Loading...
Amberpoint BP-LR020124WATER INJECTION OBSERVATION ENGINEERIlX~, INC. Date of Service: Client No.: Client: Location: Procedure: 01/24/02 3181 Transwestern Commercial Services 5001 Spring Valley Rd, Suite 600 W Dallas, TX 75244 Building Pad Report No.: 94021029.0012 Project No.: 94021029 Project: ,,,,fi~mbe¢oint Building No. 1 ~r Ambe~,rpoint Bus. Pk ~ Coppell '~"~11, Texas General Contractor: Hill & Wilkinson Injector: Jowell On this date, a representative of HBC Engineering, Inc. observed the injection of water at this site. During the injection process, the following observations were recorded. Pass No.: 1st No. of Probes: 4 Probe Length: 12 feet OBSERVATION SPECIFICATION Yes No N/A Surfactant added to each load. X Injection pressure 50 to 200 psi at manifold. X Injection downward in 18 inch intervals. X Total depth of injection was 10 feet. X Spacing of injection was 5 feet maximum. X Iniection to refusal at each location. X Comments: Technician: S. Campbell Report Distribution: (1) Tnmswestem Commercial Sewices (1) O'Brien & Associates, lnc. (1) TechniStructums, Inc. (1) City of Coppell - Constr. lnsp. (i) City of Coppell - Bldg. lnsp. (1) Hill & Wilkinson, Ltd. I--BC Engineering, Inc. Eugene Harbour Principal 99ss l~is report is exclusively for the use of the client indicated above and shall not be reproduced in full without written approval of HBC Engineer WATER INJECTION OBSERVATION ENG--, INC. Date of Service: Client No.: Client: 01/24/02 3181 Transwestem Commercial Services 5001 Spring Valley Rd, Suite 600 W Dallas, TX 75244 Report No.: Project No.: Project: 94021029.0013 94021029 Amberpoim Building No. 1 Amberpoim Bus. Pk ~ Coppell Coppell, Texas Location: Building Pad General Contractor: Injector: Jowell Procedure: On this date, a representative of HBC Engineering, Inc. observed the injection of water at this site. During the injection process, the following observations were recorded. Pass No.: 1st No. of Probes: 4 Probe Length: 10 feet OBSERVATION SPECIFICATION Yes No N/A Su~actant added to each load. X Injection pressure 50 to 200 psi at manifold. X Injection downward in 18 inch intervals. X Total depth of injection was 10 feet. X Spacing of injection was 5 feet maximum. X ~iection to refusal at each location. X Comments: Technician: S. Long Report Distribution: (I) Transwcstem Commercial Services (1) O'Brien & Associates, Inc. (1) T¢chniStructurcs, Inc. (1) City of Coppoll - Constx. lnsp. (1) City of Coppoll - Bldg. lnsp. (1) flill & Wilkinson, Ltd. IBC Engineering, Inc. Eugene Harbour Principal 99ss This report is exclusively for the use of the client indicated above and shall not be reproduced in full without wfit[en approval of HBC Enginee'