PA9702-LR 991005CONCRETE COMPRE 3IVE STRENGTH TES
8901 Carpenter Frwy., Suite#100
Dallas, Texas 75247
Date of Service: 09/17/1999 Report No.: 9925287 Report Date
10/05/1999
Client No.: COPPELL Project No.: 949911 lg
Client: City of Cn 11 Project: Coppell Aquatic/Recreation Ctr
Attn: Bra~id 30~ Block of Parkway Blvd
732 DeForest
Coppell TX 75019 Coppell, Texas/Prj. ~6051
Services: ObtMn samples of fresh concrete at the placement locations, perform required field test and cast
compressive strength samples.
PROJECT DATA
CONTRACTOR: Hisaw & Assoc. CONCngXg C~ASS: 6 Sack
CONCRETE SUPPLIER: Nelson Brothers PLACEMENT DATE: 09/17/1999 BATCH TIME: 8:30am
PLANT: Lewisville TIME SAMpLED: 9:40am BY: Mike Shields
SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Sunny
STRENGTH: 4000 psi @ 28 Days TEMpERATURE (F) - AIR 73 F CONCRETE: 83 F
SLUMP: 5-7" TRUCK NO: 220 TICKET NO: 77739
AIR: N/A AIRCONTENT(%): N/A UNIT WEIGHT (pcf): N/A
TEST METHOD: ASTM C- 143 PLACEMENT LOCATION:
Pier information and technician time: See Report ~)9.25286
ASTM C-172
ASTM C-39
SAMPLE LOCATION: Pier P/2
REPORT OF TESTS ACCUMULATIVE YARDS: 10
CYLINDER MEASURED MAXIMUM COMPRESSIVE
MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE
SET NO. (inches) TESTED (days) (Ibs. force) (psi) TYPE
1 1 5.50 09/24/1999 7 108100 3820
I 2 5.50 09/24/1999 7 103460 3660
Average 3740
1 3 5.50 10/15/1999 28
1 4 5.50 10/15/1999 28
Technician: Mike Shields Started: Finished: }'~ ~ring~ Inc.
Report Distribution:
(l) City of Coppcll (1) City ofCoppcll - Engineering
(t) Brinkicy Sargent Architects (1) City ofCoppcll - Bldg. lnsp. Eugene Harbour
(1) Turner Engineers (1) City of Coppall - Leisure Scrv Dcpt Vice President
(1) Hisaw & Associates
This report is exclusively for the use of the client indicated above and shall not bo reproduced cxoept in full without the written approval of HBC Engineering,, Inc.
0ILL Page 1 of I