Loading...
Amberpoint BP-LR020129WATER INJECTION OBSERVATION Date of Service: Client No.: Client: 01/29/02 3181 Transwestern Commercial Services 5001 Spring Valley Rd., Suite 600 W Dallas, TX 75244 Report No.: Project No.: Project: 94021029.0024 94021029 Amberpoint Building No. 1 Amberpoint Bus. Pk ~ Coppell Coppell, Texas Location: Building Pad General Contractor: Hill & Wilkinson Injector: Jowell Procedure: On this date, a representative of HBC Engineering, Inc. observed the injection of water at this site. During the injection process, the following observations were recorded. Pass No.: 3rd No. of Probes: 4 Probe Length: 12 feet OBSERVATION SPECIFICATION Yes No N/A Surfactant added to each load. X Injection pressure 50 to 200 psi at manifold. X Injection downward in 18 inch intervals. X Total depth of injection was 10 feet. X Spacin8 of injection was 5 feet maximum. X Iniection to refusal at each location. X comments: On this date, four rigs were working this area. Technician: S. Campbell Report Distribution: ( 1 ) Transwestern Cormnercial Services (1) O'Brien & Associates. Inc. (1) TechniStmctures, Inc. (1) City of Coppoll - Constr. Insp. (1) City of Coppell - Bidg Insp. (1) ltill & Wilkinson, Ltd. IBC Engineering, Inc. Eu~our Principal 9911W This report is exclusively for the use of the client indicated above and shall not be reproduced in full without written approval of HBC Engineer