Loading...
YMCA-LR020111GEOTECHNICALAND ~ F:=I r-1 I I [~a ENVIRONMENTAL CONSULTANTS CONCRETE CYLINDER TEST REPORT Coppell YMCA 146 Town Center Boulevard Coppell, Texas REPORTED TO: YMCA of Metropolitan Dallas 601 Akard Street Dallas, Texas 75201 ATTN: Mr. Todd Baker CONTRACTOR: Hill & Wilkinson REPORT NO. 29 REG PROJECT NO. 8524 SAMPLE DATE: 01-14-02 TECHNICIAN: G. Green Location of Sample Set Number J Location I Quantity Represented 1 Screen Wall Piers: 1 through 21. 10/10 Design Information SourceMcR°f Concrete I Mix IdentificatiOns_sack I Specified 3000Strength p.s.i. Test Results Set Cylinder Age @ Total Load Compressive No. ID Date Tested Test lbs. Strength p.s.i. 1 6526 0'~-21-02 7 90410 3200 6526 02-11-02 28 6526 02-11-02 28 6526 Hold H Average Strength p.s.i. Cylinder Data Set I Cylinder Time of Concrete Air Ticket l No. ID Slump Sample Air Temp. Temp. Entrainment Number I 6526 6.00 2:00PM 61 56 NA 52655 Mail Distribution: (1) YMCA of Metropolitan Dallas/ Mr. Todd Baker (1) YMCA of Metropolitan Dallas/ Mr. Curt Hazelbaker (1) City of Coppell/Mr. Kenneth Griffen (1) Good Fulton & Farrell/ Mr. Scott Wegener (1) Hill & Wilkinson/Mr. Lanny Huggins (1) Dowdey Anderson & Associates/ Mr. Bill Anderson Submitted by: REED ENGINEERING GROUP, INC. Original Signed By Keith Atkins KEA/rt 2424 STUTZ DR. · SUITE400 · DALLAS, TX 75235 * TEL [214] 350 5600 · ~,X [214] 35000[9 GEOTECHNICALAND G F~ D I I ~ ENVIRONMENTAL CONSULTANTS CONCRETE CYLINDER TEST REPORT Coppell YMCA 146 Town Center Boulevard Coppell, Texas REPORTED TO: YMCA of Metropolitan Dallas 601 Akard Street Dallas, Texas 75201 ATTN: Mr. Todd Baker CONTRACTOR: Hill & Wilkinson REPORT NO. 27 REG PROJECT NO. 8524 SAMPLE DATE: 01-11-02 TECHNICIAN: J. Baradziej Location of Sample Set Number1 I GradeL°Cati°nbeam C-2 I QuantitY10/20 Represented Design Information lS°urce °f C°ncreteLattimore I Mix Identification 38 I Specified Strength p.s.i. 3000 Test Results Set Cylinder No. ID Date Tested Age @ Total Load Compressive Average Test lbs. Strength p.s.i. Strength p.s.i. 1 6363 01-18-02 7 65720 2330 6363 02-08-02 28 6363 02-08-02 28 6363 Hold H Cylinder Data Set I Cylinder Time of Concrete No. ID Slump Sample Air Temp. Temp. I 6363 4.5 9:10AM 54 Air Ticket Entrainment Number 58 N/A 7112467 Mail Distribution: (1) (1) (1) YMCA of Metropolitan Dallas/ Mr. Todd Baker YMCA of Metropolitan Dallas/ Mr. Curt Hazelbaker City of Coppell/Mr. Kenneth Griffen (1) Good Fulton & Farrell/ Mr. Scott Wegener (1) Hill & Wilkinson/Mr. Lanny Huggins (1) Dowdey Anderson & Associates/ Mr. Bill Anderson Submitted by: REED ENGINEERING GROUP, INC. Original Signed By Keith Atkins KEA/mm 2424 STUTZ DR · SUITE 400 · DALLAS, TX 75235 · TEL [214] 350 5600 · FAX [214] 350 0019