Amberpoint BP-LR020209
WATER INJECTION OBSERVATION
ENGINEERIi~, I/~.
Date of Service:
Client No.:
Client:
02/09/02
3181
Transwestem Commercial Services
5001 Spring Valley Rd, Suite 600 W
Dallas, TX 75244
Report No.:
Project No.:
Project:
94021029.0045
94021029
Amberpoint Building No. l
Amberpoint Bus. Pk ~ Coppell
Coppell, Texas
Location:
Building Pad
General Contractor: Hill & Wilkinson
Injector: Jowell
Procedure:
On this date, a representative of HBC Engineering, Inc. observed the injection of water at this
site. During the injection process, the following observations were recorded.
Pass No.: 6th No. of Probes: 4 Probe Length: 12 feet
OBSERVATION
SPECIFICATION Yes No N/A
Surfactant added to each load. X
Injection pressure 50 to 200 psi at manifold. X
Injection downward in 18 inch intervals. X
Total depth of injection was 10 feet. X
Spacing of injection was 5 feet maximum. X
Ir~iection to refusal at each location. X
Comments:
Technician: S. Campbell
Report Distribution:
(1) Transwcstem Commercial Services
(1) O'Brien & Associates, Inc.
(1) T¢chniStmctures, Inc.
(1) City of Coppell - Constr. lnsp.
(1) City of Coppell - Bldg. lnsp.
(I) Hill & Wilkinson, Ltd.
(1) HalffAssocintes
(1) State Farm Insurance
~ Engineering, Inc.
Eugene Harbour
Principal
9gss 'rl~s report is exclusively for the use of the client indicated above and shall not be reproduced in full witl~ut written approval of HBC Engineer