Loading...
YMCA-CS020211TRANSMITTAL Planning Department 255 Parkway Department Coppell, TX 75019 Attn: Gary Johnson Voice: 972.304.3678 Fax: 972.304.7092 CC: Project No. 01122 Date: 2.11.02 Re: Coppell YMCA Expansion Via: Big O File Date: Quantity: 2.11.02 (5) bonds Description: Revised Site Plan/Landscape plan Remarks: Please refer to the revised site for new retaining wall configuration. Refer to the revised civil plan sent on 2.4.02 for retaining wall heights. The contractor is pricing the new Steel gnardrail and I will forward those drawings and details once we have determined the final design based on cost. The landscape quantities have not changed from the approved Architectural site plan. Some of the Buffords have been moved to the top of the wall, which will help to buffer the guardrail. Scott Allan Wegener, PC p:\ 1999\99230~misc~new FAXtransmit~al-gary.doc