YMCA-LR020108 REPORT OF PIER OBSERVATION
Coppell YMCA
146 Town Center Boulevard
Coppell, Texas
REPORTED TO~ YMCA of Metropolitan Dallas REPORT NO. 9
J 601 Akard Street REPORT DATE: 01-09-02
J Dallas, Texas 75201 REG PROJECT NO. 8524
~, ATTN: Mr~ Todd Baker TECHNICIAN: S. Davis
~ PAGE: 1 of I
CONTRACTOR: Hill & Wilkinson
Date
Pier No.
Shaft
Size
(inches)
Required
Penetration
(feet)
Depth to
Stratum
(feet)
Total Depth
of Pier
(feet)
Actual
Penetration
(feet)
Concrete!
Length
(feet)
12-20-01
12-21-01
D-2 18 13.0 22.0 35.4 13.4 33.0
.5A-2.8 18 7.0 14.0 21.5 7.5 19.0
~5A-2.6 18 7.0 12.4 20.5 8.1 18.0
A-2.9 18 10.0 13.0 23.0 10.0 20.0
B-2.9 18 10.0 15.0 25.5 10.5 22.5
C-2.9 18 10.0 18.5 28.6 10.1 25.6
C.9-2.9 18 6.0 19.5 25.8 6.3 22.7
D.3-1.9 18 7,0 25.8 33.0 7.2 30.0
.2A-2.6 18 7.0 15.0 23.0 8.0 20.0
A-2.2 18 18.0 16.5 35.0 18.5 31.5
C-2 18 16.0 22.0 39.7 17.7 36.7
B-2 18 16,0 16.0 33.0 17.0 30.0
.5A-2 18 7.0 16.0 23.3 7.3 19.3
Note: All piers required use of temporary casing.
Mail
Distribution: (1) YMCAof Metropolitan Dallas/
Mr. Todd Baker
(1) YMCA of Metropolitan Dallas/
Mr. Curt Hazelbaker
(1) City of Coppell/Mr. Kenneth Griffen
(1) Good Fulton & Farrell/
Mr. Scott Wegener
(1) Hill & Wilkinson/Mr. Lanny Huggins
(1) Dowdey Anderson & Associates/
Mr. Bill Anderson
Submitted by:
REED ENGINEERING GROUP, INC.
Original Signed By
James F. Phipps, P.E.
BW/cg
2424 STUTZ DR. * SUITE 400., DALLAS, TX 75235 · TEL [214) 350 5600 · FAX [214] 350 0019
GEOTECHNICAL AND
ENVIRONMENTAL CONSULTANTS
CONCRETE CYLINDER TEST REPORT
Coppell YMCA
146 Town Center Boulevard
Coppell, Texas
REPORTED TO: YMCA of Metropolitan Dallas
601 Akard Street
Dallas, Texas 75201
ATTN: Mr. Todd Baker
REPORT NO. 21
REG PROJECT NO. 8524
SAMPLE DATE: 01-08-02
TECHNICIAN: R. Bullion
CONTRACTOR: Hilt & Wilkinson
Location of Sample
Set Number I Location I Quantity Represented
1 Piers: F-1.6 and D-1 7/15
Design Information
Source of Concrete I Mix Identification I Specified Strength p.s.i.
LMC 49 3000
Test Results
Set Cylinder Age @ Total Load Compressive Average
No. ID Date Tested Test lbs. Strength p.s.i. Strength p.s.i.
1 6169 01-15-02 7 89650 3170
6169 02-05-02 28 109020 3860
6169 02-05-02 28 118180 4180 4020
6169 Hold H
Cylinder Data
Set Cylinder Time of
No. ID Slump Sample
1 6169
Concrete Air Ticket
Air Temp. Temp. Entrainment Number
6.00 12:00PM 55 66 N/A 07-111359
Mail
Distribution: (1) YMCAof Metropolitan Dallas/
Mr. Todd Baker
(1) YMCA of Metropolitan Dallas/
Mr. Curt Hazelbaker
(1) City of Coppell/Mr. Kenneth Griffen
(1) Good Fulton & Farrell/
Mr. Scott Wegener
(1) Hill & Wilkinson/Mr. Lanny Huggins
(1) Dowdey Anderson & Associates/
Mr. Bill Anderson
Submitted by:
REED ENGINEERING GROUP, INC.
Original Signed By
Keith Atkins
KEA/je
2424 STUTZ DR. · SUITE400 * DALLAS, TX75235 · TEL [~J4] 350 5600 · F^X[21413S00019