Loading...
ST9301-PR020207Box 1520727, Dallas, 'l'oxa$ 75382-0727 F~hono: (2'14) 3t58-0478 Fax: (214) $~1.6752 I-Mail: arocfl~s@ aol.¢om February 7, 2002 Suzan C. Taylor CIP Coordinator City of Coppell PO Box 478 Coppell, TX 75019 Dear Ms. Taylor: Two weeks ago, we presented information about the Sandy Lake Road Project to Mark Denton of the Texas Historical Commission. This information consisted of historic maps along with enlargements of photographs which illustrated the present conditions of Sandy Lake Road between MacArthur and the Elm Fork. After reviewing this information, he concurred that backhoe testing only needed to be done in the vicinity of site 41DL12 where it is close to the road and that additional testing is unwarranted due to past disturbances and the plans for raising the existing roadway. With this understanding, AR Consultants proposes to conduct the required archaeological investigations along Sandy Lake Road using a backhoe and operator provided by the City of Coppell. We anticipate that fieldwork will not take more than two days, and may be done in a shorter period of time. This work would be done under the authority of an Antiquities Permit obtained from the Texas Historical Commission and I would be serving as the Principal Investigator. We expect to have Dr. C. Reid Ferring of the University of North Texas assist us with the evaluation of the sediments uncovered in the trenches that are dug. This can be completed for a lump sum of $ 6,000.00. Thank you for considering AR Consultants. We look forward to working with you on this project. S. Alan Skinner, PhD President p-arc Sa~dyLak¢Copp¢ll MIlS'F{ )l~l{-' ][5 {rlILI)IN {~S AiR(. HA:[~,( ~1[.,{ )O,Y NA .:[ 1L RAL SCIENCES