Loading...
WA9701-QU020101STATEMENT OF QUALIFICATIONS For Professional Engineering Services For DENTON TAP ROAD WATER LINE Bethel Road to Airline Drive (Project WA 97-01) Submitted To T H E · C I T Y · 0 F COPPELL Submitted By BIRKHOFF, HENDRICKS & CONWAY, L.L.P. CONSUL TING ENGINEERS DALLAS, TEXAS January 2002 BIRKHOFF, HENDRICKS & CONWAY, L.L.P. Consulting Team Structure MUNICIPAL ENGINEERS COFPELL John ~. Birhhoff, P.E. I I Managing Parmer (22-yrs) Gary C. Hendricks, P.E., R.P.L.S. I Partner t21-yrs) I Proiect Mana[~er/Princil>al-in-Char{~e for Cit~ of Coppell Partner (7-yrs) I Parmer (22-yrs) Alt. Managing Partner (29-yrs) Technical Staff I Engineering Staff I Administrative I s.~co.s.,.,s I E. Wayne Hays (31-yrs) ~ Ross L. Jacobs, P.E., R.P.L.S. Mary Yates (32-yrs) Team Consultants, Inc. ~ Founding Partner f32-y'rs~ __ Geotechnical/Quality Control Richard J. Lowe (32-yrs) ~ Barbara L. Lowe (22-yrs) I. C. Finklea, P.E. Lee Engineering Gary A. Davis (23-yrs) Founding Partner ;32-yrsI Alicia J. Carline t41/.,-yrs) Traffic Engineers John P. Ogles (17-yrs) __ Don Johnson, P.E. r5~-yrs; Lana Howell ~3'/.,-yrs; Caye Cook, A.S.L.A. (MBE) __ Landscape Architect Ken Bums (~6-yrs) Doug Showers, P.E. (~ ~-yrs) : McCreary & Associates JeffYork (16-yrs) __ Eric K. Kroner, P.E. t~-y'rs) Electrical Engineers Jesse Collazo C~ ~-yrs) __ Brad Bernhard, E.I.T. r~-yrs) / ~. ~ Structural Engineers Keith Crow (Z-mos) __ Guy Bradley, E.I.T. (2~-yrs) I Survey Staff Rob Tunnell (4-mos) __ Alice James, E.I.T. C~-yrs) ~ George Murphy (12-yrs) Lindsey Chambers CZ-mos) . Jeremy Beckwith ~5-mos) (31 Full-Time Employees, I Co-op Smden0 BIRKHOFF, HENDRICKS & CONWAY, L.L.P. CONSULTING ENGINEERS 7502 Greenville Ave., #220 DALLAS, TEXAS 75231 Phone: (214) 361-7900 Fax: (214) 361-0204 Ms. Suzan C. Taylor CIP Coordinator City of Coppell 255 Parkway _ Coppell, Texas 75019 Re: Request For Qualifications / General Scope of Services -- Denton Tap Road Water Line (Bethel Road to Airline Drive) Project WA 97-01 Dear Selection Committee: By Selecting Birkhoff, Hendricks & Conway, L.L.P. as the professional engineering firm for the - City of Coppell, the City selects a firm focused exclusively on municipal and governmental projects. Birkhoff, Hendricks & Conway's municipal experience dates back to 1969 when the firm was founded. Birkhoff, Hendricks & Conway, L.L.P. provides you with: · Professional Engineer - Owner interface with a "Client Approach" · Extensive experience with water distribution projects for the City of Coppell · Extensive water and sewer line relocation and replacement experience · Extensive water and sewer master plan and impact fee analysis · Long standing professional relationship with the City's Engineering and Public Works staff · Ability to seek unique solutions for the usual civil engineering project · Design completed by locally based professionals who are familiar with Coppell's process and needs Our company structure is included on the inside front cover of this statement of qualifications. Birkhoff, Hendricks & Conway, L.L.P. is the right professional firm for the City of Coppell's Denton Tap Road Water Line. o ~ rF~, Dedic ........... ......... ~ GARYC. HENDRICKS ~ e~'":. .......................... :"-~, ary . }Iendricks, P.E., R.P.L.S. '""' ~.o~... ~, 65226 ,-, ..~o:.,~ , ~ .:.~, ,~.. ~,, Partner j Aclcrical~,opp~ll\6120 I~si~ss dcv¢lopmcm~6120-4J dcmo~ l~p rd wl~lcttcr.doc SNAPSHOT OF BIRKHOFF, HENI)RI(~'K~S & (?ONWAY, L.L.P. -- · Specializes in municipal engineering in North Central Texas for medium and small cities. · 30-years of municipal engineering experience in North Central Texas. · One office approach to maintain low overhead. · Office located at N.E. corner of Greenville and Walnut Hill. _ · Maintains medium size firm for past 30-years (20 to 35 personnel) · "Client Based Approach" to projects which generates quality service in timely fashion. · Through partnership structure, Professional Engineers in firm are the Owners. The Owners interact with Clients. No salesmen. Two Owners are familiar with each Client. · Engineers are trained to handle client responsibility. Senior partners pass on that responsibility daily. · Operates debt free and profitable for past 30-years. · Acts as, or has acted as City Engineering staff in many cities. · Over 55% of firm tenured over 20-years. · Maintains professional liability insurance. · Maintains efficient and modern computer equipment. · Cares about the client. Can interface with the Public · Provides professional, objective and direct solutions to clients' needs. BIRKtlOFF, IIENI)RI(?KS & CONWAY, I,.I,.P. (~()NSIiI,TIN(; EN(;INEERS 7502 (;rccnvillc Ave.. #220 I)allas. Texas 75231 (214) 361-7000 COl'FELL mr vro v ~~. ~~ (BETHEL ROAD TO AIRLINE DRIVE) - '~~7~ WA 97-01 _ TABLE OF CONTENTS -- Section Section I. Understanding of Project and Scope of Work _ ~ Statement of Interest ~ ScopeofWork >' Technical Approach to Project ~ Ability to Complete Project Section II. Profile ofBirkhoff, Hendricks & Conway, L.L.P. Firm's History and Reputation Firm's Organization Office Location Size of Staff and Office Automation Professional Reputation ofBirkhoff Hendricks & Conway, L.L.P. Section RI. Project Team, Qualifications of Personnel, and Resources Qualifications of Project Personnel Proposed Team Organizational Chart Commitment to Provide Resources to this Project Sufficient Funds and Resources Professional Liability b~surance Computer Resources Current and Future Workload Active Project Status Report Section IV. Rrsumrs of Key Personnel Section V. Client References Section VI. Experience ~ Example of Projects Completed for the City of Coppell ~ Examples of Water Line Projects (Last lO-Years) City of Coppell - Denton Tap Road Water Line (WA 97-01) j:~clerical~coppell\6120 business dcvclopmcm\6120-43 denton tap rd wi\index.doc Section I - SECTION I _ Understanding of Pro]ect and Scope of }Fork It is our understanding that the City of Coppell intends to engage the services of a Licensed - Professional Engineer, along with other professionals, in order to assemble a consulting team for the installation of approximately 4050 linear feet of 16-inch waterline and related appurtenances for a -- new water main to be constructed along Denton Tap Road (Bethel Road to Airline Drive). These services would include, but not be limited to, setting preliminary alignment, preparation of plats and _ field notes for necessary easements and preparation of construction plans and specifications. In addition, we are to develop a critical time-line for the project and identify any additional steps _ through the bidding process necessary to bring the project to successful and timely completion. A. Statement of Interest Birkhoff, Hendricks & Conway, L.L.P. understands this approach and we have chosen to submit - our statement of qualifications for the engineering services. Our team consists of engineering professionals qualified to provide the engineering services required to successfully complete this - project. We have worked on numerous water system projects for the City of Coppell and our intent to continue our professional relationship with the City. B. Scope of Work - As the engineer on this project, our scope of services may include (but not limited to) the tasks identified below. Of course, if selected as your engineering consultant on this project, we will - work with the City to develop a more detailed and specific scope of services tailored to meet the needs of the City of Coppell and this project: · Obtain and utilize all existing data from the City. _ · Perform all necessary field surveys to accomplish the required design, including establishment of vertical and horizontal control. -- · Prepare cost estimates for the project. · Design and prepare construction drawings and specifications for the project. · Prepare necessary plat and field note descriptions for easement acquisition. City of Coppell - Denton Tap Road Water Line (WA 97-01) Page I-1 j: \clerical\coppell\6120 business development\6120-43 denton tap rd whsec- 1 doc _ · Assist in the pre-construction bidding, review, and award of the construction contract. · Provide requested technical assistance and site visits during the construction of the project. · Upon completion of the project, provide a set of reproducible as-built drawings. C. Technical Approach to Project The primary goal for this project is the installation of approximately 4,050 linear feet of 16-inch waterline and related appurtenances for a new water main to be constructed along Denton Tap Road from Bethel Road to Airline Drive. This water line will improve flow, pressure and overall - fire protection to the developing areas in the southwestern portion of the City. _ Denton Tap Road is a 6-lane divided thoroughfare in a 120-foot wide right-of-way. Along this portion of the corridor, most of the improvements and developments are on the east side of the roadway. On the west side of the Denton Tap Road is an existing Dairy Queen and a new Dickey's Bar-B-Que. There is an existing 8-inch water line along the western right-of-way of Denton Tap Road. We propose the 16-inch water line be situated within the available space in the western parkway - of Denton Tap Road, where practical. This will require careful and close coordination with the existing utility companies that may be within this same corridor. Due to the potential tight _ working space, our approach is to coordinate with the franchised utility companies prior to the field survey portion of the project and have the exact location of underground utilities marked in advance or concurrent with the field surveys. We would further enlist the help of the City to encourage the franchised utilities to excavate and expose their facilities in order to further assist us in determining the best alignment and location for the propose water line. The franchised utilities along with any existing City owned utilities would then be surveyed and -- plotted for use in setting the final water line alignment. In areas where space does not allow, consideration should be given to securing an easement from the adjacent property owners. Although cumbersome, time consuming and potentially costly, acquisition of an easement immediately adjacent to the western right-of-way line of Denton Tap Road may in fact be the most favorable course of action, depending on the congestion within the right-of-way. Other areas of concern include the crossings at Airline Drive, Southwestern Blvd. and the -' railroad. We recommend the water line be installed by boring all three of these critical intersections. In addition, the City may want to consider boring the Dairy Queen parking lot in - lieu of open cutting the driveways. City of Coppell - Denton Tap Road Water Line (WA 97-01) Page 1-2 j:\clerical\coppell~6120 business development\6120~43 denton tap rd vd\sec- 1 doc _ Our field surveys for this project must be sensitive to even the smallest detail and improvement. This is especially true for any existing trees, shrubbery and other landscaping improvements along the route. We propose to use our own survey crew for this project. Our survey party chief, Mr. George Murphy, has been with our firm for over 12-years and fully understands what elements of the topographic survey is required for a successful project. In addition to providing topographic surveys, our party chief, combined with the experience of Mr. Gary Hendricks, who is also a Registered Professional Land Surveyor, can provide the City of Coppell with the - necessary property research and boundary surveys required to accurately determine the location of the existing right-of-way of Denton Tap Road. This is a critical element in the success of this -- project. Finally, we propose to evaluate the City's existing and proposed master plan to determine where the proposed 16-inch water line should be connected to the existing system. This is especially critical for the 24-inch water line at Southwestern Boulevard. We are currently working with the City of Coppell to update the water distribution system master plan and hydraulic model and are in a unique position to offer this type of important analysis for this project. D. Ability to Complete Proiect - Birkhoff, Hendricks & Conway, L.L.P. has been serving municipalities in the Dallas area for over 32 years. Most of our work during this time has come from repeat business. This is _, because we have been able to successfully complete projects on time and within budget. The firm's staff is well experienced in the work it undertakes; is familiar with local, regional and state agency representatives; and is equipped with state-of-the-art computer aided drafting and design facilities to efficiently produce construction documents. If selected we expect to meet any reasonable schedule set forth by the City without the need of adding additional staff. City of Coppell - Denton Tap Road Water Line (WA 97-01) Page 1-3 jg,clerical\coppell~6120 business development\6120-43 denton tap rd wi\sec- 1 doc Section II - SECTION H Profile of Birkhoff, Hendricks & Conwa :, L.L.P. A. Firm's History and Reputation - Birkhoff, Hendricks & Conway, L.L.P. (formerly Shimek, dacobs & Finklea, L.L.P.), has a combined engineering experience of 241 years and was founded in Dallas, Texas in 1969 to -- provide consulting engineering services primarily to municipalities and other governmental agencies. Our fimfs name was changed in May 2001 to reflect the current majority ownership; _~ however our mission remains the same: To provide consulting engineering services for small and medium size municipalities and other governmental agencies in the North Texas area. Our _ firm's experience includes water, wastewater and storm drainage master planning, transportation, storm drainage design, water resources, sewage and industrial wastes, flood control, special _ municipality studies and projects such impact fee calculation and capital improvement program planning, and other areas of civil engineering. Birkhoff, Hendricks & Conway, L.L.P. has provided a full scope of civil engineering services for the Cities of Carrollton, Cedar Hill, Coppell, Dallas, Denton, DeSoto, Farmers Branch, Flower Mound, Hurst, Irving, Lancaster, Lewisville, Ovilla, North Richland Hills, Plano, Richardson, Waxahachie, and for other cities and towns in the North Central Texas area. We have also provided services to Texas A&M University, the North Texas Municipal Water District, and the Brazos River Authority for master planning and design of water and wastewater facilities. Major waterline projects have been recently completed for the North Texas Municipal Water District, Cities of Allen, Cedar Hill, Coppell, DeSoto, Euless, Farmers Branch, Irving, Lancaster, Lewisville, McKinney, Murphy, Plano, Rockwall and Waxahachie. Our client list also includes the North Texas Turnpike Authority and the Texas Department of Transportation. B. Firm's Organization Birkhoff, Hendricks & Conway, L.L.P. is a professional engineering partnership with a wide ownership base. A professional engineer partner who can make the decisions required to successfully and expeditiously complete projects meets each client's needs. What does this unique ownership structure mean to the City of Coppell? Most importantly, each partner has a vested interest in your success, both for the long-term future and the immediate project. City of Coppell - Denton Tap Road Water Line (WA 97-01) Page 11-1 j: \clerical\coppell\6120 business development\6120-43 denton tap rd wl\sec-2 doc _ No job is sold by the partners and passed to staff engineers. The partner-in-charge actually manages and represents the project throughout. This ownership/management concept has _ allowed for tenured engineers to provide services to our clients over a long period of time and resulting in a consistent repeat client base. This concept is demonstrated daily in the relationship _ the proposed project manager, Mr. Gary Hendricks, P.E., R.P.L.S. currently has with the City of Coppell. Mr. Hendricks is a partner in the firm and will be involved not only with the _ management of the project, but all technical aspects also. C. Office Location The firm's only office has been located in Dallas, Texas for the past 32 years. Our office is _ located in Dallas at the intersection of Greenville Avenue and Walnut Hill Lane at the following address: - Birkhoff, Hendricks & Conway, L.L.P. 7502 Greenville Ave., #220 Dallas, Texas 75231 - Phone: (214) 361-7900 Fax: (214) 361-0204 D. Size of Staff and Office Automation __ The staff of Birkhoff, Hendricks & Conway, L.L.P. includes eleven (11) professional engineers licensed in Texas (three of which are also Registered Professional Land Surveyors), three _ engineers-in-training, eleven CAD technicians, four office support staff and two field surveyors. The office is automated utilizing AutoCAD w/InRoads and MicroStation w/GeoPak for waterline design, WaterCAD, Hydrographics, and HEC-RAS for Hydraulic Analysis and Arcview for GIS Applications. E. Professional Reputation of Birkhoff, Hendricks & Conwa¥~ L.L.P. During the past 32 years, the professional stature and reputation of Birkhoff, Hendricks & Conway, L.L.P. partners has been evident in many other ways. The partners have all maintained memberships in the American Society of Civil Engineers, National Society of Professional Engineers and American Consulting Engineers Council. Other professional organizations which partners maintain memberships include Texas Society of Professional Surveyors, American Water Works Association, American Academy of Environmental Engineers, Water Environmental Association of Texas and Water Environmental Federation. City' of Coppell - Denton Tap Road Water Line (WA 97-01) Page H-2 j:\clerical\coppell~6120 business development\6120-43 denton tap rd wlXsec-2 doc _ Partners of Birkhoff, Hendricks & Conway, L.L.P. have received awards and have served on numerous occasions as president, vice president, director, committee chairman or in other _ capacities in the various national, state and local professional and technical societies. Following is a list showing the participation by the firm's partners, which reflects on their reputation and character. Number of -- Oreanization Position or Award Partners American Society of Civil Engineers (ASCE) .......... Member .......................................... 5 -- ASCE - Texas Section ............................................... Vice-President ................................ 1 ASCE - Texas Section ............................................... Director ........................................... 2 -- ASCE - Dallas Branch .............................................. President ......................................... 2 ASCE - Dallas Branch .............................................. Director ........................................... 2 - TSPE ~ State .............................................................. Director ........................................... 1 TSPE - Dallas Chapter .............................................. Engineer of Year ............................. 3 - TSPE - Dallas Chapter .............................................. Young Engineer of Year ................. 4 TSPE - Dallas Chapter .............................................. President ......................................... 4 TSPE - Preston Trail Chapter: .................................... Director ........................................... 1 TSPE - Preston Trail Chapter: .................................... Secretary .......................................... 1 - National Society of Professional Engineers .............. Member .......................................... 5 National Society of Professional Engineers .............. Director ........................................... 1 .... National Society of Professional Engineers .............. National Committee Member ......... 1 American Consulting Engineers Council ..................Member .......................................... 5 - Consulting Engineers Council of Texas .................... President ......................................... 1 Consulting Engineers Council of Texas .................... Director ........................................... 3 Texas Society of Professional Surveyors .................. Member .......................................... 1 American Water Works Association ......................... National Committee Chairman ....... 1 - American Water Works Association ......................... Member .......................................... 3 American Academy of Environmental Engineers ..... Diplomate ....................................... 1 Water Environment Association of Texas ................ President ......................................... 1 Water Environmental Federation .............................. National Director ............................ 1 City' of Coppell - Denton Tap Road Water Line (WA 97-01) Page 11-3 j:\clerical~coppell\6120 business development\6120-43 denton tap rd wl~,sec-2.doc Section III - SECTION III _ Project Team, Qualification of Personnel and Resources A. Qualifications of Proiect Personnel The project team that will be assigned to the City of Coppcll's Denton Tap Road Water Line is well experienced in the development of major water transmission lines. -- Gary C. Hendricks, P.E. will serve as the Project Manager. His experience includes project management, design, preparation of plans and specifications, and construction administration for - water pump stations, wastewater lift stations, wastewater collection lines, water distribution and transmission lines, elevated storage tanks and ground storage water facilities, drainage system - improvements, paving improvements and monitoring and control systems. For the City of Coppell, he has recently completed the design of S.H. 121 Water Line from Sandy Lake Road to Corporate _ Drive; the 24" Sandy Lake Road Waterline from Denton Tap Road to the Wagon Wheel Ranch Elevated Storage Tank; the 2.0-MG Wagon Wheel Ranch Elevated Storage Tank; recent expansions at the Village Parkway Pump Station; and the Village Parkway 6.0-MG Ground Strorage Reservoir. In addition, he prepared project specifications for the repainting of the Southwestern Elevated Storage Tank. Joe R. Carter, P.E. will serve as the Alt. Project Manager for this project. Joe has significant - experience in design, construction and project management on a wide variety of projects. He has designed and assisted clients with contract administration for a number of waterline projects ranging from small distribution lines to large transmission lines. Matt Hickey, P.E. will serve as the Quality Assurance/Quality Control Engineer. His experience includes the project management, design, preparation of plans and specifications and construction administration for pump stations, water transmission and distribution lines, wastewater collection lines, elevated storage tanks, ground storage reservoirs, paving and drainage and channel rehabilitation projects. Matt recently completed a water distribution master plan study for the Cities of Plano and McKinney. -- Field Survey Crew: Birkhoff, Hendricks & Conway, L.L.P. maintains its own field-party. This provides a distinct advantage for our project managers and clients. Our Party Chief, Mr. George _ Murphy, has been with the firm for over 12-years and knows what field data is required to successfully complete a project on time and in budget. City of Coppell - Denton Tap Road Water Line (WA 97-01) Page III-1 j:\clerical\coppell\6120 business development\6120-43 denton tap rd wl~sec-3 doc __ B. PROPOSED TEAM ORGANIZATIONAL CHART COPPELL - -- Parmer C~'-,'-) 1 Principal-in-Charg] e for City ofCop]~ell ! Joe R. Carter, P.E. I Partner I Alt. Project Manager i Mattmc~ey, P.E. .... ] Parmer (7-yrs) I Quality Assurance/Quality Control / l~ Henley-Johnston Associates, Inc.I GeotechnicalI --Managin~ Partner (~:-yrs) I Alt. Managing Partner ('_9:?rs)I Partner ': Tecn;icai~taff- ! i EngineeringS,q/ I , Administrative I _ E. Wayne Hays (.~/-y,..,) Ross L. Jacobs, P.E., R.P.L.S. Mary Yates Founding Partner. Richard Lowe (S&¥,-V Barbara L. Lowe - Ga~ Davis Ce&v,'V Founding PartnerO~-yrV Alicia J. Carline Jo~ Ogles (/7-yrs) Eric K. Kroner, P.E. (/-yr) ,Lana Howell Ken Burks (/O-yr.V Don Jonson, P.E. (y:~ JeffYork (/o-yrs) Douglas Showers, P.E. Jesse Collazo r/,>rO Brad Be~ard, E.I.T. -- Keith Crow (7-,nosJ Guy Bradley, E.I.T. (2,v,-s) ~ ~iel~ Surv~ Staff ~ I Rob Tu~ell (4-mos) Alice James, E.I.T. (/%-y,.s) George Mushy (12:vrs) Lindsey Chambers (7-mos) Jeremy Beckwith (5-mos) City of Coppell - Denton Tap Road Water Line (WA 97-01) Page 111-2 j:\clerlcal\coppell\6120 business development\6120-43 denton tap rd wi\sec-3 doc _ C. Commitment to Provide Resources to this Proiect Birkhoff, Hendficks & Conway, L.L.P. specialize in municipal and governmental engineering. This - allows us to provide the level of service our clients deserve. We complete projects on schedule and within budget of the original scope of services. This FACT is best demonstrated by the repeat client business that we obtain from our clients. Such a specialization requires repeat clientele. To achieve repeat business from clients, we provide quality service, on-time performance, in budget projects and quick response to the client. This formula has been successful for over 30-years and continues to work successfully. We are the only engineering firm that has been selected by the Texas Turnpike Authority on all -- three extensions of the Tollway. In fact, on the Second Phase which was a $15 million section, we were the only firm to complete the design services on schedule and within budget. Birkhoff, Hendricks & Conway, L.L.P. current and future workload will allow us to provide the _ staff to meet the City's needs. _ D. Sufficient Funds and Resources Shimek, Jacobs & Finklea, L.L.P. operates debt free. Providing quality services has established - long-term relationships with a number of municipalities. This provides timely payment for services and stable financial conditions for the firm. The company has been profitable for the past 30 years. Six of the licensed engineers in the firm are owners, which will provide the continuity in service desired by the City. Each owner is committed in providing the necessary services to complete successful projects. E. Professional Liability Insurance Shimek, Jacobs & Finklea, L.L.P. carries Professional Liability Insurance in the amount of $1,000,000 through Design Professional Insurance Corporation. F. Computer Resources - The construction plans, exhibits and fight-of-way documents will be prepared utilizing the aid of the computer and drafting and design software. City of Coppell - Denton Tap Road Water Line (WA 97-01) Page 111-3 j:\clerical\coppell\6120 business development\6120-43 denton tap rd wi\sec-3 doc - Computer Resources Hardware i Available Software - AutoCAD/Engineering Stations 9 Design Workstations Arcview 3 Lap Top Computers MicroStationLl -- 3 Engineering Design Workstations AutoCAD 2000 for Windows 13 Engineering Workstations AutoCAD Map 2000 HP 4V Laser Jet Printer (11" x 17") Cybemet and WaterCAD (Water Distribution Model) -- 2500 C+ InkJet Printer (11" x 17" Color) HEC-1, HEC-2, HEC-RAS, PondPak and BOSS HP 5si LaserJet Printer Thysys (Storm Drainage Model) 2 HP LaserJet-4050 Printer TNM (Traffic Noise Model) -- HP 650C Plotter Hydrographics (Wastewater Model) HP 755 CM Plotter InRoads SelectCAD (Roadway Design) 2 IBM Servers GeoPak2000 -- Scanners (11 x 17) Microsoft Office 97, and 2000 Professional Novell Network 5.1 Novell GroupWise 6.0 - Windows 2000, NT, and 98 Word P~ Stations 2 Workstations Microsoft Office 2000 Professional - 2 HP LaserJet-2200DT Printer NovellNetwork 5.1 2 Scanners (872 x 11) and (11 x 17) Novell GroupWise 6.0 HP Color LaserJet 4550N Printer Windows NT _ HP 850C DeskJet Printer (Color) Survey Equipment Topcon GTS4A Robotic Total Station [ TDS Survey Software - HP Data Collector I Mobile E-mail Lap Top Computers AutoCAD 2000 LT Leitz Automatic Level InRoads Survey Note: All systems include battery backups G. Current and Future Workload Based on our client based approach in lieu of project based approach, the firm has maintained in recent years a backlog of approximately 2.0 to 3.0 million dollars. The engineering fees for these projects range from a few hundred dollars to hundreds of thousand dollars in fees. The staff is geared to complete small projects as they come in the door, while maintaining a commitment to complete large long-term projects. For 32 years, this approach has worked successfully. Current active projects include the following: City of Coppell - Denton Tap Road Water Line (WA 97-0I) Page III-4 j \clerical\coppell\6120 business development\6120-43 denton tap rd wi\sec-3 doc ACTIVE PROJECT STATUS REPORT % % Client project Complete Client Project Complete Dallas Paving & Drainage in Four Alleys 100% N Texas Municipal Plano Ridgevicw Water 100% Dallas Water & Wastewater Replacements 100% Water District Transmission Pipeline - Phase II Lewisville Dallas Water Supply Line No. 2 100% Farmers Branch Epps Field Sewer Rehabilitation 100% Route Study Waxahachie Paving, drainage and utility 90% N Texas Municipal ?rankford Road Trunk Sewer 100% ~mprovements to Anderson Street, Water District :from Ross Avenue to Marvin Waxahachie 1998 Street Rehabilitation Program 100% Rockwall Lakeside Village Drainage Imp. IDes. 100% Farmers Branch 1.5 MG Composite West Side 100% Plano 2olony Meter Vaults 100% Elevated Storage Tank Lewisville North Side Pump Station for 740 99% Murphy Northstar Pump Station Imp. 100% Service Area Lewisville Study for Expansion of Lewisville 100% Addison &ddison Road Paving, & Drainage 95% Wastewater Treatment Plant Murphy Water Distribution System 90% Waxahachie Replacement of Pump No. 2 at the 100% N Texas Municipal Upper East Fork Interceptor 90% Stand Avenue Pump Station Water District System Study HNTB/NTTA Maps of Collin & Grayson 100% Lewisville Eastside Ground Storage Reservoir Const. 98% Counties showing property ~2 MG) ownership (ROW Study) Lancaster Bonnieview Pump Station 95% Dallas Country Floodplain Development Permit 100% Waxahachie Solon Rd./US 287 By-Pass 85% 21ub ~.ddison Addison Airport Water & Sewer 100% Murphy P.M. 544 Utility Adjustments 100% Line Replacement Murphy Maxwell Creek Trunk Sewer 80% Extension :3eSoto Polk Street Water Line ~ Bridge 100% :3villa Meadow Glen/Suburban Drainage 80% 4,ddison Celestial Pump Station Additions - 100% Pumps 2 & 4 and Emergency Rockwall Squabble Creek Parallel Trunk Const. 95% Generation (SCADA) Sewer Euless Water Distribution Analysis 100% Irving Water Supply Line #3 and revise 75% Water Distribution System Plan Piano 875 & 795 Water Distribution 100% Demand Study (Summer 1998) Coppell Sandy Lake Road Water Line Const. 85% Waxahachie Waste~vater System Master Plan 99% Rockwall Replacement of Pump Nos. 1 & 3 100% Update at the Eastside Pump Station, including the installation of Waxahachie Water Distribution System Master 99% Emergency Generation Plan Addison Addison Road Utility Duct Banks 100% Allen Water Distribution System Master 99% Study Plan Dallas Water Water and Wastewater Mains in the 70% Carrollton Josey Lane Paving & Drainage 95% Utilities Dept. Cedar Creek Area Improvements Euless Sanitary Sewer Study 99% Irving Flood De-Silting of Cowboys Canal and 70% Control Dist., #III Canoe Canal Central Lancaster Bonnie View Ground Storage Bidding Reservoir No. I (6 MG) Piano 10-MG G.S.R. #3 and 14-MG Const. 90% G.S.R. #4 (Ridgeview Pump Sta.) Cedar Hill Storm Drainage Master Plan 100% Irving Water Distribution System Const. 70°A Farmers Branch 7entral Service Area Water Lines 95% Improvements - MacArthur Road Coppell 2.0 MG Wagon Wheel Elevated Const. 99% Waterline & Story Rd Water Line Storage Tank Waxahachie [~ogers Spring Branch Channel 70% Plano gCADA Additions Const. 99% Improvements Waxahachie Bardwell Pump Station Imp. 100% Cedar Hill Paving & Drainage Improvements 80% Waxahachie 3.0 MG Clear Well at the Water Const. 95% :o Joe Wilson Road l'reatment Plant Plano Ridgeview Pump Sta. Expansion Const. 90% City of Coppell - Denton Tap Road Water Line (WA 97-01) Page 111-5 j:\clerical\coppell\6120 business development\6120-43 denton tap rd wl~sec-3 doc -- % % Client Project Complete Client project Complete Lewisville 2.0 MG F.M. 407 Elevated Storage Const. 75% Waxahachie U.S. Hwy 77 Waterline Extension Const. 0% -- Tank Cedar Hill 20" Waterline in Lakeridge Pkwy 100% Addison Marsh Lane Water Line 85% Waxahachie Entrance Road for the Cardinal IG 100% Richardson S.H. 190 Sanitary Sewer Study 90% Development -- Cedar Hill Ste~vart Branch Trunk Sewer 95% Farmers Branch West Side Pump Station 95% Farmers Branch SCADA Upgrades Contract DeSoto Westmoreland Improvements Bidding Phase _ Highland Park Repaint Holland Ave EST 40% Addison Addison Road/Excel Parkway Hold North Texas Dallas North Tollway Extension 40% Intersection Improvements l'ollway Authority Waxahachie Raw Water Pump Station No. 2 Contract __ Frisco ROW preparation for Preston Rd. 60% Phase Piano 2.0 MG Composite Wentworth 'Const. 60% Waxahachie Replacement of the Clarifier No. 1 Hold Elevated Stora,ge Tank. Equipment Cedar Hill F.M. 1382 Utility Relocations Hold _ Waxahachie 3roadhead Road Sports Complex 100% ~,ddition offsite waterlines Trinity River Preliminary engineering evaluation Hold DeSoto 3olton Boone Booster Pump Sta. 95% Authority of Texas land development of proposed relocation plan for the TRA Bee -- Addison 5CADA System 100% Branch Interceptor Sewer Addison Kellway Lift Station Emergency Const. 60% Oak Leaf Subdivision Review Open Generator Set Cedar Hill General Miscellaneous Services Open -- DeSoto Emergency Generator Bidding Murphy General Services Open Cedar Hill ?arkerville Rd 2.0 MG EST 95% Red Oak Subdivision Review Open Richardson Evaluation of 21 Sewer Creek 25% Waxahachie General Services Open -- Crossing Piano Wireless Communication Review Open Waxahachie Belt Press No. 2 Const. 50% ?,ockwall General Services Open Collin County DNT 3B, East Service Road/720 to Const. 65% Lancaster Subdivision Review Open ..... 2934 Dvilla Subdivision Review Open ?lano Wentworth Waterlines 80% Waxahachie Waxahachie Creek Linear Park Open Garland Water Distribution 80% DeSoto Subdivision Review Open Garland Chaha Sewer Study 80% Waxahachie Grove Creek Sanitary Sewer Sys. 75% DeSoto GSR No. 2 (5 MG) Bidding Euless Southside Tank 0% ~. &.ddison Midway Road Pavement Study 100% Euless Southside EST Waterlines 0% ~ddison Lindbergh Drainage 95% [qurst 1999 Sanitary Sewer Replacements 60% N Texas Municipal Lower Rowlett Creek Trunk Sewer 10% Lancaster Preparation of Standard 95 % Water District Construction Details ~oppell 12-inch Water Line along S.H. 121 100% ['lano ~6" Water Transmission Line 0% Euless Mid-Cities Blvd. Waterline 100% Plano Fuel Storage Tank 40% - Texas Turnpike President George Bush Turnpike - Const. 30% McKinney Water Distribution Analysis and 0% Authority Section XIX Master Plan Rockwall Update of the Water Distributions 5% McKinney F.M. 720 & Custer Rd Water Lines 10% and Wastewater Collection System Plano Stadium No. 1 Repaint 5% Master Plans Addison CIP for Addison Airport Opinion 0% texas Municipal Indian Creek Trunk Sewer 5% of Cost Water District Extension Addison Brookhaven Club Sanitary Sewer 85% Allen Engineering Analysis for update of 100% Replacement the water, sewer and traffic Impact Fee Update - Plano Impact Fee Review Process 99% City of Coppell - Denton Tap Road Water Line (WA 97-01) Page 111-6 j:\clerical\coppell\6120 business development\6120-43 denton tap rd wi\sec-3 doc Section IV - SECTION IV _ Resumes of Kev Personnel - Gary C. Hendricks, P.E., R.P.L.S. Mr. Hendricks has sixteen years of professional experience plus four years of technical/drafting _ experience in municipal engineering, all at Birkhoff, Hendricks & Conway, L.L.P. He has been a partner with Birkhoff, Hendricks & Conway, L.L.P. for the past ten years. During this time, Gary has been the project manager as well as project design engineer for a wide variety of municipal projects. _ As project manager, Mr. Hendricks has overseen and directed multi-discipline design teams which included outside consultants. As a Partner with Birkhoff, Hendricks & Conway, L.L.P. since 1989, his experience includes project management, design, preparation of plans and specifications, and construction administration for water pump stations, wastewater lift stations, wastewater collection lines, water distribution and transmission - lines, elevated storage tanks and ground storage water facilities, drainage system improvements, paving improvements and monitoring and control systems. In addition, his experience includes system-wide master plan studies and reports on municipal utility systems for many communities in the Dallas area, a - water supply study for Bell County, a regional water supply and distribution report for the Possum Kingdom Water Supply Corporation and a regional wastewater collection system study for the Cities of Grand Prairie and Cedar Hill. Mr. Hendricks has acted either as the project engineer or project manager for numerous utility master plan projects. His experience in utility system analysis and master planning includes the Cities of - Cedar Hill, DeSoto, Lewisville, Coppell, Plano, Garland, Farmers Branch, Irving, Rockwall and the Possum Kingdom Water Supply Corporation. He has recently completed impact fee updates for the Cities of Plano, DeSoto, Cedar Hill, Murphy and Allen. Mr. Hendricks' experience with master planning includes completed studies for the Cities of Plano, Irving, Cedar Hill, Grand Prairie, Rockwall, Lewisville and DeSoto. Mr. Hendricks was the engineer responsible for the design and construction administration for the recently completed paving and drainage improvements to the Ferris Road and Kirksey Street project in .._ Waxahachie. He also performed the Route Alignment Studies for Parker Road Relocation and Legacy Drive Extension in the City of Plano. These studies include the detemfination of the final centerline alignment; preparation of right-of-way strip maps, plats and field notes; and preliminary design of storm drainage and channel improvements. Mr. Hendricks has designed paving and drainage improvements to Parkerville Road and Tidwell Street Extension projects in Cedar Hill. He has also completed the utility relocation for U. S. Highway 75, S.H. 289, F.M. 1171, and F.M. 1382. _ Gary is a professional engineer licensed in the State of Texas (#65226) and a Registered Professional Land Surveyor - State of Texas (#5073). He has a Bachelor of Science Degree in Civil Engineering from the University of Texas at Arlington (1984). Gary is active in the American Society of Civil _ Engineers, American Consulting Engineers Council, Texas Society of Professional Engineers, the Water Environment Federation, and was named the 1991 Young Engineer of the Year in Dallas Chapter of T.S.P.E. City of Coppel[ - Denton Tap Road Water Line (WA 97-01) Page IV-I j:\clerical\coppell\6120 business development\6120-43 denton tap rd wi\sec-4 resume doc JOE R. CARTER, P.E. Joe is a partner with Birkhoff, Hendricks & Conway, L.L.P. and has been with the firm for over 20 years and has worked on a wide variety of projects related to paving and drainage, hydraulics and hydrology and water and sewer systems. He has significant experience in design and contract - administration for water and sewer improvement projects. Most recently, Joe has completed the design plans for an 1S-inch water distribution line along -- MacArthur Boulevard, 12-inch water lines along Story Road and Irving Boulevard and a 10-inch sanitary sewer along Irving Boulevard in the City of Irving. The total construction cost of these _ projects was around $900,000. Joe is the design engineer and project manager for the City of Irving's Dallas Water Supply Line No. 3 - project ($31 Million). This project includes over 31,000 feet of large diameter water line crossing through Carrollton, Coppell and Irving and serving Irving, Coppell and Lewisville. Joe served as lead design engineer and project manager on the $6,690,000 Parker Road Improvement project which included a six-lane divided urban thoroughfare from Jupiter Road to Los Rios Boulevard - in Plano, Texas. Sanitary sewers and water lines were also included in the design of this project. The project also included plans on a 600-foot bridge over Rowlett Creek and a 110-foot bridge over Brown Branch. A HEC-2 analysis of Rowlett Creek was used to size bridges and culverts and to prepare an application for a Conditional Letter of Map Revision from FEMA. · - Joe also served as design engineer and project manager on several major water and sewer projects for the North Texas Municipal Water District. The latest project was the $2,285,000 Rowlett Creek Trunk _ Sewer in the Cities of Allen and McKinney, Texas. Joe was the design engineer and construction manager for the City of Waxahachie on the 24-inch East Side water line project. This project was approximately 14,700 feet in length and was crossed from the southwest side of town to the northeast side of town for a total constructiuon cost of about $1,015,000. Joe served as lead design engineer on a number of other projects including Keller Springs Road with a 500-foot bridge for the City of Dallas and Ridgeview Drive with a 200-foot bridge for the City of Plano. The Ridgeview Drive Project required a HEC-2 analysis of Youngs Branch to size the 200-foot bridge. He has also been lead engineer for and paving and drainage projects and water and sewer improvements on a number of streets in Murphy, Texas. His experience including HEC-2 analysis and preparation of documents for Conditional Letter of Map Revision dates back to 1983 for Pittman Creek in Plano, Texas. Joe is a licensed professional engineer and holds a Bachelor of Science Degree in Civil Engineering from Southern Methodist University. He is a member of the American Society of Civil Engineers, the National Society of Professional Engineers, and the American Consulting Engineers Council. City of Coppell - Denton Tap Road Water Line (WA 97-01) Page IV-2 j:\clerical\coppell\6120 business development\6120-43 denton tap rd wi\sec-4 resume doc RONALD V. CONWA Y, P.E., R.P.L.S. Ron has 30 years of professional experience of which 28-years is with Birkhoff, Hendricks & Conway, - L.L.P. He has supervised a number of consultant teams on studies and construction design projects. He regularly works with structural, electrical, architectural and geotechnical subconsultants. After graduating from Texas Tech University in 1970, Ron began his career working for the Texas Highway Department as a construction engineer on the widening of S.H. 183 Freeway in Irving. He - worked as a design engineer for Birkhoff, Hendricks & Conway, L.L.P. on thoroughfare improvements to Jupiter Road, Parker Road (F.M. 2514) and Custer Road (F.M. 2478) in Plano, during the period from 1973 to 1980. He served as partner-in-charge for thoroughfare improvements to Arapaho Road and Shiloh Road in Richardson; Los Rios Boulevard in Plano; and Forest Lane in Dallas during the period from 1978 to 1980. Mr. Conway also served as partner-in-charge for the utility relocations in the northern section of the Extension of the Dallas North Tollway in 1984. He served as partner-in- charge of improvements on M.H. 539 (Royal Lane) for the State Department of Highways and Public -' Transportation in the Cities of Irving, Farmers Branch and Dallas; Solon Road and College Street Improvements in Waxahachie; Somerset Drive, Tidwell Street and Parkerville Road Improvements in _ Cedar Hill; and Ridgeview Drive, Skyline Drive, Daniel Drive, Poindexter Lane, Sunset Drive, Moonlight Drive, Starlite Drive and Northstar Drive in Murphy during the last ten years. Mr. Conway has completed several environmental assessments for TxDOT projects. Ron has also had extensive experience in the development of water and sanitary sewer systems in many Dallas area cities. He has many years of experience in development administration while serving as the consulting City Engineer for the Cities of Cedar Hill, Murphy and Waxahachie. He assisted in the development of the City of Plano Storm Drainage Design Manual, which has been adopted by several Dallas County cities. Ron is a licensed professional engineer and a professional land surveyor, and holds a Bachelor of Science Degree in Civil Engineering from Texas Tech University. He has been very active in professional societies. He is a member of the American Society of Civil Engineers, the National Society of Professional Engineers, the American Consulting Engineers Council, the American Water Works Association, and the Texas Society of Professional Surveyors. He has served many times as an officer and committee chairman in professional societies including the State President of the Consulting Engineers Council of Texas, Dallas Chapter President of the Texas Society of Professional Engineers and a National Committee Chairman for the American Water Works Association. City of Coppell - Denton Tap Road Water Line (WA 97-00 Page II/-3 j:\clerical\copp¢ll\6120 business development\6120-43 denton tap rd wi\sec-4 resume doc JOHN W. BIRKHOFF, P.E. John has over twenty years of experience in municipal engineering, all with Birkhoff, Hendricks & Conway, L.L.P. This work includes project management, design, preparation of construction plans and specifications, and construction administration for drainage improvements, thoroughfares, airports, -- water storage facilities, wastewater lift stations, water pump stations, water and wastewater lines, and environmental assessments. John has undertaken many studies and investigations including water _ distribution, wastewater collection, and drainage improvement systems. He has worked with many communities surrounding the City of Dallas, as well as Water Districts. John's experience includes several drainage projects located in congested areas. In addition, John has worked with citizen groups - to explain, educate and attempt to lessen the impact of capital improvement projects. As a partner with Birkhoff, Hendricks & Conway, L.L.P. since 1983, John has been project manager and principle in charge, as well as project design engineer for all types of municipal projects. In the position of project manager, John has overseen and directed a number of design teams, including - outside consultants. A partial listing of John's representative projects include the following: · Three sections of State Highway No. 5 in Collin County. Two sections included the reconstruction of existing two lane asphalt roadways in congested areas to two 33-foot roadway sections meeting TxDOT design and construction standards. The third section included a relocation of the existing -- roadway and a flood study of a major creek. All three sections of the project included major intersections, landscaping and utility design and relocation. Total project construction costs $7.5 million. This project included the preparation of an Environmental Assessment. · Design of Paving & Drainage Improvements to Addison Road - from Beltline Road to Keller - Springs. Project widening 4-lane asphalt to 5-lane concrete with enhancements, storm sewer improvements using parts of existing system, traffic signals and interconnects. Project design 98% _ complete. · Design of the City of Hurst's annual sanitary sewer replacement main program since 1991. Over - 14,700 linear feet of line replacement at a construction cost of $1,260,750. · Addison Airport Water & Sewer replacement project. Project included new alignments to place lines near lease lines and out from under hazards. Project Cost: $987,136 John is a professional engineer licensed in the State of Texas and has a Bachelor of Science Degree in Civil Engineering from the University of Texas at Austin. John is active in the American Society of Civil Engineers, Texas Society of Professional Engineers, Consulting Engineers Council, American Water Works Association, Water Environment Association of Texas professional and technical societies and was named Young Engineer of the Year in Dallas in 1989. City of Coppell - Denton Tap Road Water Line (kVA 97-01) Page IV-4 j:\clerical\coppel[\6120 business development\6120-43 denton tap rd wi\sec-4 resume doc PAUL A. CARLINE, P.E. Paul is a partner with Birkhoff, Hendricks & Conway, L.L.P. and has been with the firm for the past 5 years. He is a 1994 graduate of the University of Texas at Arlington and has worked on projects related to paving, drainage, hydraulics, hydrology, water and sewer. Since joining the firm in January, -- 1995, Mr. Carline has been involved with the design of the following representative projects: · Paving and Drainage: Collin County - Dallas North Tollway Extension Phase 3A · Sanitary Sewer Replacements: City of Dallas - Cedar Creek Basin Sanitary Sewer Rehabilitation · Sanitary Sewer Replacements: City ofRockwall - Stonebridge Diversion Sewer _ · Water Line Improvements: Town of Highland Park - Water Line Replacements · Drainage: City ofRockwall - Lakeside Village Drainage Improvements Mr. Carline has recently been involved with the paving and drainage design for approximately 5-miles of service road for the Dallas North Tollway extension from S.H. 121 to F.M. 720 in the City of Frisco. - His experience on this project included setting the vertical alignment for the service road and laying out the geometrics, grades and contours for five major intersections. Mr. Carline was also responsible for - designing a storm sewer system to intercept runoff from a drainage area of approximately 1,100 acres. Design of the 5-mile storm sewer system included locating and sizing inlets, storm sewer pipe, culverts and open channels. Mr. Carline was also involved in the construction phase of the project which included weekly site visits, monthly progress meetings and general construction administration. - Paul is presently involved with the paving and drainage design of the $20 million S.H. 121/Dallas North Tollway intersection improvements located in the cities of Plano and Frisco. -' Mr. Carline's experience with master planning includes completed studies for the Town of Highland Park and the Cities of Cedar Hill, Coppell, Garland, Rockwall, Waxahachie and The Brazos River _ Authority. Paul is a Licensed Professional Engineer in the State of Texas. Paul holds a Bachelor of Science - Degree in Civil Engineering from the University of Texas at Arlington. He is a member of the American Society of Civil Engineers, National Society of Professional Engineers, Texas Society of Professional Engineers and the American Water Works Association. City of Coppell - Denton Tap Road Water Line (WA 97-01) Page IV-5 j:\clerical\coppell\6120 business development\6120-43 denton tap rd wi\sec-4 resume doc MATT HICKE Y, P.E. Matt Hickey is an engineer in training with Birkhoff, Hendricks 8,: Conway, L.L.P. and has been with - the firm for $ years. He is a 1994 graduate of Texas 3_ & M University with a Bachelor of Science Degree in Civil Engineering. Since joining the firm in January, 1995, Mr. Hickey has been involved _ with the design of the following representative projects: · Paving and Drainage Reconstruction: City of Carrollton - Josey Lane South of Beltline · Paving and Drainage: North Texas Turnpike Authority - George Bush Turnpike - · Channel Improvements: City of DeSoto - Woodlawn Drainage Improvements ° Sanitary Sewer Replacements: City of Cedar Hill - Sanitary Sewer Rehabilitation - Phase I · Sanitary Sewer Replacements: Town of Addison - Inwood Road Sanitary Sewer Replacement · Water Line Improvements: City of Cedar Hill - Joe Wilson Road Water Line - · Channel Improvements: Town of Addison - Town Hall Channel Improvements Mr. Hickey has most recently designed the paving and drainage reconstruction improvements for Josey - Lane between Belt Line Road and Fyke Road in the City of Carrollton. His work included establishing the horizontal and vertical alignment of the roadway, laying out the grades and contours for - intersections, sizing curb inlets and storm sewers, relocating sanitary sewers, setting the vertical alignment for a 12-inch water line and performing a HEC-RAS analysis on a downstream tributary of the storm sewer outfall. Mr. Hickey is currently involved with the design of the $2.3 million Joe Wilson Road - Phase 3, paving _ and drainage improvements from Parkerville Road to Belt Line Road in the City of Cedar Hill. Mr. Hickey's experience with master planning includes completed studies for the Town of Addison - and the Cities of Lancaster, Euless, Plano, McKinney and Farmers Branch. Mr. Hickey is a Professional Engineer in the State of Texas. He is a member of the American Society of Civil Engineers, National Society of Professional Engineers, the Water Environmental Federation and is currently serving as a 2-year Director for the Preston Trail Chapter of the Texas Society of - Professional Engineers. City of Coppell - Denton Tap Road Water Line (WA 97-01) Page IV-6 j:\clerical\coppell\6120 business development\6120-43 denton tap rd wi\sec-4 resume doc BIRKHOFF, HENDRICKS & CONWAY, L.L.P. _ ,4 uto C,4D Technician Resutn es Birkhoff, Hendricks & Conway has nine AutoCAD Workstations manned with experienced technicians - for the production of plans, right-of-way maps, plats and other documents. Three of these technicians, Richard J. Lowe, Wayne Hays and Gary A. Davis have been with the firm 32, 31 and 23 years _ respectively. Each of these technicians has played a leadership role in the firm's transition to AutoCAD drafting. Also, each has been involved in the preparation of plans for highway, urban thoroughfare, tollway and drainage projects. Richard J. Lowe attended the University of Texas at Arlington School of Engineering for 2 years and _ E1 Centro College and Mountain View College for 1-1/2 years. Recent completed roadway projects by Richard include the $12.0 million M.H. 539 (Royal Lane) Project, the $15.0 million Dallas North Tollway Project and State Highway 5, connecting with the S.H. 190 Project in South Plano. E. Wayne Hays is a 1966 graduate of Navarro Junior College and he has recently completed _ AutoCAD design and drafting on the $15.0 million Dallas North Tollway Project, F.M. 544 to north of Windhaven Parkway. Also, he completed the design and plans for the Jupiter Road Project, Spring Creek Parkway to Parker Road and the Spring Creek Parkway Project, Jupiter Road to Parker Road in - Plano. _ Gary A. Davis is a graduate of the University of Texas at Arlington with a Bachelor of Arts Degree in Mathematics and has an Associate of Arts Degree from New Mexico Military Institute. Gary has recently completed the drawings for the construction phasing on the TxDOT $12.0 million M.H. 539 - (Royal Lane) Project and the $15.0 million Dallas North Tollway Project. Also, he performed the AutoCAD work on TxDOT Projects, State Highway 5 Relocation near U.S. Highway 75 and Spring - Creek Parkway and State Highway 5, 16th Street to Parker Road and Armstrong Drainage. Gary also assisted in the design and performed the AutoCAD work on the $400,000 Hillcrest Avenue Project for Town of University Park. City of Coppell - Denton Tap Road Water Line (WA 97-01) Page [V-7 j:\clerical\coppell\6 i 20 business development\6120-43 denton tap rd wlXsec-4 resume doc Section V SECTION V _ Client References Birkhoff, Hendricks & Conway, L.L.P., Consulting Engineers have provided engineering services to municipalities in North Central Texas for over thirty (30) years. In addition to municipal engineering, the firm has provided the same high quality services to Water Districts, the Texas Department of Transportation and the North Texas Tollway Authority. - The firm has a proven record of quality engineering and has maintained through the years a stable and well-experienced staff. The following references are for your convenience and additional references ._ will be provided upon request: Mr. Gerald P. Cosgrove, P.E. Mr. Steven Bacchus Mr. Meran Dadgostar, P.E. Chief Engineer-CIP Director of Public Services Town Engineer City of Plano City of Lewisville Town of Highland Park Post Office Box 860358 Post Office Box 299002 4700 Drexel Drive Plano, Texas 75086-0358 Lewisville, Texas 75029-9002 Highland Park, Texas 75205 (214) 424-6531 (214) 219-3400 (214) 521-4161 Mr. Jim Sparks, P.E. Mr. Jack D. Angel, P.E. Mr. James M. Parks, P.E. Director of Public Works Director of Public Works Deputy Director City of Cedar Hill City of Irving North Texas Municipal Water District P. O. Box 96 Post Office Box 152288 Post Office Box 2408 Cedar Hill, Texas 75106-0096 Irving, Texas 75015-2288 Wylie, Texas 75098 (214) 291-5100 (214) 721-2600 (214) 442-5405 Mr. Bob Sokoll Mr. Bill Lindley Mr. John R. Baumgartner, P.E. City Manager City Manager Dir. of Public Works/City Engineer City of Waxahachie City of Colleyville City of Allen P. O. Box 757 P.O. Box 185 One Allen Civic Plaza Waxahachie, Texas 75165 Colleyville, Texas 76034-0185 Allen, Texas 75013 (214) 937-7330 (817) 577-7575 (972) 727-0178 Mr. Ron W. Haynes, P.E. Mr. Jimmy Stathatos Mr. Timothy S. Fisher, P.E. Director of Public Works City Manager Manager, Water Production Division City of Hurst City of Roanoke City of Denton 1505 Precinct Line Road 201 Bowie Street 1701-B Spencer Road Hurst, Texas 76054 Roanoke, Texas 76262 Denton, Texas 76205 (817) 281-6160 (817) 491-2411 (940) 566-8200 Mr. Perry L. Harts, P.E. Mr. Dan Sefko Mr. Jerome V. Murawski, Jr., P.E. Director of Development Services J.T. Dunkin & Associates, Inc. City Engineer City of Frisco 9876 Plano Road City of Farmers Branch 6891 Main Street Plano, Texas 75238 Post Office Box 819010 Frisco, Texas 75034 (214) 553-5778 Farmers Branch, Tx 75381-9010 (972) 335-5551 (972) 919-2588 City of Coppell - Denton Tap Road Water Line (WA 97-01) Page V-1 j:\clerical\coppell\6120 business development\6120-43 denton tap rd wi\sec-5 re£ doc Section VI CO?I E, LL SECTION 6 - EXPERIENCE · Examples of Projects Completed for The City of Coppell · Examples of Water Line Projects Complete By: Birkhoff Hendricks & Conway, L.L.P. (Last lO-Years) Birkhoff, Hendricks & Conway, L.L.P. has enjoyed a long-standing relationship with the City of Coppell, dating back to early 1991. At that time, we provided in-house engineering services including development review, design and capital improvement plan coordination. After the City employed a full-time staff engineer, Birkhoff Hendricks & Conway, L.L.P. (then Shimek, Jacobs & Finklea, L.L.P.) continued providing services to the City, including water system master plan and analysis, and design services for improvements to the water system. These improvements included a 6.0-MG Ground Storage Reservoir, a 2. O,MG Elevated Storage Tank, and two expansions of the Village Parkway Pump Station. The list that follows more specifically outlines our professional experience with the City of Coppell. Please note our firm does not provide development engineering services in the City of Coppell or elsewhere. - CITY OF COPPELL, TEXAS Projects Completed By Birkhoff, Hendricks & Conway, L.L.P. Year I Proiect Description I Project Manager Plans, specifications and construction administration for the extension of the S.H. 121 and 2002 Spur 553 12" Water Line. Sary Hendricks Update of the City's water distribution system hydraulic model, master plan map and report. Includes a demand study, system pressure gauges and geographic coding of the residential system 2001 demands. ,3ary Hendricks Field Surveys and Technical Drafting for the City designed Meado~v Creek Water Line, Meadow 2001 Creek Box Culvert and the Southwestern Blvd. Sanitary Sewer Replacement 3ary Hendricks Plans, specifications, contract administration and quality control for the repaint of the interior bowl of the existing 1.5 MG Elevated Storage Tank. Project includes installation of a 24" motor' operated valve and an inspection report for the exterior tank paint system and interior paint systerr 1999 of the column. 3ary Hendricks Il) Installation of Pump No. 4 at the Village Parkway Pump Station. (2) Installation of Transil l'ime Meter to Replace existing Venturi Tube. (3) Installation of Isolation Valves for Pumps 1, 2 1999 and 3. 3ary Hendricks Plans, specifications and contract administration for the S.H. 121, from Sandy Lake Rd. tc Corporate Dr. Approximately 4,500 linear feet of 12-inch water line along the easterly right-of-wa~ 1998 of S.H. 121. 3ary Hendricks Update the City's existing water distribution hydraulic model to show new subdivisions and developments since the last update. Evaluate the existing system maximum daily and maximurr 1997 hourly demands using data provided by the City from the summer of 1996 3ary Hendricks Preparation of plans, specifications and construction administration for the construction of the 24" Sandy Lake Road Water Line. Project length 2 miles. Approximately 10,000 linear feet of 24" 1996 ~vaterline from Denton Tap Road to Wagon Wheel Ranch Elevated Storage Tank Gary Hendricks Preparation of plans, specifications and construction administration for Wagon Wheel Ranch 2.(I 1996 Million Gallon Elevated Storage Tank Gary Hendricks 1996 Preparation of specifications for Water and Wastewater SCADA System John Birkhoff 1996 Hydraulic Analysis of the City's existing Water Distribution System and brief letter report Gary Hendricks Preparation of plans, specifications, contract documents and construction administration for improvements to Village Parkway Pump Station No. 2. Installation of 2-pumps, additions to 1994 gtructure, addition of a disinfection system, and a System Wide §CADA System Gary Hendricks ?reparation of plans, specifications and contract documents for Village Parkway Ground Storage 1994 Reservoir No. 2 (6 MG capacity) (AWWA D110, Type III) Gary Hendricks Preparation of Maps and Application for a Certificate of Convenience and Necessity covering the 1991 Water and Sanitary Sewer Systems Ross Jacobs 1991 Coordination of City's Subdivision Platting Process Gary Hendricks City of Coppell - Denton Tap Road Water Line (WA 97-01) Page VI-I j:\clerical\coppell\6120 business development\6120-43 denton tap rd wl\coppell projects.doc WATER LINE PROJECTS SPECIFIC EXPERIENCE RELATED TO THIS PROJECT Completed by Birkhoff, Hendricks & Conway, L.L.P. (Last lO-Years) Owner's Name/ Construction Construction BH&C's Telephone Number Project Description Completion Date Cost Design Team ~ity of Lewisville 12" Piano Parkway Emergency Waterline Connection Susan Weaver, P.E. (972) 219-3400 to the 18" Waterline in The Colony 2002 $111,000 Ron Conway Uity of Rockwall Paul Carline Thuck Todd, P.E. (972) 771-7790 780 Service Area waterline improvements project. Gary Hendricks City of Farmers Branch Villa Marquis 6" and 8" waterline replacement project, John Birkhoff Ms. Sallie Mullins (972) 247-3131 approximately 1,000 L.F. of replacement 2002 Ron Conway Silver Creek 12" Waterline, include 3,150 LF of 12" AWWA C-900 waterline by open cut, 590 LF of 12" City of DeSoto AWWA C-900 waterline by other than open cut, and Matt Hickey l'om Johnson, P.E. (972) 230-9640 seven 12" resilient seated gate valves Apr-02 $310,000 John Birkhoff ,Tity of Murphy 3,400 feet of 16" waterline and 3,000 feet of 20" Ron Conway Roy Bentle (972) 424-6021 waterline Oct-01 $320,000 Joe Carter City of DeSoto Mountain Laurel Waterline Extension. This project John Birkhoff I'om Johnson, P.E.(972) 230-9640 includes approximately 1300 L.F. of 18" waterline $130,000 Matt Hickey City of Waxahachie Backside of Dam, Bardwell Raw Waterline consisting Ron Conway Jeff Chambers (972) 337-0941 of 3,285-feet of 24" waterline Mar-02 $304,000 Gary Hendricks Tity of Allen Hedgcoxe 24" Waterline from Duchess Drive to John Birkhoff lohn Baumgartner (972) 727-0100 Longwood Dr. The length of the project is 2600 LF Matt Hickey 121 Site Facility Pipeline along the Southern Pacific North Texas Municipal Water Dist. Railroad from McKinney to Melissa. Approx. length Ross Jacobs P,,andel Dobbs (972) 442-5405 0f26,500 L.F. of 12" Water Transmission Pipeline Nov-01 $1,373,000 Matt Hickey US 75 Water Transmission Line, including ,Tity of Plano approximately 1000 L.F. of 24 and 18" waterlines and John Birkhoff lerry Cosgrove (972) 941-7152 a bore across US 75. May-02 $460,000 Matt Hickey Eity of Plano Chase Oaks Water Transmission Lines. This project John Birkhoff lerry Cosgrove (972) 941-7152 included approximately 2600 L.F. of 24" waterline. May-02 $460,000 Matt Hickey ;',830 LF of 24" waterline & 770 LF of 16" waterline along Future Alma Road for the Community Park 3.0 MG Elevated Tank. The project also includes 425 LF City of McKinney of 24" Waterline along Industrial Blvd. for the Matt Hickey Jack Cart (972) 562-6080 Industrial 2.0 MG Elevated Tank Jul-01 $485,000 John Birkhoff 12,100 L.F. of 12" waterline to serve the Walgreen City of Waxahachie Distribution Center area at northwest comer of U.S. Gary Hendricks leffChambers (972) 337-0941 Hwy 287 By-Pass & I.H. 35E. Apr-01 $305,146 Ron Conway Engineering services for a route study for the proposed ,Tity of McKinney City of Irving Water Supply Linc through the City of John Birkhoff Jack Cart (972) 562-6080 McKinney Ross Jacobs Update of the City's Water Distribution System Map including locations of fire hydrants, valve, pump Tity of Roanoke stations, elevated tanks, ground storage tanks and Gary Hendricks Jimmy Stathatos (817) 491-2411 ~oints of delivery Paul Carline Schertz/Seguin Water Supply System's Water Supply Roming, Parker & Kasberg, L.L.P. Line between Schertz and Seguin. Approximately John Birkhoff Flay Roming (254) 773-3731 3.7-miles of 30" line Apr-02 $10,000,000 Ross Jacobs City of Coppell - Denton Tap Road Water Line (WA 97-01) Page V1-2 j:\clerical\coppell\6120 business development\6120-43 denton tap rd wi\waterline projects.doc Owner's Name/ [Construction [Construction BH&C's Telephone Number · Project Description Completion Date Cost Design Team Indian Hills/Highway 287 Bypass Waterline, approx. City of Waxahachie 4,900 L.F. of 18" waterline along the east right-of-way Gary Hendricks JeffChambers (972) 337-0941 of Highway 287 and 800 line Nov-01 $318,440 Ron Conway City of Murphy Emergency electrical generator for the North Star Ron Conway Roy Bentle (972) 424-6021 Pump Station Nov-00 $119,900 Gary Hendricks 27" diameter 9.5 mile long Bardwell Parallel Raw City of Waxahachie Water Supply Line from Bardwell Lake to Lake Ron Conway Jeff Chambers (972) 337-0941 Waxahachie. Jan-01 $4,100,000 Gary Hendricks City of McKinney F.M. 720 - 42" Waterline from F.M. 720 Pump Station John Birkhoff lack Carr (972) 562-6080 to Lake Forest Dr. (8,200 L.F.) $1,332,000 Don Johnson ~ity of Lewisville 9,200 L.F., 36" dia. Dallas Water Supply Line #2 and Ron Conway Susan Weaver, P.E. (972) 219-3400 4,440 L.F. of 24", 20", 16" & 12" Water Distribution Dec-01 $2,648,000 Joe Carter Zity of Plano Ridgeview Transmission Lines - Hedgcoxe and Alma John Birkhoff lerry Cosgrove (972) 941-7152 Sections (42" through 24") Dec-00 $2,724,146 Brad Bernhard Zity of Euless Southside 16" Waterline - Pipeline Road to S.H. 183 Matt Hickey Albert Hall (817) 267-4403 (approximately l 1,000 L.F.) Jul-01 $1,100,000 John Birkhoff ~,ity of Plano ]'hree meter vaults to serve The Colony from the City John Birkhoff Jerry Cosgrove (972) 941-7152 of Plano Don Johnson Zity of Euless John Birkhoff Albert Hall (817) 267-4403 8400 L.F. of 12" waterline along Mid-Cities Boulevard Aug-99 $300,000 Matt Hickey Surveying Services & Design of Waterlines for the Distribution System of the City of Irving in the Zity of Irving fo]lowing locations: State Highway 183; MacArthur Joe Carter David M. Mullins (972) 721-2600 Blvd.; Story Road; and Irving Blvd. $1,222,000 Gary Hendricks Zity of Plano John Birkhoff lerry Cosgrove (972) 941-7152 Wentworth 20" and 15" Waterlines. $1,400,000 Matt Hickey Zity of Murphy Ron Conway Roy Bentle (972) 424-6021 F.M 544 Utility Adjustments Jun-00 $147,073 Gary Hendricks 600 L.F. of 18" waterline from the Indian Tower Elevated Tank, east across By-Pass U.S. 287 by boring 2ity of Waxahachie & approx. 3,500 LF of 12" waterline along the Easterly Gary Hendricks leffChambers (972) 337-0941 ROW of By-Pass U.S. 287 to Broadhead Road Nov-99 $348,958 Brad Bernhard $.H. 121, from Sandy Lake Rd. to Corporate Dr. iCity of Coppell Approximately 4,500 L.F. of 12" waterline along the Gary Hendricks Kenneth Griffin (972) 462-0022 easterly right-of-way of S.H. 121. Dec-99 $178,344 Paul Carline City of Cedar Hill 7,800 L.F. of 20" waterline in Lakeridge Parkway, Gary Hendricks Jim Sparks (972) 291-5100 from Texas Plume Road to U.S. Highway 67. Nov-99 $472,132 Brad Bernhard City of Farmers Branch Waterlines in the West Service Area and the Central John Birkhoff Sallie Mullins (972) 247-3131 Service Area. This project includes Route Study $1,035,000 Don Johnson Route study for connection to proposed Dallas Supply Line to the Wicker Street Pump Station. Study to City of Farmers Branch include the use of digital aerial photograph of general John Birkhoff Sallie Mullins (972) 247-3131 area Don Johnson Plano Ridgeview Water Transmission Pipeline - Phase North Texas Municipal Water Dist. Il, Section 1. (3,400 L.F. of 48"; 10,200 L.F. of 42"; John Birkhoff Randel Dobbs (972) 442-5405 2,250 L.F. of 20"; and 13,300 L.F. of 24" Waterlines) $4,800,000 Ross Jacobs City of Waxahachie U.S. Highway 77 Water Line Extension (16,000 feet of! Ron Conway Jeff Chambers (972) 337-0941 12" Waterline along U.S. 77) Dec-99 $584,955 Gary' Hendricks City of Waxahachie Ron Conway Jeff Chambers (972) 337-0941 Patrick Road Waterline at U.S. 287 Bypass. Apr-98 $100,014 Gary Hendricks City of Coppell - Denton Tap Road Water Line (WA 97-01) Page VI-3 j:Sclerical\coppell\6120 business development\6120-43 denton tap rd wi\waterline projects doc _ Owner's Name/ Construction I Construction I BH&C's Telephone Number Project Description Completion DateI lC°st Design Team Investigation of alternatives for thc rehabilitation of the _ City of DeSoto 20" waterline attached to the Polk Street Bridge. With John Birkhoff ]'om Johnson, P.E.(972) 230-9640 selected rehab method Aug-97 Matt Hickey 8" waterline replacements in Peach Street (2,900 L.F.), City of DeSoto Pinetree Drive (2,300 L.F.) and Windwood/ John Birkhoff ]'om Johnson, P.E.(972) 230-9640 Tanglewood (2,000 L.F.) with a parallel 16" waterline Dec-98 $544,774 Matt Hickey North Texas Municipal Water Dist. John Birkhoff Randel Dobbs (972) 442-5405 Plano Ridgeview Water Transmission Pipeline - Ph I Jun-98 $5,734,550 Ross Jacobs City of Cedar Hill a) Belt Line Road 12" waterline from U.S. Hwy 67 to Gary Hendricks lim Sparks (972) 291-5100 Roberts Street. b) Cedarview 8" waterline repair May-97 $165,000 Ron Conway __ Ellis County WC&ID No. I Ron Conway Robert W. Sokoll (972) 938-2101 Lake Waxahachie Waterline Extension Oct-97 $67,373 Gary Hendricks 18" Marsh Lane Waterline upgrade and replacement __ City of Farmers Branch from Brookhaven Drive to Valley View Elevated John Birkhoff Sallie Mullins (972) 247-3131 Storage Tank - project length 3,000 L.F.. Jan-99 $511,854 Matt Hickey City of Murphy F.M. 544 Waterline and the McMillen Road Waterline Ron Conway _ Ro7 Bentle (972) 424-6021 Replacement Jul-97 $50,355 Gary Hendricks 24" Sandy Lake Road Waterline. Project length 2 City of Coppell miles, approx. 10,000 L.F. of 24" waterline from Gary Hendricks Kenneth Griffin (972) 462-0022 Denton Tap Road to Wagon Wheel Ranch Elevated Dec-96 $1,200,000 John Birkhoff 18" Denton Drive Waterline upgrade and replacement City of Farmers Branch from Valley View to Spring Valley. Project length Sallie Mullins (972) 247-3131 5765 L.F. Jun-99 $817,808 John Birkhoff City of DeSoto 8" Waterline Replacement in Spinner Road. Project John Birkhoff Tom Johnson, P.E.(972) 230-9640 length approximately 2,740 L.F. Jul-97 $303,862 Gary Hendricks City of Plano Communications Dr. & Spring Creek Pkwy Alignment Jerry Cosgrove (972) 941-7152 - R.O.W. and Waterline Easements John Birkhoff Town of Addison Steve Chutchian, P.E.(972) 450-7000 Beltwood Parkway Waterline Replacement John Birkhoff City of Cedar Hill U.S. Highway 67 Waterline, from Texas Plume Road Gary Hendricks Jim Sparks (972) 291-5100 to the U.S. Pipe Concrete Plant Aug-96 $312,817 Ron Conway _~ City of Farmers Branch Ron Conway Sallie Mullins (972) 247-3131 Gillis Street Waterline Relocation Oct-95 Gary Hendricks City of Cedar Hill 24" Joe Wilson Road Waterline from U.S. Hwy 67 to Gary Hendricks _ Jim Sparks (972) 291-5100 Belt Line Road. Project length 10,000 L.F. Oct-98 $637,340 Ron Conway City of Lancaster 6" Wilson Street Waterline Replacement. Project Jason E. Cosby (972) 227-2111 length 1755 L.F. along Residential Streets John Birkhoff -- City of Red Oak Mr. Ken Pfeifer (972) 617-3638 Water & Sewer Utility Adiustments along F.M. 664 John Birkhoff Pump Station Main - Ridgeview to Hedgcoxe (8,860 - City of Plano L.F. of 42"; 4,820 L.F. of 36"; and 2,707 L.F. of 12" John Birkhoff Jerry Cosgrove (972) 941-7152 Waterlines) $1,100,000 Ross Jacobs City of Red Oak -~ Mr. Ken Pfeifer (972) 617-3638 Grant Application for Hilltop Acres Waterlines John Birkhoff City of Cedar Hill 8" South Tar Road Waterline. Project length 3,500 Gary Hendricks Jim Sparks (972) 291-5100 L.F. Sep-94 $147,000 Ron Conway City of Irving Joe Carter David M. Mullins (972) 721-2600 O'Connor Road Waterline - Sections 1 & 2. Nov-98 $2,000,000 Ron Conwa¥ City' of Coppell - Denton Tap Road Water Line (WA 97-01) Page V1-4 j:\clerical\coppell\6120 business development\6120-43 denton tap rd wi\waterline projects doc Owner's Name/ Construction Construction t BH&C's Telephone Number Project Description Completion Date CostI Design Team City of Red Oak Location Map for City of Red Oak TWDB Application Mr. Ken Pfeifer (972) 617-3638 for Waterlines in Hilltop Acres John Birkhoff City of Farmers Branch Ron Conway Sallie Mullins (972) 247-3131 Waterlines in Northeast Farmers Branch Jan-94 John Birkhoff City of Cedar Hill Gary Hendricks Jim Sparks (972) 291-5100 F.M. 1382 Water and Sewer Utility Relocations Jan-93 $67,100 Ron Conway City of Piano John Birkhoff Jerry Cosgrove (972) 941-7152 Water and Wastewater Crossing Dallas North Tollway $116,700 Ross Jacobs City oflrving Utility Adjustments and 42" Waterline Crossing on Ron Conway David M. Mullins (972) 721-2600 Royal Lane $345,000 Ross Jacobs Joe Caner City of Irving New Water Supply Line and revise Water Distribution Ron Conway David M. Mullins (972) 721-2600 System Plan $9,000,000 Gary Hendricks City of Cedar Hill Gary Hendricks Jim Sparks (972) 291-5100 6" Summit Place Waterline Connection Jul-91 $25,000 Ron Conway City of Waxahachie Removal of silt from the intake structure at Lake Ron Conway leffChambers (972) 337-0941 Waxahachie Waterline Extension May-91 $327,500 Joe Carter Detailed description of project included in the preceding pages. Estimated completion date and opinion of construction cost. City of Coppell - Denton Tap Road Water Line (WA 97-01) Page VI-5 j:\clerical\coppell\6120 business development\6120-43 denton tap rd wi\waterline projects doc p BIRKHOFF, HENDRICKS & CONWAY, I..L.P. CONSUl,TING ENGINEERS TYPICAL MUNICIPAL SERVICES ~ · Consultation · Pavement Marking and Signage Plans  · Act as City Engineer's Staff · Pump Station Additions [ · Analysis of isolated Drainage Problems. · Site Studies Recommendation for solutions. · Rate Studies Il · Presentations to Citizen Groups · Impact Fee Analysis · Cost Estimating · Sanitary Sewer Flow Studies Monitoring · Sanitary Sewer and Water Rehabilitation · Tank Repaints · Subdivision Plat and Plan Review · Intersection Improvements  · Pavement Overlays · Right-of-Way Acquisition · Pavement Reconstruction I · Right-of-Way and Easement Plat and Field Note Preparation · Cooling Tower Replacement · Property Surveys · Potable Water Disinfection Analysis I1! · Field Surveys · Value Engineering III · Drafting · Grant Application Assistance ' · EPA Administrative Order Reply Letters · Monitoring and Control Systems ]]il · Water Distribution Studies and Modeling ·Preparation of C.I.P. Programs · Sewer Studies and Modeling · Sewer and Water Lines Design · · Water Supply Studies · Water Pump Stations Design I · Contract Review · Sanitary Sewer Lift Station Design · Preparation of Draft Ordinances · Elevated Storage Tanks I · Lighting Projects · Ground Storage Reservoirs I · Fuel Depots/Storage · Emergency Generators I 751)J Green vii/r..! yen, e, #22 ti Dallas, T~:x'a,% 75231 (J 14) 3 ti I- 7900 T H ir . C: I T Y · 0 Ir COPi ELL DENTON TAP ROAD WATER LINE Bethel Road to Airline Drive (Project WA 97-0D BIRKHOFF, HENDRICKS & CONW.4 Y, L.L.P. CONSUL TING ENGINEERS D,4LLAS, TEX.4S (214) 361-7900 JA NUA R Y 2002