YMCA-LR020107~::~ i~r::- r-'~ I E~:I--I r'-~- I n E~:~=' ~ Ir-~ r~--
GEOTECHNICAL AND
ENVIRONP1ENTAL CONSULTANTS
CONCRETE CYLINDER TEST REPORT
Coppell YMCA
146 Town Center Boulevard
Coppell, Texas
REPORTED TO: YMCA of Metropolitan Dallas
601 Akard Street
Dallas, Texas 75201
ATTN: Mr. Todd Baker
REPORT NO. 21
REG PROJECT NO. 8524
SAMPLE DATE: 01-08-02
TECHNICIAN: R. Bullion
CONTRACTOR: Hill & Wilkinson
Location of Sample
Set Number I Location
Quantity Represented
Piers: F-1.6 and D-1
7/15
Design Information
Source of Concrete
LMC
Mix Identification
Specified Strength p.soi.
49 3000
Test Results
Set Cylinder Age @ Total Load Compressive Average
No. ID Date Tested Test lbs. Strength p.s.i. Strength p.s.i.
1 6169 01-15-02 7 89650 3170
6169 02-05-02 28
6169 02-05-02 28
6169 Hold H
Cylinder Data
Set Cylinder I Time of Concrete Air Ticket
No. ID [ Slump Sample Air Temp. Temp. Entrainment Number
1 6169 6.00 12:00PM 55 66 N/A 07-111359
Mail
Distribution: (1) YMCAof Metropolitan Dallas/
Mr. Todd Baker
(1) YMCA of Metropolitan Dallas/
Mr. Cud Hazelbaker
(1) City of Coppell/Mr. Kenneth Griffen
(1) Good Fulton & Farrell/
Mr. Scott Wegener
(1) Hill & Wilkinson/Mr. Lanny HuDgins
(1) Dowdey Anderson & Associates/
Mr. Bill Anderson
Submitted by:
REED ENGINEERING GROUP, INC.
Odginal Signed By
Keith Atkins
KENje
2424 STUTZDR. · SUITE400 · DALLAS, TX 75235 * TEL [214] 3505600 · 6AX [214] 350 0019
CONCRETE CYLINDER TEST REPORT
Coppell YMCA
146 Town Center Boulevard
Coppell, Texas
REPORTED TO: YMCA of Metropolitan Dallas
601 Akard Street
Dallas, Texas 75201
ATTN: Mr. Todd Baker
REPORT NO. 20
REG PROJECT NO. 8524
SAMPLE DATE: 01-07-02
TECHNICIAN: R. Bullion
CONTRACTOR: Hill & Wilkinson
Location of Sample
Set Number I Location I Quantity Represented
1 Piers: E.3-1.6 and E-1.6 7/15
Design Information
Source of Concrete I Mix Identification I Specified Strength p.s.i.
LMC 49 3000
Test Results
Set Cylinder Age @ Total Load Compressive Average
No. ID Date Tested Test lbs. Strength p.s.i. Strength p.s.i.
1 6168 01-14-02 7 103120 3650
6168 02-04-02 28 128260 4540
6168 02-04-02 28 135440 4790
6168 Hold H
467O
Cylinder Data
Set Cylinder Time of Concrete Air Ticket
N . ID Slump Sample Air Temp. Temp. Entrainment Number
~ 6168 4.50 12:05PM 48 61 N/A 07-111285
Mail
Distribution: (1) YMCA of Metropolitan Dallas/
Mr. Todd Baker
(1) YMCA of Metropotitan Dallas/
Mr. Curt Hazelbaker
(1) City of Coppell/Mr. Kenneth Griffen
(1) Good Fulton & Farrell/
Mr. Scott Wegener
(1) Hill & Wilkinson/Mr. Lanny Huggins
(1) Dowdey Anderson & Associates/
Mr. Bill Anderson
Submitted by:
REED ENGINEERING GROUP, INC.
Original Signed By
Keith Atkins
KEA/je
2424 STUTZ DR. · SUITE 400 · DALLAS, TX 75235 · TEL [214] 350 5600 o ~AX [214] 350 0019