ST9905-CS020207LETTER OF TRANSMITTAL
3010 LBJ Freeway, Suite 990 (972) 280-9300 * Fax (972) 280-9715
TO:
FROM:
Mr. Ken Griffin, P.E.
Director or Engineering and Public Works
255 Parkway
Coppell, TX 75019
Paul Padilla
DATE: February 7, 2002 NO.
RE: Bethel Roadway and Drainage Imp.
Storm Drain Plans (60%)
WE ARE SENDING YOU VIA: [] Mail [] Delivery, THE FOLLOWING ITEMS:
COPIES I DESCRIPTION
2 sets Full Size Preliminary Storm Drain (60%)
2 sets Half Size Preliminary Storm Drain Plans (60%)
THESE ARE TRANSMYIq'ED AS CHECKED BELOW:
[] For Your Use
X As Requested
[] For Review and Comment []
[] For Approval []
Approved as Submitted
Retumed for Corrections
See Remarks
[] Approved as Noted
[] Rejected
REMARKS:
Ken,
Attached are Full & Half Size Preliminary Storm Drain Plans (60%) for your review and comment. Per our meeting
on 1-18-02, this set has been re-oriented with north at the top of the page to match the roadway plan layout.
Craig
CoPY TO: SIGNED:
Craig Bond, P.E.
\~DL SERVERXDATASX200\00890 CoppelBadm\Faxes and Transmittals\T ken2.doc