St Joseph-CS020131TRANSMITTAL
AGUIRRE CORPORA TION
12700 PARK CENTRAL DR FLOOR 15
DALLAS TEXAS 75251
FAX 972 788 1583
PHONE 972 788 1508
THE CAN-DO SPIRIT THAT GETS THE JOB DONE®
)ATE/TIME: January 31,2002 PROJ NO:
TO: City of Coppell PROJ NAME:
::o,,,. Engineering Department
?,,~ ~ 255 Parkway
,~;i~, s~,~ zi~ Coppell TX 75019
DELIVERY VIA:
ATTN: Mr. Ken Griffin
RE: Retaining Wall and Force Main Issues
It enclosures are not as noted, kindly notify us at once.
1030009900/0300
St. Joseph Village
[] FedEx
[] Texpress Courier
[] US Mail
ARE SENDING YOU [] Attached
[] Under separate cover via
the following items:
[] Shop drawings
[] Copy of letter
[] Prints [] Plans [] Samples
[] Field Log [] Field Order [] Change Order
NO DESCRIPTION
[] Specifications
Other
50-Scale Plan and Elevabon of the Proposed Retaining
Sheets 7 through 10 of the TCB Plans for the proposed
30" force main with red-line mark-up of recommended
rev sed a gn_ment_
THESE ARE TRANSMITTED as checked below:
REMARKS
COPY TO
form # (Rev. 1/00)
[] For Council Approval
[] For your use
[] As requested
[] For review and comment
[] Reviewed
[] Furnish as corrected
[] Revise and Resubmit
[] Rejected
Ken, the attached prints present our recommended resolution for routing the
proposed 30" force main through St. Joseph. In general we have relocated our
water and storm sewer lines to place the force main 10' east of the west face of curb
along the west perimeter drive. We offer this for your consideration and comment.
Obviously, if we proceed with this route, the specific stations and exact elevations
would still need to be refined. Please review this at your earliest convenience, and
call me when you would like to discuss.
Mr. Joe Dingman, St. Joseph Village by US Mial.
HSAAI-PROJ\1030\0099-0~l~cuments\TRANSMTI013102.doc Page 1 of 1