YMCA-LR020202GEOTECHNICAL AND ~ A r-1 L_.I P
ENVIRONMENTAL CONSULTANTS
REPORT OF REINFORCING
STEEL PLACEMENT OBSERVATION
Coppell YMCA
146 Town Center Boulevard
Coppell, Texas
REPORTED TO: YMCA of Metropolitan Dallas
601 Akard Street
Dallas, Texas 75201
ATTN: Mr. Todd Baker
CONTRACTOR: Hill & Wilkinson
REPORT NO. 33
REPORT DATE: 02-2-02
REG PROJECT NO. 8524
DATE OBSERVED: 01-29-02
TECHNICIAN'
PAGE: 1 of 1
Items Observed:
Grade beam: Lines F to G from 2 to 2.9.
I Reference Plans or Notes Used: I Sheet S.102
I x ]There were no deviations noted.
The reinforcing steel placed at the above referenced locations was observed with
respect to the referenced portions of the contract documents.
Mail
Distribution: (1) YMCA of Metropolitan Dallas/
Mr. Todd Baker
(1) YMCA of Metropolitan Dallas/
Mr. Curt Hazelbaker
(1) City of Coppell/Mr. Kenneth Griffen
(1) Good Fulton & Farre[I/
Mr. Scott Wegener
(1) Hill & Wiikinson/Mr. Lanny Huggins
(1) Dowdey Anderson & Associates/
Mr. Bill Anderson
Submitted by:
REED ENGINEERING GROUP.
Original Signed By
James F. Phipps, P.E.
BW/mm
INC.
2424 STUTZ DR. * SUITE 400 · DALLAS, TX 75235 · TEL [214] 350 5600 · FAX [214] 350 0019