Loading...
Amberpoint BP-LR020205WATER INJECTION OBSERVATION Date of Service: Client No.: Client: Location: O2/05/O2 3181 Transwestern Commercial Services 5001 Spring Valley Rd., Suite 600W Dallas, Texas 75244 Report No.: Project No.: Project: Building Pad #2 General Contractor: Injector: 94021029.0037 94021029 Amberpoint Building No. 1 Amberpoint Bus. Pk @ Coppell Coppell, Texas Hill & Wilkinson Jowell Procedure: On this date, a representative of ItBC Engineering, Inc. observed the injection of water at this site. During the injection process, the following observations were recorded. Pass No.: 4th No. of Probes: 4 Probe Length: 12 feet OBSERVATION SPECIFICATION Yes No N/A Surfactant added to each load. X Injection pressure 50 to 200 psi at manifold. X Injection downward in 18 inch intervals. X Total depth of injection was 10 feet. X Spacing of injection was 5 feet maximum. X In, iection to refusal at each location. X Comments: Technician: S. Campbell Report Distribution: ( 1 ) Transwestern Commercial Services (1) O'Brien & Associates, Inc. ( 1 ) TechniStructures, Inc. (1) City of Coppell - Constr. Insp. (1) City of Coppell - Bldg. Insp. (1) Hal & Willdnson, Ltd. ( 1 ) Halff Associates (1) State Farm Insurance I--I]C Engineering, Inc. Eugene Harbour Principal 9911w This report is exclusively for the use of the client indicated above and shall not be reproduced in full without written approval of HBC Engineer WATER INJECTION OBSERVATION Date of Service: Client No.: Client: O2/05/02 3181 Transwestem Commercial Services 5001 Spring Valley Rd., Suite 600W Dallas, Texas 75244 Report No.: Project No.: Project: 94021029.0036 94021029 Amberpoint Building No. 1 Amberpoint Bus. Pk ~ Coppell Coppell, Texas Location: Building Pad, lines L to Q and 9.2to 11 General Contractor: Hill & Wilkinson Injector: .lowell Procedure: On this date, a representative of HBC Engineering, Inc. observed the injection of water at this site. During the injection process, the following observations were recorded. Pass No.: 3rd No. of Probes: 4 Probe Length: 10 feet OBSERVATION SPECIFICATION Yes No N/A Surfactant added to each load. X Injection pressure 50 to 200 psi at manifold. X Injection downward in 18 inch intervals. X Total depth of injection was 10 feet. X Spacing of injection was 5 feet maximum. X Injection to refusal at each location. X Commen~: Technician: S. Long Re~o~t Distribution: (1) Transwestern Commercial Services (1) O'Brien & Associates, Inc. ( ! ) TeelmiStructures, Inc. ( 1 ) City of Copl~ll - Constr. Imp. (1) City of Copp¢ll - Bldg. Insp. (I) Hill & Wilkinson, Ltd. (1) Haiti' gssociat~ (1) State Farm Insurance I-~ Engineering, Inc. Eugene Harbour Principal This report is exclus~vety for the use of the client imlicated above and shall not be reproduced in full without written approval of HBC Engineer _. .. j . t -®