YMCA-LR020117GEOTECHNICAL AND ~ ~ I'--1 I I p
ENVIRONMENTAL CONSULTANTS
REPORT OF PIER OBSERVATION
Coppell YMCA
146 Town Center Boulevard
Coppell, Texas
REPORTED TO: YMCA of Metropolitan Dallas
601 Akard Street
Dallas, Texas 75201
ATTN: Mr. Todd Baker
REPORT NO. 12
REPORT DATE: 01-17-02
REG PROJECT NO. 8524
TECHNICIAN: R. Bullion
PAGE: 1 of 1
CONTRACTOR: Hill & Wilkinson
Date
1-03-02
Shaft Required
Size Penetration
Pier No. (inches) (feet)
A-1.5 18 18.0
A-1 18 14.0
B-1 18 17.0
C-1 18 17.0
D.3-1 18 12.0
Depth to
Stratum
(feet)
15.4
16.7
20.3
26.3
24.5
Total Depth Actual Concrete
of Pier Penetration Length
J (feet) J (feet) , (feet)
33.7 18.3 33.2
30.7 14.0 29.7
39.5 19.2 37.5
43.3 17.0 41.3
36.5 12.0 34.5
Note: All piers required use of temporary casing.
Mail
Distribution: (1)
YMCA of Metropolitan Dallas/
Mr. Todd Baker
(1) YMCA of Metropolitan Dallas/
Mr. Curt Hazelbaker
(1) City of Coppell/Mr. Kenneth Griffen
(1) Good Fulton & Farrell/
Mr. Scott Wegener
(1) Hill & Wilkinson/Mr. Lanny Huggins
(1) Dowdey Anderson & Associates/
Mr. Bill Anderson
Submitted by:
REED ENGINEERING GROUP
Original Signed By
James F. Phipps, P.E.
BW/mm
INC.
2424 STUTZ DR. · SUITE 400 · DALLAS, TX75235 · TeL [214] 350 5600 · ~^X [214] 350 0019
REPORT OF PIER OBSERVATION
Coppell YMCA
146 Town Center Boulevard
Coppell, Texas
REPORTED TO: YMCA of Metropolitan Dallas
601 Akard Street
Dallas, Texas 75201
ATTN: Mr. Todd Baker
REPORT NO. 15
REPORT DATE: 01-17-02
REG PROJECT NO. 8524
TECHNICIAN: R. Bullion
PAGE: 1 of 1
CONTRACTOR: Hill & Wilkinson
Shaft Required Depth to Total Depth Actual Concrete
Size Penetration Stratum of Pier Penetration Length
Date Pier No. (inches) (feet) (feet) (feet) (feet) (feet)
01-04-02 G-1.8 18 7.0 25.0 32.0 7,0 31.0
F-2 18 15.0 24.5 40.0 15.5 37.5
G-2 18 15.0 23.0 39.0 16.0 36.5
Note: All piers required use of temporary casing.
Mail
Distribution: (1)
(1)
(1)
(1)
(1)
(1)
YMCA of Metropolitan Dallas/
Mr. Todd Baker
YMCA of Metropolitan Dallas/
Mr. Curt Hazelbaker
City of Coppell/Mr. Kenneth Griffen
Good Fulton & Farrell/
Mr. Scott Wegener
Hill & Wilkinson/Mr. Lanny Huggins
Dowdey Anderson & Associates/
Mr. Bill Anderson
Submitted by:
REED ENGINEERING GROUP, INC.
Original Signed By
James F. Phipps, P.E.
BW/cg