Windsor Estates-CS020219CASTELLAN DEVELOPMENT, L.P.
2639WALNUT HILLLANE
DALLAS, TEXaS75229
214-353-9058 FAX214-351-2828
February 19, 2002
Mr. Gary Johnson, P.E.
City of Coppell - Engineering Department
255 Parkway Blvd.
Coppell, Texas 75019
Regarding: Windsor Estates
Dear Mr. Johnson,
In regards to the completion of the Windsor Estates Development, we request the final acx:eptance from the
City of Coppell with the understanding the following two items will be completed within 30 days from the
City's approval of the engineered drawings submitted by Halff Associates related to the retaining wall
located on the south side of Deforest Road.
I. Complete the retaining wall at the inlet located on the south side of Deforest Road.
2. Install guardrail on Deforest Road at the inlet and retaining wall on south side of road.
A check in the amount of $2,250.00 is enclosed to be escrowed by the City of Coppell for the guardrail
valued at $750.00 and the retaining wall valued at $1,500.00 until the completion of said items.
Also enclosed is the Maintenance Bond for Deforest Road, the Maintenance Bond for the Utilities, a check
for $2,100.00 to be escrowed by the City of Coppell for maintaining the erosion control in lieu ora bond,
and a note from Magnum Surveying verifying that the elevations on Deforest Road reflect the engineered
drawings provided by Halff and Associates.
Thank you for your consideration, and 1 look forward to hearing from you.
Manager /