ST0001-CS020214 (2)From: To: Date: Subject: Gary Sims Suzan Taylor 2/14/02 10:15AM Re: Creekview Drive & Freeport Parkway Ms. Taylor, I received the following response from my athletics supervisor regarding usage of Wagon Wheel Park. I think we can work around most of these issues, the use of the fields will be pdmadly in the evenings and weekends. Soccer is currently playing out at Wagon Wheel Park. They are utilizing two fields. Traffic should not be a problem with just two fields in use for throe days a week. Baseball will be utilizing Wagon Wheel Park February 16 & 23 both Saturdays. The combined traffic of Soccer and Baseball may cause problems. Baseball does have two tournaments out at Wagon Wheel during this time as well. They are March 1-3 and March 8-10. Traffic could be a problem at that time too. The only other possible conflict that I can see are deliveries to concession stands. Lloyd Mauch, Supv. Recreation Svs. Suzan Taylor 02/13/02 02:15PM >>> ISI is currently constructing a temporary roadway along the north edge of the existing Ruby Road to allow for the detour of traffic at the intersection of Ruby Road and State Road/Freeport Parkway. The phasing of the traffic will cause changes in the direction of traffic and delays. It is our expectation that ISI will have completed the necessary amount of paving required to allow unrestricted access to Wagon Wheel Park, on or before March 15, 2002. Engineering respectfully requests that we be notified of any scheduling activities at WWP that may cause hardship for the general public or impact the maintenance responsibilites in WWP. Thanks Gary D. Sims, Director City of Coppell Parks and Leisure Services Dept. P.O. Box 478 Coppell, TX 75019 (972) 304-7001 e-mail: gsims~;~ci.coppeli.tx.us From: To: Date: Subject: Brad Reid Suzan Taylor 2/13/02 5:03PM Re: Creekview Drive & Freeport Parkway Suzan, There are currently soccer games occurring on two of the fields each Tuesday evening, Thursday evening and Saturday. Also, there are a couple of baseball toumaments scheduled the first two weekends in Mamh. I will keep you informed of anything additional that adses. Thanks >>> Suzan Taylor 02/13/02 02:15PM >>> ISI is currently constructing a temporary roadway along the north edge of the existing Ruby Road to allow for the detour of traffic at the intersection of Ruby Road and State Road/Freeport Parkway. The phasing of the traffic will cause changes in the direction of traffic and delays. It is our expectation that ISI will have completed the necessary amount of paving required to allow unrestricted access to Wagon VVheel Park, on or before March 15, 2002. Engineering respectfully requests that we be notified of any scheduling activities at VWVP that may cause hardship for the general public or impact the maintenance responsibilities in WWP. Thanks I~rom: Brad Reid To: Suzan Taylor Date: 2/13/02 4:49PM Subject: Re: Wagon Wheel Park Phase III Susan: I met with SRA last week to look at possible locations of the sidewalk. They are prepodng an exhibit for us to review showing the possible routing of the walk. I will get with you prior to responding to them. >>> Suzan Taylor 02/13/02 01:05PM >>> Brad: What is the status of the proposed sidewalk along WWPICreekview Drive? I know that you were supposed to meet with SPA staff to determine the ultimate location. Thanks