Loading...
ST0001-LR020129 (2)8908 Ambassador Row Dallas, Texas 75247-4510 (214) 630-9745 (214) 630-9819 (fax) IN-PLACE DENSITY TESTING Client: City of Coppell ACm: Ms. Susan Taylor - Engineering Dept PO Box 478 Coppell TX 7510~9 Project:~ Drive and~ Services: perform In-Place Density Test in accordance with ASTM Standards. PROJECT DATA Report No.: 142242 Project No.: 015729 Date of Service: 01/18/2002 Report Date: 01/29/2002 CONTRACTOR: Infrastructure Services, Inc. Te~t Methods: ASTM D-2922 ASTM D-3017 M/D No. Description Gauge: Troxler 3430 Moisture Gauge Serial No: 32685 Current: 640 Test Mode: DT Previous: 645 MOISTURE DENSITY RELATIONS Maximum Moisture % Density pcf Standard Counts Density Current: 3008 Previous: 3010 Project Requirements Moisture Density Dark Brown Clay, trace calcareous nodules 18.0 105.0 Optimum +5 95 rain FIELD DENSITY TESTS TEST PROBE M/D MOISTURE WET DENSITY DRY DENSITY DENSITY NO TEST LOCATION DEPTH No. (%) OeO (pc0 (% max) Utility Trench 6" 99 1 Crossover, Creekview, Station 18+00, 2' 1 22.4 127.4 104.1 below grade Utility Trench 6" 99 2 Crossover, Creekview, Station 18+00, final 1 22.7 127.4 103.8 Utility Trench 6" 99 3 Crossover, Creekview, Station 24+25, 2' 1 21.3 126.2 104.0 below grade Utility Trench 6" 96 4 Crossover, Creekview, Station 24+25, final 1 22.8 123.2 100.3 Utility Trench · ' · + ' 6" 97 5 Waterline, Croekview, Stataon 27 00, 2 1 23.2* 126.0 102.3 belowgrade E~,.. ~ .~0~~ ,~d LIMITATIONS: The test r~sults presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control, Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineers, Inc. 07DK Page I of 2 RoneEngJneers Report No.: 142242 i~mmm~l Project No.: 015729 Client: City of Coppell TEST PROBE NO TEST LOCATION DEPTH M/D MOISTURE WET DENSITY DRY DENSITY DENSITY No. (%) (pc0 (pc0 (% max) 6 Tests approved by city of Coppell Inspector Larry Davies. Utility Trench 6" Waterline, Creekview, Station 27+00, final 1 23.3* 129.2 104.8 An asterisk (*) appears next to test results which do NOT meet the project specifications. Started: 5:00pm Finished: 6:00pm (1) City of Coppoll (1) Schrickel, Rollins & Assoc., Inc. Technician: Joe Jernigan Report Distribution: (1) City of Coppoll (1) City of Coppoll (1) City of Copp¢ll (1) Infrastructure Services, Inc. 100 Project~i [anager LIMITATIONS: The test results presented herein were prepared based upon the specific samples ptovided for testing. We assume no responsibility for variation in quality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over wMch we have no consol. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Ronc F~agineers, Inc. 07DK Pnge 2 of 2 RoneEngineers 8908 Ambassador Row Dallas, Texas 75247-4510 (214) 630-9745 (214) 630-9819 (fax) IN-PLACE DENSITY TESTING Client: Project: Services: City of C0ppell Attn: Ms. Susan Taylor - Engineering Dept PO Box 478 Coppell TX 75109 Creekview Drive and Freeport Parkway Coppell, TX Perform In-Place Density Test in accordance with ASTM Standards. PROJECT DATA Report No.: 142241 Project No.: 015729 Date of Service: 01/16/2002 Report Date: 01/29/2002 CONTRACTOR: Infrastructure Services, Inc. Test Methods: ASTM D-2922 ASTM D-3017 M/D No. Description Standard Counts Density Current: 3018 Gauge: Troxlcr 3430 Moisture Gauge Serial No: 32685 Current: 644 Test Mode: DT Previous: 69 Previous: 3038 MOISTURE DENSITY RELATIONS Maximum Project Requirements Moisture % Density pcf Moisture Density Dark Brown Clay, trace calcareous nodules 18.0 105.0 Optimum +5 95 mia FIELD DENSITY TESTS TEST PROBE NO TEST LOCATION DEPTH M/D MOISTURE WET DENSITY DRY DENSITY DENSITY No. (%) (pcO (Pc0 (% max) Waterline 6" 95 1 Creekview, Station 21+00, 2' below grade 1 19.2 118.7 99.6 Waterline 6" 96 2 Creekview, Station 21+00, final 1 18.6 119.2 100.5 Waterline 6" 99 3 Creekview, Station 24+00, 2' below grade 1 18.3 122.6 103.6 Waterline 6" 97 4 Creekview, Statiou 24+00, final 1 20.1 122.4 101.9 Test results on this report meet project specification. Technician: Joe Jemigan Report Distribution: (1) City of Coppe0 (1) City of Coppall (1) City of Coppall (1) Infrastructure Services, Inc. Started: 3:00pm Finished: 4:30pm (1) City of Coppell (1) Schfickal, Rollins & Assoc., Inc. Project Manager LIMITATIONS: The test ~sults presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, performance, eW.) or any other feature of similar subject matter provided by persons or conthtions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineers, Inc. 07DK Page 1 of I RoneEn g Client: Project: Services: City of Coppell Attn: Ms. Susan Taylor - Engineering Dept PO Box 478 Coppell TX 75109 Creekview Drive and Freeport Parkway Coppell, TX perform In-Place Density Test in accordance with ASTM Standards. PROJECT DATA 8908 Ambassador Row Dallaa, Texas 75247-4510 (214) 630-9745 (21.4) 630-9S19 (fax) IN-PLACE DENSITY TESTING Report No.: 141761 Project No.: 015729 Date of Service: 01/14/2002 Report Date: 01/29/2002 CONTRACTOR: Infrastructure Services, Inc. Test Methods: ASTM D-2922 ASTM D-3017 M/DNo. DeseHpflon Gauge: Troxlar 3430 Moisture Gauge Serial No: 32685 Current: 639 Teat Mode: DT Previous: 666 MOISTURE DENSITY RELATIONS Dark Brown Clay, trace calcareous nodules Maximum Moisture % Density pcf 18.0 Standard Counts Density Current: 3043 Previous: 3099 Project Requirements Moisture Density 105.0 Optimum +5 95 min FIEI,D DENSITY TESTS TEST PROBE NO TEST LOCATION DEPTH M/n MOISTURE WET DENSITY DRY DENSITY DENSITY No. (%) (pc0 (pcO (% max) Utility Trench 1 8" waterline, Creekview, Station 6+00, 2' 6" below grade Utility Trench 2 8" waterline, Creekview, Station 6+00, final 6" Utility Trench 3 8" waterline, Creekview, Station 12+50, 2' 6" below grade Utility Trench 4 8" waterline, Creekview, Station 12+50, 6" Technician: Joe Jernigan Report Distribution: (1) City of Coppell (1) City of Coppell (l) City of Coppell (1) InfrasWacture Services, Inc. 1 22.1 122.8 100.6 96 1 21.6 122.1 100.4 96 1 21.5 122.1 100.5 96 1 19.4 122.3 102.4 98 Started: 12:30p (1) City of Coppell (1) Schrickel, Rollins & Assoc., Inc. Test results on this report meet project specification. Finished: 3:00pm Ro~ Cia nc, Stark Proj~t Manager LIMITATIONS: Thc test results presented hereto were prepared based upon the specific samples provided for testing. We assume no responsththty for vanaOon m quality (composition, appearance, performance, etc.) or any other feature of similar subject maaer provided by persons or conditions over which we have no control. Our l~crs and reports are for thc exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the writt~ appwval of Rone Engineers, Inc. 07DK Page I of 1