Loading...
PA9702-LR 991116CONCRETE COMPRCIVE STRENGTH TES 8901 Carpenter Fnvy., Suite #100 Dallas, Texas 75247 Date of Service: 09/16/1999 Report No.: 9925128 Report Date 11/16/1999 Client No.: COPPELL Project No.: 94991118 Client: City of Coppell Project: Coppell Aquatic/Recreation Ctr Attn: Brad Reid 300 Block of Parkway BIrd 732 DeForest Coppell TX 75019 Coppell, Texas/Prj. #96051 Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressire strength samples. PROJECT DATA CONTRACTOR: Hisaw & Assoc. CONCRETE CLASS: N/A CONCRETE SUPPLIER: Nelson Brothers PLACEMENT DATE: 09/16/1999 BATCH TIME: PLANT: Lewisville Tnvn~ SAMPLED: 10:45AM BY: Dean Martin SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Cloudy STRENGTH: 4000 psi @ 28 Days TEMPERATURE (F). AIR 78 F CONCRETE: 86 F SLUMP: 6.0" MAX TRUCK NO: 217 TICKET NO: 77680 AIR: N/A AIRCONTENT(%): N/A UNIT WEIGHT (pcf): N/A TEST METHOD: ASTM C- 143 PLACEMENT LOCATION: Piers dated 9-16 ASTM C- 172 ASTM C-31 SAMPLE LOCATION: G-4, F-3 REPORT OF TESTS ACCUMULATIVE YARDS: 50 CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (Ibs. force) (psi) TYPE 1 1 5.75 09/23/1999 7 87260 3090 1 2 5.75 09/23/1999 7 87910 3110 Average 3100 1 3 5.75 10/14/1999 28 114140 4040 1 4 5.75 10/14/1999 28 111660 3950 Average 4000 1 5 5.75 11/11/1999 56 119950 4240 Technician Time: See Report ~9925127 Technician: Dean Martin Started: Finished: Report Distribution: (1) City of Coppell (1) City ofCoppell - Eaginee~ng (1) Bfinkley Sargent Architects (1) City of Coppell - Bldg. Insp. (1) Turner Engineers (1) City ofCoppell - Leisure Serv Dept Vice President (1) Hisaw & Associates This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, hic. 01TM Page 1 of 1