Amberpoint BP-LR020125WATER INJECTION OBSERVATION ENGINEER[NG, INC. Date of Service: Client No.: Client: 01/25/02 3181 Transwestem Commercial Services 5001 Spring Valley Rd., Suite 600 W Dallas, TX 75244 Report No.: Project No.: Project: 94021029.0015 94021029 Amberpoint Building No. 1 Amberpoint Bus. Pk ~ Coppell Coppell, Texas Location: Building Pad General Contractor: Hill & Wilkinson Injector: Jowell Procedure: On this date, a representative of HBC Engineering, Inc. observed the injection of water at this site. During the injection process, the following observations were recorded. Pass No.: 1 st No. of Probes: 4 Probe Length: 10 feet OBSERVATION SPECIFICATION Yes No N/A Surfactant added to each load. X Injection pressure 50 to 200 psi at manifold. X Injection downward in 18 inch intervals. X Total depth of injection was 10 feet. X Spacing of injection was 5 feet maximum. X Iq, jection to refusal at each location. X Comments: Technician: S. Long Report Distribution: (1) Transwestem Commercial Services (1) O'Brien & Associates, Inc. (1) TechniStractuves, Inc. (1) City of Coppell - Constr. Imp. 99ss ~ Engineering, Inc. (1) City of Coppell - Bldg. Insp. (1) Hill & Wilkinson, Ltd. ~ Eugene Harbour Principal This report is exclusively for the use of the client indicated above and shall not be reproduced in full w~thout wdtten approval of H BC Engineer WATER INJECTION OBSERVATION Date of Service: Client No.: Client: 01/25/02 3181 Transwestem Commercial Services 5001 Spring Valley Rd, Suite 600 W Dallas, TX 75244 RepoA No.: Project No.: Project: 94021029.0014 94021029 Amberpoint Building No. 1 Amberpoint Bus. Pk ~ Coppell Coppell, Texas Location: Building Pad General Contractor: Hill & Wilkinson Injector: .lowell Procedure: On this date, a representative of HBC Engineering, Inc. observed the injection of water at this site. During the injection process, the following observations were recorded. Pass No.: 2nd No. of Probes: 4 Probe Length: 12 feet OBSERVATION SPECIFICATION Yes No NIA Surfactant added to each load. X Injection pressure 50 to 200 psi at manifold. X Injection downward in 18 inch intervals. X Total depth of injection was 10 feet. X Spacing of injection was 5 feet maximum. X Igjection to refusal at each location. X Comments: Technician: S. Campbell Report Distribution: (1) Transwcstcm Commcrcial Services (1) O'Brien & Associates, Inc. (1) TechniStmctures, Inc. (1) City of Coppell - Constr. lnsp. 99ss (1) City ofCoppell - Bldg. lnsp. (1) Hill & Wilkinson, Ltd. H~ Engineering, Inc. Eugene Harbour Principal This report is exclusively f~r the use of the client indicated above and shalt not be reproduced in full without written approval of HBC Enginee*