Amberpoint BP-LR020204WATER INJECTION OBSERVATION
Date of Service:
Client No.:
Client:
02/04/02
3181
Transwestern Commercial Services
5001 Spring Valley Rd., Suite 600W
Dallas, Texas 75244
Report No.:
Project No.:
Project:
94021029.0035
94021029
Ambe~point Building No. 1
Amberpoint Bus. Pk @ Coppell
Coppell, Texas
Location:
Building Pad, lines 0.5 to Q and General Contractor: Hill & Wilkinson
5.5 to 11 injector: Jowell
Procedure:
On this date, a representative of HBC Engineering, Inc. observed the injection of water at this
site. During the injection process, the following observations were recorded.
Pass No.: 2nd No. of Probes: 4 Probe Length: 10 feet
OBSERVATION
SPECIFICATION Yes No N/A
Surfactant added to each load. X
Injection pressure 50 to 200 psi at manifold. X
Injection downward in 18 inch intervals. X
Total depth of injection was 10 feet. X
Spacing of injection was 5 feet maximum. X
In, iection to refusal at each location. X
Comments:
Technician: S. Long
Report Distribution:
(1) Transwestem Commercial Services
(1) O'Bfien & Associates, Inc.
(1) TcchniStmctures. Inc.
(1) City of Coppcll - Constr. Insp.
(1) City of Coppcll - Bldg. Insp.
(1) Hill & Wilkinson, Ltd.
( 1 ) Halff Associates
(1) State Farm Insurance
Engineering, Inc.
Eugene Harbour
Principal
99SS This report is exclusively for the use of the client indicated above and shall not be reproduced in full without written approval of HBC Engineer
??
??
??
i i
-4--
I_1_ I_
WATER INJECTION OBSERVATION
Date of Service:
Client No.:
Client:
02/04/02
3181
Transwestem Commercial Services
5001 Spring Valley Rd., Suite 600W
Dallas, Texas 75244
Report No.:
Project No.:
Project:
94021029.0034
94021029
Amberpoint Building No. 1
Amberpoint Bus. Pk @ Coppell
Coppell, Texas
Location:
Building Pad
General Contractor: Hill & Wilkinson
Injector: Jowell
Procedure:
On this date, a representative of I-IBC Engineering, Inc. observed the injection of water at this
site. During the injection process, the following observations were recorded.
Pass No.: 3rd No. of Probes: 4 Probe Length: 12 feet
OBSERVATION
SPECIFICATION Yes No N/A
Suffactant added to each load. X
Injection pressure 50 to 200 psi at manifold. X
Injection downward in 18 inch intervals. X
Total depth of injection was 10 feet. X
Spacing of injection was 5 feet maximum. X
Injection to refusal at each location. X
Comments:
Technician: S. Campbell
Report Distribution:
(1) Transwe.stem Commercial Services
(1) O'Brien & Associates,
(1) TeclmiStxuetures, Inc,
(1) City of Coppell - Constx. lnsp.
(1) City of Coppell - Bldg. [nsp.
(1) Hill & Wilkinson, Ltd.
(1) Halff Associates
(1) State Farm Insurance
Engineering, Inc.
Eugene Harbour
Principal
99SS This report is exclusively for the use of the client indicated above and shall not be reproduced in full without written approval of HBC Engineer