Amberpoint BP-LR020209 (2)WATER INJECTION OBSERVATION
Date of Service:
Client No.:
Client:
Location:
Procedure:
02/09/02
3181
Transwestem Commercial Services
5001 Spring Valley Rd, Suite 600 W
Dallas, TX 75244
Report No.:
Project No.:
Project:
Building Pad
General Contractor:
Injector:
94021029.0046
94021029
Amberpoint Building No. 1
Amberpoint Bus. Pk ~ Coppell
Coppell, Texas
Hill & Wilkinson
Jowell
On this date, a representative of HBC Engineering, Inc. observed the injection of water at this
site. During the injection process, the following observations were recorded.
Pass No.: 6th No. of Probes: 4 Probe Length: 10 feet
OBSERVATION
SPECIFICATION Yes No N/A
Surfactant added to each load. X
Injection pressure 50 to 200 psi at manifold. X
Injection downward in 18 inch intervals. X
Total depth of injection was 7 feet. X
Spacing of injection was 5 feet maximum. X
Iqjection to refusal at each location. X
Comments:
Technician: M. Arandia
Report Distribution:
(l) Transwcstem Commercial Services
(1) O'Brien & Associates, Inc.
(1) TechniStmctures, Inc.
(1) City of Coppell - Constr. Insp.
(1) City of Coppeil -Bldg. lnsp.
(1) ltill & Wilkinson, Ltd.
(1) Halff Associates
(1) State Farm Insurance
m~ Engineering, Inc.
Eugene Harbour
Principal
99ss This re~ort is exclusively for the use of the client indicated above and shall not be reprcduced in full witho~ wrfften approval of HBC Engineer