411 W. Arapaho Road Grapevine, Texas 76051 Richardson, Texas 75080 _ (817) 410-3328 (972) 238-4100 · Tim Timulty · Charles Heath CITY OF MESQUITE METROCREST HOSPITAL AUTHORITY ---- 1515 N. Galloway One Medical Parkway, Suite 200 Mesquite, Texas 75149 Farmers Branch, Texas 75234 (972) 329-8503 (972) 241-6641 SECTION 3: PROJECT APPROACH -- Pacheco Koch understands that for the overall project to be successful, the project must: · achieve the design goal, · be designed and constructed within the established project schedule; and -- · be completed within the established project budget. We believe that, to obtain these objectives, it is imperative to maximize the organization and -- responsiveness of the project management and the standardization of the design effort. The following are highlights of our standard procedure for all projects. PROJECT MANAGEMENT · One main point of contact - To facilitate effective communications and response time, the client is furnished with one main point of contact (Project Manager) for all services related to the project. · Additional points of contact - In the event the main contact is unavailable, the client will also have a secondary point of contact (Principal-in-Charge) that will also be able to address questions or requests regarding all aspects of the project. · Maintain effective communications with client: - In-person meetings as appropriate - Frequent telephone contact - Written "Project Status Reports" issued weekly · Regular review of project schedule - The Project Manager and Principal-in-Charge review and update the project schedule weekly to assess resource needs and to identify and avert potential delays. · Regular review of construction cost estimates - The Project Manager reviews the "Estimate of Probable Construction Costs" regularly with the ProJect Engineer(s) to ensure the design budget is achieved. These reviews are performed, at the very least, at each submittal milestone. · Effective management of Neighborhood Meetings, Pre-Bid Conference and Pre- Construction Conference. - The Project Manager is experienced and qualified to effectively represent the client at any desired project meetings. PRE-DESIGN PROCEDURES · Prompt initiation of Title/Deed Research services - Research of all affected rights-of- way, easements and private property is started promptly for early identification of potential critical elements that could affect the design. · Comprehensive Boundary, Topographic and Control Surveying - Utilizing in-house resources, Pacheco Koch provides high-quality, precision surveying to facilitate the design effort. All surveying is produced using standardized procedures to minimize errors and/or omissions. Also all survey information is tied to existing City control monumentation as well as GPS control from the very beginning of the project. SECTION 3: PROJECT APPROACH -- DESIGN PHASE PROCEDURES · Designs performed using Team concept - Pacheco Koch is organized into a collection of "Design Teams" to facilitate the production of engineering projects. Each person on the team is aware of their assignments and how they relate to the efforts of the other members of the team. All of the members pull together for the common goal. _ · Direction from "Firm Design Manager" - One of the most important elements of the design phase at Pacheco Koch is the direction from the Design Manager of the firm. Mr. Koch, a founding principal of the firm, meets with the project manager at the beginning of each project to review and/or establish the design goals of the project and provide conceptual design directives to obtain those goals. This key step results in uniform and consistent designs produced by the firm and utilizes Mr. Koch's extensive experience in the design of infrastructure improvements. · Coordination with utility companies- Pacheco Koch has standardized procedures for coordinating will all public and franchise utilities affecting the project. This enables us to _ obtain the best information available regarding existing facilities and to determine what, if any, utility improvements will be required during the project. · Early identification of right-of-way and/or easement requirements - As soon as -- feasible, additional right-of-way, permanent easement and temporary construction easement requirements are identified and finalized to enable the client to begin negotiations with affected property owners as early as possible. -- · Regular updates of construction cost estimates - As mentioned earlier, the "Estimate of Probable Construction Cost" is updated by the Design Team regularly for review by the Project Manager. · Weekly project team meetings - The members of the Design Team meet on a weekly basis to review assignments and schedule and to identify any critical issues. QUALITY ASSURANCE PROCEDURES · Standardized "check lists" for survey data gathering - Pacheco Koch utilizes check _ lists by all survey field personnel to facilitate the accuracy and thoroughness of survey data collected and to reduce the need for additional trips to the site at a later date. ~ Standardized "check lists" for plan preparation - Pacheco Koch also utilizes check -- lists by all survey and engineering office personnel for use during the preparation of surveys and construction plans. Again, the use of these tools increases the quality of the documents prepared by reducing the risk of omissions. ~ Periodic Firm Design Manager review - After the initial review by the Design Manager, periodic reviews are performed to make sure the design is proceeding in accordance with the initial directives. The Design Manager also reviews the plans for constructability to -- avoid delays in the construction phase of the project. SECTION 3: PROJECT APPROACH -- · Standard in-house peer review - In addition to the Design Manager review, each set of construction plans undergoes a comprehensive in-house "peer" review as the project nears final completion. This review is performed, utilizing a check list of standard items, -- to check the plans for consistency and thoroughness. All plan sheet references are checked, all grades verified, all notes reviewed for compliance with local requirements, etc. This step helps to avoid conflicting information that could delay construction. -- · Standardized CAD system - Pacheco Koch has developed standardized layer names, linetypes, fonts, colors and symbols for use by all drafting and technical personnel to provide clear and consistent graphic representation on all documents. · Standardized construction details - In addition, Pacheco Koch has also created standardized details for typical public works construction to maximize efficiency and reduce errors. · Standardized system of cost estimate preparation- A database of unit prices for all typical construction items is maintained by Pacheco Koch personnel to facilitate the _ preparation of the Opinion of Probable Construction Costs. In addition, professional relationships with area contractors are maintained as they provide invaluable information regarding fluctuations in construction and materials prices. CONSTRUCTION PHASE PROCEDURES -- · Quick turn-around of contractor submittals - Pacheco Koch understands that responsiveness cannot end after the design is completed. To ensure the final success of the project, all construction phase services are also handled quickly and efficiently to _ assist the contractor in timely completion of the project. · High priority placed on Contractor RFI's - Most request for information by the contractor are minor unless not responded to in a reasonable amount of time. It is -- standard procedure that Contractor RFI's are given high priority until each is resolved. · Review of materials testing reports for compliance - Each report of material testing is reviewed for compliance with the contract documents. · Periodic site visits to monitorprogress and evaluate compliance - Unless otherwise directed by the client, Pacheco Koch design personnel make periodic visits to the _ construction site to evaluate whether the work is proceeding in compliance with the contract documents. SECTION 4: RELATED EXPERIENCE Lavon Country Lavon Country Meadows - Culleoka, Texas James A. Koch, Jr. Meadows, Ltd. Lavon Country Meadows, Ltd. Chose Pacheco Koch to Principal-in-Charge 9401 LBJ Freeway Suite 210 complete design on the first phase of a 330-unit single Dallas, TX 75243 family development on a 69 acre site in Culleoka, Chris Jones, P.E. Texas. The first phase included 115 lots with associated paving, drainage, water and sanitary sewer Project Manager Randall C. Brandt improvements. The estimated construction cost was (972) 231-6781 $1,950,000. Dallas Housing Greenleaf Village Subdivision - Dallas, Texas Mark Pacheco, P.E. Authority The Dallas Housing Authority selected Pacheco Koch to Principal-in-Charge 3939 N. Hampton Suite 350 provide civil design and surveying services for a new Dallas, TX 75212 concept in single-family developments. The 300-lot, 67 Chris Jones, P.E. acre subdivision was designed with the intent of Project Manager providing lots for a private homebuilder, the Dallas Housing Authority and Habitat for Humanity to construct. The idea was to mix publicly subsidized housing with privately funded homes. The project included conceptual design of lot/street layouts as well as final construction drawings for streets, storm sewer, water Timothy J. Lot[ and sanitary sewer improvements and neighborhood (214) 951-1950 parks. City of Dallas Bishop/Davis Rehabilitation - Dallas, TX Mark Pacheco, P.E. 320 E. Jefferson The Planning & Development Department of the City Principal-in-Charge Rm. 309 of Dallas selected Pacheco Koch to provide a variety Dallas, Texas 75203 of design services for neighborhood improvements in Chris Jones, P.E. the Davis Street/Bishop Area. The project involved Project Manager streetscape construction, drainage infrastructure and water/wastewater infrastructure improvements, including curb replacements, sidewalk replacements, Liza Munoz new street pavers, mill and overlay of asphalt pavement, new parking lots, curb inlets, storm sewer (214) 948-4599 mains, water and wastewater main replacement, street Mufid Abdulqader lighting, traffic signals, bus shelter and a new public (214) 948-4677 park area. City of Dallas 2001 Neighborhood Streets and Alleys - Dallas, TX Mark Pacheco, P.E. 320 E. Jefferson Room 309 The City of Dallas chose Pacheco Koch to provide Principal-in-Charge Dallas, Texas engineering and land surveying services for the 75203 rehabilitation of 4 streets and 5 alleys in the City of Chris Jones, P.E. Dallas. This includes 6,700 linear feet of streets, 5,970 linear feet of alleys, 5,280 linear feet of water line, 6,200Project Manager linear feet of wastewater line, and 4,480 linear feet of storm sewer. The estimated construction cost is Kassem Elkhalil $4,206,500, and the anticipated construction completion (214) 948-4126 date is in the Fall of 2002. SECTION 4: RELATED EXPERIENCE City of Grapevine CDBG Water & Street Improvements - Grapevine, TX Mark Pacheco, P.E. 200 S. Main Street The City of Grapevine contracted Pacheco Koch to Principal-in-Charge Grapevine, TX -- 76099 provide surveying and design services for water line Project Manager replacements and street paving rehabilitation in lower income neighborhoods. Community Development Block Grant funding was utilized for construction. " Approximately 1700 linear feet of 6-inch water mains Stan Laster were constructed. In addition, approximately 1400 lineal (817) 410-3136 feet of residential streets were reconstructed. Freese & Nichols 1998 W/WW Main Replacements - Dallas, TX Mark Pacheco, P.E. 1701 N. Market ~kS00 Pacheco Koch was a member of a design team Principal-in-Charge Dallas, TX 75202 contracted by the Dallas Water Utilities Department to construct over 85,000 linear feet of water and Chris Jones, P.E. wastewater mains in the city. We provided boundary Project Manager James Baddaker and topographic surveying and civil engineering design '-- (214) 920-2500 services for approximately 9700 linear feet of those Henry Niblo mains and also boundary and topographic surveying for (214) 948-4639 an additional 11,700 linear feet of mains. -- Freese & Nichols Custer Road Water Line - McKinney, TX Mark Pacheco, P.E. 1701 N. Market ~500 Pacheco Koch provided right-of-way surveying, Principal-in-Charge Dallas, TX 75202 topographic surveying and civil design services for more Project Manager ~ than 5200 linear feet of 16-inch water line along F.M. 2478 (Custer Road) from Virginia Parkway to U.S. Hwy. 380. We also prepared metes and bounds descriptions Alan Greer for all required permanent and temporary easements (214) 920-2500 associated with the new improvements. Freeman-Millican Homestead Outfall Sanitary Sewer- Sunnyvale, TX Mark Pacheco, P.E. 9500 Forest Lane -' Suite 501 To support development of The Homestead, a 405 acre Principal-in-Charge Dallas, TX 75243 planned residential development in Sunnyvale, Pacheco Koch designed 7,000 linear feet of trunk sewer that Chris Jones, P.E. -- ranges in size from 10 to 21 inches. Extensive Project Manager topographic surveying and alignment studies were necessary to minimize construction cost as well as tree loss in the natural creek area. The design also included -- Terry Millican a flow metering station for connection to a neighboring (214) 503-0555 municipal system. City of Grapevine W/WW Main Improvements - Grapevine, TX Mark Pacheco, P.E. -- 501 Shady Brook Grapevine, TX The City of Grapevine Public Works Department Principal-in-Charge 76051 contracted PKCE to provide and route topographic surveys for replacement of 22,000 linear feet of Chris Jones, P.E. -- wastewater force main and 8,000 linear feet of wastewater collection system. The contract also Project Manager included preparation of legal descriptions and exhibits _ (approximately 40) for temporary and permanent easements across platted tracts of land. The completed Matt Singleton surveys were integrated into the City of Grapevine (817) 410-3328 coordinate system using G.P.S. equipment. SECTION 5: MANAGEMENT PLAN Mark A. Pacheco, P.E., R.P.L.S. Principal-in-Charge Public Facilities and President Infrastructure Projects James A. Koch, Jr., P.E., R.P.L.S. Quality Control Public Facilities and -- Vice President Infrastructure Projects Christopher M. Jones, P.E. Project Manager Public Infrastructure -- Senior Project Manager Projects Neil D. Culver, R.P.L.S. Surveying Services Boundary, R.O.W. and .- Survey Project Manager Topographic Surveying Easement Preparation RESUMES OF KEY PERSONNEL ATTACHED AS FOLLOWS: 1. MarkA. Pacheco 2. James A. Koch, Jr. 3. Christopher M. Jones 4. Neil D. Culver MARK A. PACHECO Principal '- PROFESSIONAL EXPERIENCE Mr. Pacheco is a founding principal of Pacheco Koch Consulting Engineers, Inc. and serves as President. Mr. Pacheco has more than 20 years of civil engineering experience in independent design, project management, -- departmental management and authoritative review capacities. Those areas of his particular expertise are: · client representation at public meetings and hearings, community meetings · project management of complex and diverse engineering projects '- · infrastructure improvements to support commercial, industrial, institutional and residential development · design of renovation and/or rehabilitation projects involving paving, water and sanitary sewer facilities · design of storm water collection systems and storm water management plans -- · hydrologic and hydraulic analysis of large watersheds for flood plain definition, modification or reclamation · monitoring of construction activities and administration of construction contracts An abbreviated sample list of engineering projects for Mr. Pacheco is as follows: Public Projects: Private Proiects: · Belt Line/Gentle Flood Prevention - Richardson · Enclave at Belt Line Apartment Homes- Mesquite · CDBG Water Main & Street Rehab. - Grapevine · The Homestead, Phase 1 Subdivision- Sunnyvale -- · TxDO T Eng. & Maintenance Facility- · Community Credit Union - I~'chardson, Piano, Stephenville McKinney · Main Post Office - Frisco · Sportscomm Headquarters - Irving _ · National Guard Armory Expansion - Wylie · Cardinal Collins Technical Center- Richardson · Ohio Drive Thoroughfare Extension - Piano · Quest Medical Facility- Allen · Hamptons at Lakewest Public Housing - Dallas · Las Co#nas Federal Credit Union - Irving · Dallas Nature Center Expansion - Dallas , Clayton Homes Manufact. Facility- Sulphur Springs -- · Police & Courts Facility- Flower Mound · Lower Place Ltd. Floodplain Reclamation - Allen · Custer Road Water Line - McKinney , Nogales Produce Distribution Facility- Dallas · Fire Station No. 1 - Frisco · Salvation Army Service Center- Lewisville In addition to his engineering capabilities, Mr. Pacheco is a highly qualified land surveyor with experience in a wide variety of areas including land title surveys, boundary location, subdivision platting, right-of-way surveying, condemnation, and easements. A sample list of surveying projects for Mr. Pacheco is as follows: · Ben Milam Elementary School, Dallas - boundary & topographic survey and expert witness testimony · Sam Houston Repl. School, Dallas - boundary & topographic survey and expert witness testimony · Royal Lane Extension, Dallas - topographic & right-of-way survey and parcel maps for TxDOT · Ohio Drive Extension, Piano - topographic & right-of-way survey and parcel maps · Hardin Boulevard Relocation, McKinney- topographic & right-of-way survey and parcel maps , V.A. Hospital Expansion, Dallas - construction control, verification and certification , Federal Deposit Insurance Corp., Dallas - title surveys for disposition of mom than 80 property assets EDUCATION M.S. Civil Engineering - Purdue University, West Lafayette, Indiana - 1981 B.S. Civil Engineering - Rice University, Houston, Texas - 1980 REGISTRATION Registered Professional Engineer - Texas Registered Professional Land Surveyor - Texas Registered Professional Sanitarian -Texas PROFESSIONAL AFFILIATIONS American Society of Civil Engineers American Water Works Association Texas Society of Professional Surveyors -- JAMES A. KOCH, JR. Principal .... PROFESSIONAL EXPERIENCE Mr. Koch is a founding principal of Pacheco Koch Consulting Engineers, Inc. and serves as Vice President. He has more than 19 years of broad civil engineering experience in independent design, project -- management, and departmental management. Mr. Koch's duties at Pacheco Koch include directing the firm's engineering design and marketing efforts, being a resource to project managers and completing self directed studies and design efforts. Those areas of his particular expertise are: '- ~ planning, platting and zoning issues including presenta#ons before city commissions and councils · infrastructure improvements to support commercial, industrial, institutional and residential development · urban roadways, thoroughfares, and culvert crossings -- · design of storm water collection systems and storm water management plans · hydrologic and hydraulic analysis of large watersheds forfloodplain definition, modification or reclamation · design of wastewater collection pipelines · construction management including monitoring of construction activities, interpretation of plans and specifications, administration of construction contracts An abbreviated sample list of engineering projects for Mr. Koch is as follows: -- · Park West, Coppell, TX- 2-325, 000 sq. ft. office warehouse project · Neostar Facility, Grapevine, TX- 12 acre new distribution facilities project · Frankford Distribution Center. III, Carrollton, TX- 500, 000 sq. ft. distribution facilities project _ · Alliance Airport Tech Center. No. 4 & 5, Ft. Worth, TX- 2-100,000 sq. ft. office warehouseproject · Piano Parkway/190 Business Center, Piano, TX- 3 building, 18 acre office warehouse project · Southwest Airlines, Dallas, TX - 325, 000 sq. ft. headquarters office expansion · Nokia Alliance Airport Gateway II, Fort Worth, TX- new manufacturtng facilities project -- , Emory Air Freight Expansion, DFW Airport, TX- airport facilities project ~ Copperas Cove Junior High School, Copperas Cove, TX- new school facilities project · Greenhill School, Dallas, TX- numerous expansion projects on large private school campus _ · Tejas Testing Technology, 25 Sites, Dallas/Fort Worth Area, TX - new facilities project · AutoNation, Dallas, TX - new automobile dealership facility · Signature Center, Dallas, TX - new 25 acre shopping center facilities project · Plaza at Turtle Creek, Dallas, TX - new multi-family facilities project · Seven Oaks Apartments, Garland, TX - new multi-family apartment home project · Doctor's Hospital Expansion, Dallas, TX - medical facilities expansion project · Trinity Medical Center Phases I-III, Carrollton, TX- medical facilities expansion project In addition to his engineering capabilities, Mr. Koch is a highly qualified land surveyor with experience in a wide variety of areas including land title surveys, boundary location, subdivision platting, right-of-way surveying and easements. EDUCATION g.§. Civil Engineering - Univemity of Missouri, Columbia, Missouri - t §~2 REGISTRATION Registered Professional Engineer- Texas, Missouri, Oklahoma Registered Professional Land Surveyor- Texas PROFESSIONAL AFFILIATIONS -- Texas Society of Professional Surveyors American Institute of Architects CHRISTOPHER M. JONES Associate Principal PROFESSIONAL EXPERIENCE Mr. Jones joined Pacheco Koch Consulting Engineers, Inc. in 1998 and serves as Associate Principal. He has more than 7 years of broad civil engineering experience in independent design and project management. ~ Mr. Jones' duties at Pacheco Koch include oversight and direction of engineering designs, being a resource to project managers, leading team oriented projects, completing self directed studies and design efforts, directing development of graphics standards for the firm and directing in-house training of the civil engineering technical staff. Those areas of his particular expertise are: · public works improvement projects with special emphasis on water distribution & sewer/storm sewer collection systems · waste water lagoon improvements and expansion projects '- · hydrologic and hydraulic analysis of watersheds for storm water management and improvements · residential subdivision design and layout · preparation of state and federal funding applications for local communities; upon receipt of funding, ,- assisting local communities in compliance with funding requirements and administration of funds · construction management including engineering report writing, interpretation ofplans and specifications, development of quantity and cost estimates, preparation of construction bid documents, contract administration, and site inspection An abbreviated sample list of design projects for Mr. Jones is as follows: Public Projects: ~ · 2001 Neighborhood Streets & Alleys Replacements, Dallas, TX- 6040 Ifofstreet and alley construction · Bishop Davis Improvements Project, Dallas, TX- neighborhood redevelopment of arts district area · Marsh Lane Reconstruction, Dallas, TX- reconstruction of 6-lane divided major thoroughfare _ · 1998 Water/Wastewater Replacement Project, Dallas, TX- replacement of mains throughout city for City of Dallas Water Utilities Department · TYC Gainesville State Home, Gainesville, TX- 10,000 sf secured infirmary building · Greenleaf Village Addition, Dallas, TX- 322 lot, single family subdivision Private Projects: · Lake Highlands Family YMCA, Dallas, TX- new community recreation facility · Gatewood Estates, Garland, TX- 87 lot, single family subdivision -- · Lavon Country Meadows, Co/lin County, TX- 113 lot, single family development · Stonebridge Baptist Church, McKinney, TX- new church facility with community areas and public trail , CaterpillarArticulated Truck Facility, Waco, TX- new equipment manufacturing and demonstration facility _ · Republic Center Streetscape, Dallas, TX- city streetscape renovation and intersection improvements · El Dorado Office Center- Phase 1, McKinney, TX- floodway analysis for 300 acre planned development · Ice Facility, Richardson, TX- 50, 000 sf privately owned athletic ice facility · The Homestead, Phases II-V, Sunnyvale, TX- 518 lot single family planned residential communihy -- , Vista Office Building, Piano, TX- new 36,000 sf office development · Alliance Gateway, Roanoke, TX- new 384,000 sfparts distribution center · Reinhardt Bible Church, Garland, TX- 2~ phase of multi-phase church expansion, full development detention · Cardinal Health Distribution Center, Ft. Worth, TX- new 130, 000 sfpharmaceutical distribution center EDUCATION B.S. Civil Engineering - University of Central Florida, Orlando. Florida - 1992 REGISTRATION Registered Professional Engineer - Texas PROFESSIONAL AFFILIATIONS American Society of Civil Engineers -- NElL D. CULVER Senior Surveying Project Manager PROFESSIONAL EXPERIENCE Mr. Culver joined Pacheco Koch Consulting Engineers, Inc. in 1992 and is employed as a Senior Surveying Project Manager. He has more than 34 years of land surveying experience in management, technical and -- field capacities. Mr. Culver's duties at Pacheco Koch include being a resource to other project managers, leading team oriented projects and completing self-directed surveying project assignments. Those areas of his particular expertise are: · coordination of field surveying, reseamh and office support associated with preparation ofvafious types of surveys · extensive experience in all aspects of boundary surveys, topographic surveys, fight-of-way surveys, -- subdivision platting and easements An abbreviated sample list of surveying projects for Mr. Culver is as follows: · Royal Lane Extension, Dallas, TX- surveys/documents for R. 0. W. acquisition by TxDOT · Buckner/N~rthwestHwy~nterchange~Da~~as~TX-surveys/d~cumentsf~rR~O~W~acquisiti~nbyTxDOT · Sam Houston Replacement School, Dallas, TX- boundary & topographic surveying fornew school site and related condemnation proceedings · Ben Milam Elementary School, Dallas, TX- boundary surveying for DISD as defendant in highway condemnation proceedings -- · Hall/Jewett Property, Dallas, TX- boundary surveying for DISD as defendant in highway condemnation proceedings · Ohio Dfive Extension, Piano, TX - surveys/documents for 4400 If R. 0. W. acquisition by City of Piano · Texas Motor Speedway Water Supply Main, Fort Worth, TX- boundary surveying and easement documentation for over 3000 If of new water supply main · Hardin Boulevard Relocation, McKinney, TX- surveys/documents for 4000 IfR. 0. W. acquisition by City of McKinney -- · CMAQ, 12 Intersections, Dallas, TX - boundary & topographic surveying and R.O.W. acquisition documents for intersection improvements. · Tejas Testing, Dallas/Fort Worth, TX- boundary & topographic surveys and platting for 24 state directed _ emissions control testing facilities · Wastewater Main Improvements, Grapevine, TX- boundary and topographic surveying · Southwest Airlines, Love Field, Dallas, TX- boundary and topographic surveying, platting · Mountain Creek, Dallas, TX- surveys/documents for 400 acre site development -- · Greenhill School, Dallas, TX- boundary and topographic surveying, platting for 63. 9 acre site · Jesuit College Preparatory School, Dallas, TX- boundary and topographic surveying, platting for 27.1 acre site -- · Plaza Mexico, Dallas, TX- boundary and topographic surveying, platting for 29.2 acre site REGISTRATION Registered Professional Land Surveyor - Texas PROFESSIONAL AFFILIATIONS Texas Society of Professional Surveyors SECTION 6: RECENT/CURRENT City of Coppell Elevated Sidewalk at Riverchase Civil Engineering Elementary (Design Complete) CMC Commercial Coppell Tech Center II Civil Engineering and Realty Land Surveying -- Duke Freeport Xl (Staples) Civil Engineering Construction Corgan CiCi's Distribution Center Civil Eng~neenng Associates Duke-Weeks Creekview Drive Extension Civil Engineering Realty Group _ Duke Freeport V Civil Engineering and Construction Land Surveying Duke Freeport VI Civil Engineering and -- Construction Land Surveying Duke Freeport VII Civil Engineering and Construction Land Surveying Duke Freeport VIII Civil Engineering and Construction Land Surveying -- Duke Freeport IX Civil Engineering and Construction Land Surveying Duke Freeport Parkway Extension Civil Engineering and -- Construction Land Surveying Capstone Lam Lee Warehouse Civil Eng~neenng _ American Prop. Bradford Park West Commerce Center Platting Companies Alpha Corporation PSI Net Civil Engineering and Platting _ Alliance St. Ann Catholic Church Civil Engineering Architects SECTION 7: MBE CERTIFICATION Pacheco Koch Consulting Engineers, Inc. has been certified by the North Central Texas Regional Certification Agency (NCTRCA) as a Disadvantaged Business Enterprise. Our firm certification information is as follows: NCTRCA D,/M/X~BE CERTIFICATION Certification No.: HMDBf312Y0702 Expiration Date: July 2002 -- The following documentation is intended to demonstrate Pacheco Koch Consulting Engineers' ability to satisfy insurance requirements of the City of Coppell. A copy of our certificate is attached for your reference. If any questions arise regarding our insurance coverage, our agent may be contacted directly: Mr, Patrick P. McLaughlin, ClC McLaughlin/Brunson Insurance Agency 10925 Estate Lane, Suite 250 Dallas, Texas 75238 (214) 503-1212 I CERTIFICATE NO. / DATE ACORD CERTIFICATE OF LIABILITY INSURANCE 6/13/2001 7:42:35 AM PRODUCER THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION McLaughlin / Brunson Insurance ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE 10925 Estate Lane HOLDER. THIS CERTIFICATE DOES NOT AMEND, EXTEND OR Suite 250 ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. Dallas, TX 75238 fax: INSURERS AFFORDING COVERAGE INSURED INSURERk St. Paul Insurance Company Pacheco Koch Consulting Engineers, Inc. 9401 LBJ Freeway, Suite 300 ~NSURERB: Lumbermens Mutual Casualty Co. - Kemper Dallas, TX 75243 ~NSURERC: Texas workers' Compensation Insurance Fund 972-235-3031 fax: 972-235-9544 INSURER D: INSURER E: COVERAGES THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. AGGREGATE LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. INSR POECY EFFECTP~E POLJCY EXPIRATION LTR TYPE OF INSURANCE POLICY NUMBER DATE (M~DDPfY] DATE (MM~)DFfY) UMITS GENERAL UABIL~FY RP06658400 2/23/2001 2/23/2002 EACH OCCURRENCE $ 1,000, 000 Z i COMMERCLALGENERAL LLABILITY FIRE DAMAGE (Any one flm) $ 50, 000 I cLA,Ms~,~E ~ occur MED EXP {Any one person) $ 5, 000 A PERSONAL &ADV INJURY $ 1,000,000 GENERAL AGGREGATE $ 2,000, 000 GEN'L AGGREGATE UMIT APPLIES PER: PRODUCTS-COMP/OPAGG $ 2,000, 000 IPoucY F .oo AUTOMOBILE UABlUTY CA06613706 2/23/2001 2/23/2002 COMBINED SINGLE MMFT X ANYAUTO (Eaac~dent) $ 1,000, 000 ALL OWNED AUTOS BODILY INJURY SCHEDULED AUTOS (Per person) $ 0 A X HIREDAUTOS BODILY INJURY X NON-OWNED AUTOS (Per ac~dent) $ 0 PROPERTY DAMAGE (Per ac~dent) $ 0 GARAGE MABILR'Y AUTO ONLY. EA ACCIDENT ANY AUTO OTHER THAN EA ACC $ AUTO ONLY: AGG $ EXCESS Li~BILJTY RP06658400 2/23/2001 2/23/2002 EACH OCCURRENCE $ 1,000,000 - [-1 X OCCUR CLAIMS MADE AGGREGATE $ 1,000,000 A DEDUCTIBLE $ RETEN~ON $ 0 $ WC STATU- WORKERS COMPENSATION AND STA-0001105561 20010511 5/11/2001 5/11/2002 X TORYUM~S I IOER'~ EMPLOYERS' LIABILITY E.L EACH ACCIDENT $ 500 ~ 000 c EL DISEASE- EA EMPLOYEE $ 500,000 E.L. DISEASE - POLICY UMF~ $ 500,000 OTHER QL000170 Professional 8/27/1999 8/27/2002 B X I Per Claim Liability LIMIT $ 2,000,000 x I Annual Aggregate LIMIT $ 2,000,000 DESCRIPTION OF OPERATIONS/LOCATIONS/VEHICLES/EXCLUSIONS ADDED BY ENDORSEMENT/SPECIAL PROVISIONS CERTIFICATE HOLDER I I ADDITIONAL INSURED; INSURER LETrER: CANCELLATION SHOULD ANY OF THE ABOVE DESCRJBED POUClES BE CANCEU. ED BEFORE THE EXPIRATION Master Certificate - Pacheco Koch Consulting DATE THEREOF, THE ISSUING INSURER WILL ENDEAVOR TO MAIL 30 DAYS WRJI~EN Engineers, Inc. NOTICE TO THE CER~FICATE HOLDER NAMED TO THE LEFT, BUT F/ULURE TO DO SO SHALL 9401 LBJ Freeway, Suite 300 Dallas, TX 75243 IMPOSE NO OBUGATION OR MABIUTY OF ANY KJND UPON THE INSURE~ rrs AGENTS OR REPRESENTATIVES, AUTHORIZED REPRESENTATIVE ACORD 25-S (7197) e ACORD CORPORATION 1988