Loading...
Amberpoint BP-LR020130 (2)Date of Service: Client No.: Client: Location: Procedure: 01/30/02 3181 Transwestem Conunercial Services 5001 Spring Valley Rd, Suite 600 W Dallas, TX 75244 Report No.: 94021029.0027 Project No.: mbc oint Buildin C, ~r Amberpoint Bus. Pk ~ Cool, Il ~.__ Connell Te Building Pad General Contractor: Hill & Wilkinson Injector: Jowell On this date, a representative of HBC Engineering, Inc. observed the injection of water at this site. During the injection process, the following observations were recorded. Pass No.: 3rd No. of Probes: 4 Probe Length: 12 feet OBSERVATION SPECIFICATION Yes No NIA Surf_a. et-nt added to each load. X Injection pressure 50 to 200 psi at manifold. X Injection downward in 18 inch intervals. X Total depth of injection was 10 feet. X Spacing of injection was 5 feet maximum X I~jeetion to refusal at each location. X Comments: Technician: S. Campbell Report Distribution: (1) Tramwcstcm Commemial Services (I) O~Bricn & Associates, [nc. (1) TechniStmctures, [nc. (I) City of Coppell - Constr. lnsp. (1) City of Coppell - Bldg. lnsp. (1) Hilt & Wilkinson, Ltd. (I) Halff Associates (1) State Farm Insurance ~ Engineering, Inc. Eugene Harbour Principal 4 -® -® WATER INJECTION OBSERVATION Date of Service: Client No.: Client: Location: 01/30/02 3181 Transwestern Commercial Services 5001 Spring Valley Rd., Suite 600W Dallas, Texas 75244 Report No.: Project No.: Project: Building Pad, lines 5.5 to 11 and General Contractor: J to H , Injector: 94021029.0026 94021029 Amberpoint Building No. 1 Amberpoint Bus. Pk @ Coppell Coppell, Texas Hill & Wilkinson Jowell Procedure: On this date, a representative of I-IBC Engineering, Inc. observed the injection of water at this site. During the injection process, the following observations were recorded. Pass No.: 2nd No. of Probes: 4 Probe Length: 10 feet OBSERVATION SPECIFICATION Yes No N/A Suffactant added to each load. X Injection pressure 50 to 200 psi at manifold. X Injection downward in 18 inch intervals. X Total depth of injection was 10 feet. X Spacing of injection was 5 feet maximum. X IRjection to refusal at each location. X Comments: Technician: S. Long Report Distribution: (l) Transwestern Cormmercial Services (1) O'Bfien & Associates, Inc. ( I ) TeclmiSteuctures, Inc. (1) City of Coppell - Constr. Insp. 99ss (1) City of Coppell - Bldg. [asp. (1) Hill & Wilkinson, Ltd. ( 1 ) Halff Associates (l) State Farm Insurance HI~ Engineering, Inc. Eugene Harbour Principal This report is exclusively for the use of the client indicated above and shall not be mprnduc~d in full without written approval of HBC Engineer