Loading...
YMCA-LR020117GEOTECHNICAL AND ~ ~ I'--1 I I p ENVIRONMENTAL CONSULTANTS REPORT OF PIER OBSERVATION Coppell YMCA 146 Town Center Boulevard Coppell, Texas REPORTED TO: YMCA of Metropolitan Dallas 601 Akard Street Dallas, Texas 75201 ATTN: Mr. Todd Baker REPORT NO. 12 REPORT DATE: 01-17-02 REG PROJECT NO. 8524 TECHNICIAN: R. Bullion PAGE: 1 of 1 CONTRACTOR: Hill & Wilkinson Date 1-03-02 Shaft Required Size Penetration Pier No. (inches) (feet) A-1.5 18 18.0 A-1 18 14.0 B-1 18 17.0 C-1 18 17.0 D.3-1 18 12.0 Depth to Stratum (feet) 15.4 16.7 20.3 26.3 24.5 Total Depth Actual Concrete of Pier Penetration Length J (feet) J (feet) , (feet) 33.7 18.3 33.2 30.7 14.0 29.7 39.5 19.2 37.5 43.3 17.0 41.3 36.5 12.0 34.5 Note: All piers required use of temporary casing. Mail Distribution: (1) YMCA of Metropolitan Dallas/ Mr. Todd Baker (1) YMCA of Metropolitan Dallas/ Mr. Curt Hazelbaker (1) City of Coppell/Mr. Kenneth Griffen (1) Good Fulton & Farrell/ Mr. Scott Wegener (1) Hill & Wilkinson/Mr. Lanny Huggins (1) Dowdey Anderson & Associates/ Mr. Bill Anderson Submitted by: REED ENGINEERING GROUP Original Signed By James F. Phipps, P.E. BW/mm INC. 2424 STUTZ DR. · SUITE 400 · DALLAS, TX75235 · TeL [214] 350 5600 · ~^X [214] 350 0019 REPORT OF PIER OBSERVATION Coppell YMCA 146 Town Center Boulevard Coppell, Texas REPORTED TO: YMCA of Metropolitan Dallas 601 Akard Street Dallas, Texas 75201 ATTN: Mr. Todd Baker REPORT NO. 15 REPORT DATE: 01-17-02 REG PROJECT NO. 8524 TECHNICIAN: R. Bullion PAGE: 1 of 1 CONTRACTOR: Hill & Wilkinson Shaft Required Depth to Total Depth Actual Concrete Size Penetration Stratum of Pier Penetration Length Date Pier No. (inches) (feet) (feet) (feet) (feet) (feet) 01-04-02 G-1.8 18 7.0 25.0 32.0 7,0 31.0 F-2 18 15.0 24.5 40.0 15.5 37.5 G-2 18 15.0 23.0 39.0 16.0 36.5 Note: All piers required use of temporary casing. Mail Distribution: (1) (1) (1) (1) (1) (1) YMCA of Metropolitan Dallas/ Mr. Todd Baker YMCA of Metropolitan Dallas/ Mr. Curt Hazelbaker City of Coppell/Mr. Kenneth Griffen Good Fulton & Farrell/ Mr. Scott Wegener Hill & Wilkinson/Mr. Lanny Huggins Dowdey Anderson & Associates/ Mr. Bill Anderson Submitted by: REED ENGINEERING GROUP, INC. Original Signed By James F. Phipps, P.E. BW/cg 2424 STUTZ DR. * SUITE 400 · DALLAS, TX 75235 · TEL [214] 350 5600 · FAX [214] 350 0019