Amberpoint BP-LR020131 (2)WATER INJECTION OBSERVATION
Date of Service:
Client No.:
Client:
01/31/02
3181
Transwestern Commercial Services
5001 Spring Valley Rd., Suite 600W
Dallas, Texas 75244
Report No.:
Project No.:
Project:
94021029.0029
94021029
Amberpoint Building No. 1
Amberpoint Bus. Pk @ Coppell
Coppell, Texas
Location:
Building Pad, lines 5.5 to 11 and General Contractor: Hill & Wilkinson
H to G Injector: Jowell
Procedure:
On this date, a ~epresentative of HBC Engineering, Inc. observed the injection of water at this
site. During the injection process, the following observations were recorded.
Pass No.: 2nd No. of Probes: 4 Probe Length: 10 feet
OBSERVATION
SPECIFICATION Yes No N/A
Suffactant added to each load. X
Injection pressure 50 to 200 psi at manifold. X
Injection downward in 18 inch intervals. X
Total depth of injection was 10 feet. X
Spacing of injection was 5 feet maximum. X
Iniection to refusal at each location. X
Comments:
Technician: S. Long
Report Distribution:
( 1 ) Transwestem Commercial Services
(1) O'Bden & Associates, Inc.
(1) TechniS~uctures, Inc.
(1) City of Coppell - Constr. lnsp.
( 1 ) City of Coppell - Bldg. Insp.
(1) Hill & Wilkinson, Ltd.
( 1 ) Halff Associates
(1) SUtte Farm lasurance
~ Engineering, Inc.
Eugene Harbour
Principal
99ss This repoff is exclusively for the use of the client indicated above and shell not be reproduced in full without written approval of HBC Engineer
-@
-®
WATER INJECTION OBSERVATION
Date of Service:
Client No.:
Client:
Location:
01/31/02
3181
Transwestem Commercial Services
5001 Spring Valley Rd. Suite 600 W
Dallas, TX 75244
Report No.:
Project No.:
Project:
Building Pad
General Contractor:
Injector:
94021029.0028
94021029
Amberpoint Building No. 1
Amberpoint Bus. Pk. ~ Coppell
Coppell, Texas
Hill & Wilkinson
Jowell
Procedure:
On this date, a representative of HBC Engineering, Inc. observed the injection of water at this
site. During the injection process, the following observations were recorded.
Pass No.: 4th No. of Probes: 4 Probe Length: 12 feet
OBSERVATION
SPECIFICATION Yes No NIA
Surfactant added to each load. X
Injection pressure 50 to 200 psi at manifold. X
Injection downward in 18 inch intervals. X
Total depth of injection was I0 feet. X
Spacing of injection was 5 feet maximum. X
Iqiecfion to refusal at each location. X
Commen~:
Technician: S. Campbell
Repmt Distribution:
(1) Transwestem Commercial Services
(1) O'Bri~n & A~sociatcs, Inc.
(1) Tcchnistructurcs, Inc.
(t) City of Coppell - Constr. [asp.
(I) City of Coppell - Bldg. lnsp.
(l) Hill & Wilkinson, Ltd.
(1) HalffAssociatos
(1) State Farm Insurance
Engineering, Inc.
Eugene Harbour
Principal