Amberpoint BP-LR020130 (2)Date of Service:
Client No.:
Client:
Location:
Procedure:
01/30/02
3181
Transwestem Conunercial Services
5001 Spring Valley Rd, Suite 600 W
Dallas, TX 75244
Report No.: 94021029.0027
Project No.:
mbc oint Buildin C,
~r Amberpoint Bus. Pk ~ Cool, Il
~.__ Connell Te
Building Pad
General Contractor: Hill & Wilkinson
Injector: Jowell
On this date, a representative of HBC Engineering, Inc. observed the injection of water at this
site. During the injection process, the following observations were recorded.
Pass No.: 3rd No. of Probes: 4 Probe Length: 12 feet
OBSERVATION
SPECIFICATION Yes No NIA
Surf_a. et-nt added to each load. X
Injection pressure 50 to 200 psi at manifold. X
Injection downward in 18 inch intervals. X
Total depth of injection was 10 feet. X
Spacing of injection was 5 feet maximum X
I~jeetion to refusal at each location. X
Comments:
Technician: S. Campbell
Report Distribution:
(1) Tramwcstcm Commemial Services
(I) O~Bricn & Associates, [nc.
(1) TechniStmctures, [nc.
(I) City of Coppell - Constr. lnsp.
(1) City of Coppell - Bldg. lnsp.
(1) Hilt & Wilkinson, Ltd.
(I) Halff Associates
(1) State Farm Insurance
~ Engineering, Inc.
Eugene Harbour
Principal
4
-®
-®
WATER INJECTION OBSERVATION
Date of Service:
Client No.:
Client:
Location:
01/30/02
3181
Transwestern Commercial Services
5001 Spring Valley Rd., Suite 600W
Dallas, Texas 75244
Report No.:
Project No.:
Project:
Building Pad, lines 5.5 to 11 and General Contractor:
J to H , Injector:
94021029.0026
94021029
Amberpoint Building No. 1
Amberpoint Bus. Pk @ Coppell
Coppell, Texas
Hill & Wilkinson
Jowell
Procedure:
On this date, a representative of I-IBC Engineering, Inc. observed the injection of water at this
site. During the injection process, the following observations were recorded.
Pass No.: 2nd No. of Probes: 4 Probe Length: 10 feet
OBSERVATION
SPECIFICATION Yes No N/A
Suffactant added to each load. X
Injection pressure 50 to 200 psi at manifold. X
Injection downward in 18 inch intervals. X
Total depth of injection was 10 feet. X
Spacing of injection was 5 feet maximum. X
IRjection to refusal at each location. X
Comments:
Technician: S. Long
Report Distribution:
(l) Transwestern Cormmercial Services
(1) O'Bfien & Associates, Inc.
( I ) TeclmiSteuctures, Inc.
(1) City of Coppell - Constr. Insp.
99ss
(1) City of Coppell - Bldg. [asp.
(1) Hill & Wilkinson, Ltd.
( 1 ) Halff Associates
(l) State Farm Insurance
HI~ Engineering, Inc.
Eugene Harbour
Principal
This report is exclusively for the use of the client indicated above and shall not be mprnduc~d in full without written approval of HBC Engineer