Loading...
Windsor Estates-LR010105REPORT OF SOIL-LIME MIXTURE PULVERIZATION ENGINEERING, INC. Date of Service: Client No.: Client: Contractor: Test Location: 01/05/01 Excel Group, Inc. 2639 Walnut Hill Ln. #218 Dallas, TX 75229 Paving Subgrade Test Method: NTCOG Test No. Location 1 2 3 4 5 6 Sta. 5+00 St. James Street Sta. 1+00 St. James Street Sra. 16+00 Deforest Court Sra. 13+00 Deforest Court Sra. 10+00 Deforest Court Sta. 7+00 Deforest Court Report No.: 0101384 Project No.: 94001501 Project: Windsor Estates CoppelI, Texas Specification Requirements: Minimum Passing 1 3/4" Sieve: Minimum Passing #4 Sieve: Sample Condition: Field Moist 1-3/4" Sieve %Pass 100 100 100 100 100 i00 100% 60% #4 Sieve % Pass 68 66 68 64 62 62 Technician: R. Montgomery Started: 2:30 p.m. Stopped: 4:00p.m. Report Distribution: (I) Excel Group, lnc, (I) City of Coppell - Engr. Dept. (I) City of Coppel[ - Bldg. lnsp. 309 /Inc. E~ J. Cleveland, P. E. Senior Project Engineer This m0ort is exclusively for the use of the client indicated above and shall not be reproduced in full without written approval of HBC Engineering, Inc.