Loading...
ST9304-CS010215F~b,- 16-01 0cJ: 52A ~--. Zachry Construction Corporation I'O Box Z355 I'hnne: 972/245-80~3 CoppcB,'rx 75019 Fax: 972/24~-9024 TITLE: 24" B.F.V. and 6" B.O.V. ~) Bridge PROJECT: Dallas County B~ltlinc Road TO: Attn: Jolm L. Mom's Dallas County, Tex~ Room 623 Dallas County Records Buildin~ Dallas, TX Phone: 214/653-6a07 Fax: 214/653-6aa5 P.O2 CHANGE ORDER No. 00001 DATE: 02/15/2001 JOB: 5320 CONTRACT NO: 5320.01 RE: To: Front: NIImbcr: DESCRIPTION OF CHANGE This change is for the' Additicmal 24" BFV mid 6" BOV to bc installed un the new 24" Waterline as it is being relocated in thin Co[ltract. The valvcs will be installed per C,'ty of Coppell star~darrls. Item Description 00002 6" Dio~ OffValwc Stock# Quantity UnJls Unit Price Tax Rate Tax Amount Net Amouat Uu it Cost: $19,866.48 Unit Tax: $0,00 Lump Sum: $0.00 Lump Tax: $0.00 'l'otal: $19,866.48 The Original Contract Sum was ................................................................................................. Net ChanRe by Previously Authorized Requests and Changes ................................................ The {2ontrac! Sum Prior to This Change Order was ......... The Contrael Sum Will be Increased ................................................................................... 'l'l~e New Conlract Sum lncludi.g Thi~ Change Order ..... The Contract Time Will Not Be Changed ................................................................................. The Date of Substantial Completion as of this Cbaage Order Therefore is ... $6,668,347.92 $0.00 $6,668,347.92 $19,866.48 $6,688,214.40 ACCISPTEI): Dallas County, Texas By: John L. Mcars Date: