Amberpoint BP-LR020124WATER INJECTION OBSERVATION
ENGINEERIlX~, INC.
Date of Service:
Client No.:
Client:
Location:
Procedure:
01/24/02
3181
Transwestern Commercial Services
5001 Spring Valley Rd, Suite 600 W
Dallas, TX 75244
Building Pad
Report No.: 94021029.0012
Project No.: 94021029
Project: ,,,,fi~mbe¢oint Building No. 1
~r Ambe~,rpoint Bus. Pk ~ Coppell
'~"~11, Texas
General Contractor: Hill & Wilkinson
Injector: Jowell
On this date, a representative of HBC Engineering, Inc. observed the injection of water at this
site. During the injection process, the following observations were recorded.
Pass No.: 1st No. of Probes: 4 Probe Length: 12 feet
OBSERVATION
SPECIFICATION Yes No N/A
Surfactant added to each load. X
Injection pressure 50 to 200 psi at manifold. X
Injection downward in 18 inch intervals. X
Total depth of injection was 10 feet. X
Spacing of injection was 5 feet maximum. X
Iniection to refusal at each location. X
Comments:
Technician: S. Campbell
Report Distribution:
(1) Tnmswestem Commercial Sewices
(1) O'Brien & Associates, lnc.
(1) TechniStructums, Inc.
(1) City of Coppell - Constr. lnsp.
(i) City of Coppell - Bldg. lnsp.
(1) Hill & Wilkinson, Ltd.
I--BC Engineering, Inc.
Eugene Harbour
Principal
99ss l~is report is exclusively for the use of the client indicated above and shall not be reproduced in full without written approval of HBC Engineer
WATER INJECTION OBSERVATION
ENG--, INC.
Date of Service:
Client No.:
Client:
01/24/02
3181
Transwestem Commercial Services
5001 Spring Valley Rd, Suite 600 W
Dallas, TX 75244
Report No.:
Project No.:
Project:
94021029.0013
94021029
Amberpoim Building No. 1
Amberpoim Bus. Pk ~ Coppell
Coppell, Texas
Location:
Building Pad
General Contractor:
Injector: Jowell
Procedure:
On this date, a representative of HBC Engineering, Inc. observed the injection of water at this
site. During the injection process, the following observations were recorded.
Pass No.: 1st No. of Probes: 4 Probe Length: 10 feet
OBSERVATION
SPECIFICATION Yes No N/A
Su~actant added to each load. X
Injection pressure 50 to 200 psi at manifold. X
Injection downward in 18 inch intervals. X
Total depth of injection was 10 feet. X
Spacing of injection was 5 feet maximum. X
~iection to refusal at each location. X
Comments:
Technician: S. Long
Report Distribution:
(I) Transwcstem Commercial Services
(1) O'Brien & Associates, Inc.
(1) T¢chniStructurcs, Inc.
(1) City of Coppoll - Constx. lnsp.
(1) City of Coppoll - Bldg. lnsp.
(1) flill & Wilkinson, Ltd.
IBC Engineering, Inc.
Eugene Harbour
Principal
99ss This report is exclusively for the use of the client indicated above and shall not be reproduced in full without wfit[en approval of HBC Enginee'