Amberpoint BP-LR020125WATER INJECTION OBSERVATION
ENGINEER[NG, INC.
Date of Service:
Client No.:
Client:
01/25/02
3181
Transwestem Commercial Services
5001 Spring Valley Rd., Suite 600 W
Dallas, TX 75244
Report No.:
Project No.:
Project:
94021029.0015
94021029
Amberpoint Building No. 1
Amberpoint Bus. Pk ~ Coppell
Coppell, Texas
Location:
Building Pad
General Contractor: Hill & Wilkinson
Injector: Jowell
Procedure:
On this date, a representative of HBC Engineering, Inc. observed the injection of water at this
site. During the injection process, the following observations were recorded.
Pass No.: 1 st No. of Probes: 4 Probe Length: 10 feet
OBSERVATION
SPECIFICATION Yes No N/A
Surfactant added to each load. X
Injection pressure 50 to 200 psi at manifold. X
Injection downward in 18 inch intervals. X
Total depth of injection was 10 feet. X
Spacing of injection was 5 feet maximum. X
Iq, jection to refusal at each location. X
Comments:
Technician: S. Long
Report Distribution:
(1) Transwestem Commercial Services
(1) O'Brien & Associates, Inc.
(1) TechniStractuves, Inc.
(1) City of Coppell - Constr. Imp.
99ss
~ Engineering, Inc.
(1) City of Coppell - Bldg. Insp.
(1) Hill & Wilkinson, Ltd. ~
Eugene Harbour
Principal
This report is exclusively for the use of the client indicated above and shall not be reproduced in full w~thout wdtten approval of H BC Engineer
WATER INJECTION OBSERVATION
Date of Service:
Client No.:
Client:
01/25/02
3181
Transwestem Commercial Services
5001 Spring Valley Rd, Suite 600 W
Dallas, TX 75244
RepoA No.:
Project No.:
Project:
94021029.0014
94021029
Amberpoint Building No. 1
Amberpoint Bus. Pk ~ Coppell
Coppell, Texas
Location:
Building Pad
General Contractor: Hill & Wilkinson
Injector: .lowell
Procedure:
On this date, a representative of HBC Engineering, Inc. observed the injection of water at this
site. During the injection process, the following observations were recorded.
Pass No.: 2nd No. of Probes: 4 Probe Length: 12 feet
OBSERVATION
SPECIFICATION Yes No NIA
Surfactant added to each load. X
Injection pressure 50 to 200 psi at manifold. X
Injection downward in 18 inch intervals. X
Total depth of injection was 10 feet. X
Spacing of injection was 5 feet maximum. X
Igjection to refusal at each location. X
Comments:
Technician: S. Campbell
Report Distribution:
(1) Transwcstcm Commcrcial Services
(1) O'Brien & Associates, Inc.
(1) TechniStmctures, Inc.
(1) City of Coppell - Constr. lnsp.
99ss
(1) City ofCoppell - Bldg. lnsp.
(1) Hill & Wilkinson, Ltd.
H~ Engineering, Inc.
Eugene Harbour
Principal
This report is exclusively f~r the use of the client indicated above and shalt not be reproduced in full without written approval of HBC Enginee*