Loading...
YMCA-LR020109CONCRETE CYLINDER TEST REPORT Coppell YMCA 146 Town Center Boulevard Coppell, Texas REPORTED TO: YMCA of Metropolitan Dallas 601 Akard Street Dallas, Texas 75201 ATTN: Mr. Todd Baker CONTRACTOR: Hill & Wilkinson REPORT NO. 27 REG PROJECT NO. 8524 SAMPLE DATE: 01-11-02 TECHNICIAN: J. Baradziej Location of Sample [ SetNumber ,Location1 Grade beamC-2 JQuantityRepresentedl0/20 Design Information lS°urce °f C°ncrete ILattimore Mix Identification 38 I Specified Strength p.s.i. 3000 Test Results Set Cylinder Age @ Total Load Compressive Average No. ID Date Tested Test lbs. Strength p.s.i. Strength p.s.i. 1 6363 01-18-02 7 65720 2330 6363 02-08-02 28 88860 3150 6363 02-08-02 28 95780 3390 3270 6363 Hold H Cylinder Data Set I Cylinder Time of Concrete Air Ticket lNo. ID Slump Sample Air Temp. Temp. Entrainment Number I 6363 4.5 9:10AM 54 58 N/A 7112467 Mail Distribution: (1) YMCA of Metropolitan Dallas/ Mr. Todd Baker (1) YMCA of Metropolitan Dallas/ Mr. Curt Hazelbaker (1) City of Coppell/Mr. Kenneth Griffen (1) Good Fulton & Farrell/ Mr. Scott Wegener (1) Hill & Wilkinson/Mr. Lanny Huggins (1) Dowdey Anderson & Associates/ Mr. Bill Anderson Submitted by: REED ENGINEERING GROUP, INC. Original Signed By Keith Atkins KEA/mm 2424 STUTZ DR. · SUITE 400 · DALLAS, TX 75235 · TEL [214] 350 5600 · FAX [214] 350 0019 (~t Coppell, Texas ! REPORTED T(I~ YMCA of ~etropolitan Dallas ~,601 Akar~Y Street ~as,~,~xas 75201 ATTI~. Mr. Todd Baker REPORT OF FIELD DENSITY TESTS Coppell YMCA 146 Town Center Boulevard REPORT NO. 8 REPORT DATE: 01-09-02 REG PROJECT NO. 8524 TECHNICI_C~./~: G. Ortiz PAGE: 1 of 1 CONTRACTOR: Hill & Wilkinson Proctor ASTM Optimum ~Maximum No. Standard Description Moisture, % rDensity, PCF 1 D-698 Reddish brown clayey sand "select" fill 13.0 1160 2 D-698 Reddish brown clayey sand 15.0 112.5 3 D-698 Yellowish brown sandy clay 15.0 110.5 4 D-698 Brown sandy clay 15.0 [ 110.0 5 D-698 Dark brown sandy clay 19.5X 101.5 6 D-698 Light brown sandy clay w/gravel 14.5 110.5~ v Depth Below Field Field Test Final S. G.Density Moisture Proctor ompactioni No. Date Location (feet) (pcf) ( %) ID Level (%) 10 12-19-01 BIdg Pad: 20'N, 20'E(1) 1.0 106.4 15.3 3 , 96.2 11 Bldg Pad: 45'N, 25'E(1) 1.0 113.1 15.1 1 [ 97.5 12 Bldg Pad: 30'N, 25'E(1) 0.0 107.1 14.9 3 ~, 96.9 13 Bldg Pad: 45'N, 30'E(1) 0.0 114.0 14.4 1 ~.98.2/ Comments: Where tested, materials were in compliance with project specifications. Footnote: (1) Measurements referenced from existing S.E building corner. Mail Distribution: (1) YMCA of Metropolitan Dallas/ Mr. Todd Baker (1) YMCA of Metropolitan Dallas/ Mr. Curt Hazelbaker (1) City of Coppell/Mr. Kenneth Griffen (1) Good Fulton & Farrell/ Mr. Scott Wegener (1) Hill & Wilkinson/Mr. Lanny Huggins (1) Dowdey Anderson & Associates/ Mr. Bill Anderson Submitted by: REED ENGINEERING GROUP, INC. Original Signed By Ronald F. Reed, P.E. 2424 STUTZDR. · SUITE 400 · DALLAS, TX75235 J T~L [214] 350 5600 · FAX []:~4] 3500019