Loading...
Amberpoint BP-LR020209 WATER INJECTION OBSERVATION ENGINEERIi~, I/~. Date of Service: Client No.: Client: 02/09/02 3181 Transwestem Commercial Services 5001 Spring Valley Rd, Suite 600 W Dallas, TX 75244 Report No.: Project No.: Project: 94021029.0045 94021029 Amberpoint Building No. l Amberpoint Bus. Pk ~ Coppell Coppell, Texas Location: Building Pad General Contractor: Hill & Wilkinson Injector: Jowell Procedure: On this date, a representative of HBC Engineering, Inc. observed the injection of water at this site. During the injection process, the following observations were recorded. Pass No.: 6th No. of Probes: 4 Probe Length: 12 feet OBSERVATION SPECIFICATION Yes No N/A Surfactant added to each load. X Injection pressure 50 to 200 psi at manifold. X Injection downward in 18 inch intervals. X Total depth of injection was 10 feet. X Spacing of injection was 5 feet maximum. X Ir~iection to refusal at each location. X Comments: Technician: S. Campbell Report Distribution: (1) Transwcstem Commercial Services (1) O'Brien & Associates, Inc. (1) T¢chniStmctures, Inc. (1) City of Coppell - Constr. lnsp. (1) City of Coppell - Bldg. lnsp. (I) Hill & Wilkinson, Ltd. (1) HalffAssocintes (1) State Farm Insurance ~ Engineering, Inc. Eugene Harbour Principal 9gss 'rl~s report is exclusively for the use of the client indicated above and shall not be reproduced in full witl~ut written approval of HBC Engineer