Loading...
Amberpoint BP-LR020208WATER INJECTION OBSERVATION Date of Service: Client No.: Client: 02/08/02 3181 Transwestem Commercial Services 5001 Spring Valley Rd., Suite 600W Dallas, Texas 75244 Report No.: Project No.: Project: 94021029.0044 94021029 Ambe~point Building No. 1 Amberpoint Bus. Pk @ Coppell Coppell, Texas Location: Building Pad, lines M to Q and 5.5 General Contractor: Hill & Wilkinson to 11 Injeetor: JowelI Procedure: On this date, a representative of HBC Engineering, Inc. observed the injection of water at this site. During the injection process, the following observations were recorded. Pass No.: 4th No. of Probes: 4 Probe Length: 10 feet OBSERVATION SPECIFICATION Yes No N/A Surfactant added to each load. X Injection pressure 50 to 200 psi at manifold. X Injection downward in 18 inch intervals. X Total depth of injection was 10 feet. X Spacing of injection was 5 feet maximum. X Injection to refusal at each location. X Comments: Technician; S. Long/M. Arandia Report Distribution: (1) Transwestern Commercial Serviccs (1) O'Bden & Associates, Inc. ( 1 ) TechniStructures, lac. (1) City of Coppcll - Constr. lnsp. (1) City of Coppell - Bldg. Insp (1) Hill & Wilkinson, Ltd. ( 1 ) Halff Associates (1) State Farm Insurance I-~ Engineering, Inc. Eugene Harbour Principal 99sks This report is exclusively for the use of the client indicated above and shall not be reproduced in full without written approval of HBC Engineer ?? _1