Windsor Estates-LR010105REPORT OF SOIL-LIME MIXTURE PULVERIZATION
ENGINEERING, INC.
Date of Service:
Client No.:
Client:
Contractor:
Test Location:
01/05/01
Excel Group, Inc.
2639 Walnut Hill Ln. #218
Dallas, TX 75229
Paving Subgrade
Test Method: NTCOG
Test No. Location
1
2
3
4
5
6
Sta. 5+00 St. James Street
Sta. 1+00 St. James Street
Sra. 16+00 Deforest Court
Sra. 13+00 Deforest Court
Sra. 10+00 Deforest Court
Sta. 7+00 Deforest Court
Report No.: 0101384
Project No.: 94001501
Project: Windsor Estates
CoppelI, Texas
Specification Requirements:
Minimum Passing 1 3/4" Sieve:
Minimum Passing #4 Sieve:
Sample Condition: Field Moist
1-3/4" Sieve
%Pass
100
100
100
100
100
i00
100%
60%
#4 Sieve
% Pass
68
66
68
64
62
62
Technician: R. Montgomery Started: 2:30 p.m. Stopped: 4:00p.m.
Report Distribution:
(I) Excel Group, lnc,
(I) City of Coppell - Engr. Dept.
(I) City of Coppel[ - Bldg. lnsp.
309
/Inc.
E~ J. Cleveland, P. E.
Senior Project Engineer
This m0ort is exclusively for the use of the client indicated above and shall not be reproduced in full without written approval of HBC Engineering, Inc.