ST0001-CS020212 (2)To:
Dm:
Subject:
"Schnitger, Chris" <c~hnitger~sradesign.com>
"Suzan Taylor (staylor~ici.coppell.tx. us)" <staylorC~ci.coppell.tx.us>
2/12J02 3:28PM
Creekview
I just finished looking at all the submittals I've receNed over the past
few days from both Larry and ISl. Here is brief summary:
* Street paving spec has been approved.
* I'm still looking into the concrete spec for the drainage
structures. The strength looks a Ilttie Iow but I will confirm this still.
They are supposed to start pouring today at 2:00 pm. I don~ think it is
that big of a concern. I'm sum Larry would have stopped them if he was
* The traffic control plan looks OK. I agree with Larry's comment
regarding the center line striping. ISI needs to make sure that they abide
by the Texas MUTCD for Traffic Control.
* The shop drawings for the mil fence along the gabions has been
approved.
I will bdng the approved shop drawings to our meeting on Thursday. I also
received some information from ISI regarding Change Order f/2. I will tr~
and get that wrapped up ASAP.'
Chris
Chris Schnitger, P.E.
Schrickel, Rollins & Assoc.
1161 Corp~-&~e Dr. W.; Ste.
Arlington, Texas 76006
(817) 649-3216
(817 649.7645 ~: