Loading...
ST0001-CS020205 (2) 8196499645 .02/05~2002 11:39 8176497645 SCHRICKEL ROLLINS PAGE 01 Schrickel, Rollins and Associates, Inc. Consultants in Landscape Architecture · Engineering · Planning February 5, 2002 ,5"T oo - Ioseph E, Br,3dley, Terry T. Cheek, ASLA Terry E. Cu[lender Delbert W. Hirst, ASiA 5aniord P. LaHue, Jr., PE Gene Sc, hrickel. FASLA Mr. Philip Bennett Infrastructure Services Inc. P.O. Box 496448 Garland, Texas 75049 FAX 972-303-0872 Philip, The following comments are for information purposes only: · Please copy all faxes to both Suzan and SRA. · ISI needs to present, in writing, any comments, concerns or changes in the method of construction to both the City and SRA. If you should have any questions please do not hesitate to give me a call. Yours truly, SCHRICKEL, ROLLINS AND ASSOCIATES, INC. Chris Schnitger, P.E. CS/cs/4~2e CC: Suzan Taylor - City of Coppell H:',Job~4126~orresp\tetter~Bennetl.2.5.02 .doc Fax Note 7671 sm Z-'~, ,0'~- j~e~J~I~ J ' ' ~ ~1~ ~1~ 1161 Corporate Drive West · Suite 200 · Arlington, Texas 76006 * [817 64c)-3216/Metro 817) 6408212/FAX (B17) 649-7645 972 305 8872 F~b 05 O~ l~:~p InFrastructure Services 97~-303-0B?~ p. 1 52O2 Wyndham Court Garland, TX 75043 TO: City of Coppell ATTN: S-~n Taylor ~gOM: Philip Bennett gE: Creekview Drive & Freeport Parkway I~"T/JOB NO.: ~x: (972) 304-3570 PHONE: Reply to: ISI Phone: (972) ~10-806~ Fax: (972) 303-08~ RE]~A-RI(S: ~e Attached EIe~ui ~al Questions Letter T~Lr~I No. af Pages (lm:lmlh~ Cove~ Sheet) x Or, lad will be mailed 5 1~1~ Cem~pondence To Feb 05 OE 1E:2~p InFrastruoture Services S72-303-0872 February S, 2002 Schrickel, Rollin~ and Associates, Inc. 1161 Corporate Drive West, Ste 200 Arlington, Texas 76006 Atm.: Chris Schnitger, P.E. RE: Electrical Issues Dear Mr. Schnitger, As discussed at the jobsite, ISI needs answers in regards to the list of questions sent to Schrickel Rollins on January 18~ 2002. These unanswered questions are mere days away from irapeding progress. ISI is entering into the phase of construction where concrete is going to he poured. We need answers in regards to the attached electrical items, prior to that, to keep the project moving forward. Please ~espond no later than Friday, February 8, 2002 to help prevent delays to the project. I have re. attached the correspondence sent January ! g~, 2002. In addition, there is a conduit shown on the drawings that will he located just north of Ruby Road that is drawn to come from the medi~ of State Road to the corner lot of Ruby and State. This morning TXU stated that the noted conduit had been deleted. have not received any documentation to ~ affect. Please review and comment. Feb OS 0~ 1~:~3p In~pas~puc~upe Services ~?~-303-087~ p.3 Thank you for your help in regards to the above, and please do not hesitate to contact Infrastructure Services, Inc. at (972) 240-g064 if further information should be required. Sincerely, Phih'p Bennett File: Corr. To (14510007) Cc: Sn~n Taylor (City of~l) Robin Bullor (Bullet Eleclrlc) lnfraslxucture ~Services, Inc. 5202 Wyndham Court TO:Schrickel, Ro~ins&A~oc. ATTN: Chris Schnit~er, P.E. ~OM: Philip Bennett DA'II~: Ja~,,~, 18, 200'2 I~ST/JoB NO.: PHONE: RE: Creekview Drive & Freeport Parkway Reply io: ISI Phone: (972) 2A0-8064 Fax: (972) ~-0872 RIiMAR~: See attached c~ts / concerns from Buffer Electric. Please correspond with any information you might have in regards to the attached. Thank you! Philip No. of Pa~s (Including Cover She~) Orishul will b~ m~led x Origia~l will not be m~lled 2 FiI~ C~em:~ To (l~'luo~; Felm 05 02 12:23p Infrastructure Services ~'~,,t,~ 17.,/~o~