YMCA-CS020211TRANSMITTAL
Planning Department
255 Parkway Department
Coppell, TX 75019
Attn: Gary Johnson
Voice: 972.304.3678
Fax: 972.304.7092
CC:
Project No. 01122
Date: 2.11.02
Re: Coppell YMCA
Expansion
Via: Big O
File
Date: Quantity:
2.11.02 (5) bonds
Description:
Revised Site Plan/Landscape plan
Remarks:
Please refer to the revised site for new retaining wall configuration. Refer to the revised civil plan sent on
2.4.02 for retaining wall heights.
The contractor is pricing the new Steel gnardrail and I will forward those drawings and details once we have
determined the final design based on cost.
The landscape quantities have not changed from the approved Architectural site plan. Some of the Buffords
have been moved to the top of the wall, which will help to buffer the guardrail.
Scott Allan Wegener, PC
p:\ 1999\99230~misc~new FAXtransmit~al-gary.doc