Amberpoint BP-LR020208WATER INJECTION OBSERVATION
Date of Service:
Client No.:
Client:
02/08/02
3181
Transwestem Commercial Services
5001 Spring Valley Rd., Suite 600W
Dallas, Texas 75244
Report No.:
Project No.:
Project:
94021029.0044
94021029
Ambe~point Building No. 1
Amberpoint Bus. Pk @ Coppell
Coppell, Texas
Location:
Building Pad, lines M to Q and 5.5 General Contractor: Hill & Wilkinson
to 11 Injeetor: JowelI
Procedure:
On this date, a representative of HBC Engineering, Inc. observed the injection of water at this
site. During the injection process, the following observations were recorded.
Pass No.: 4th No. of Probes: 4 Probe Length: 10 feet
OBSERVATION
SPECIFICATION Yes No N/A
Surfactant added to each load. X
Injection pressure 50 to 200 psi at manifold. X
Injection downward in 18 inch intervals. X
Total depth of injection was 10 feet. X
Spacing of injection was 5 feet maximum. X
Injection to refusal at each location. X
Comments:
Technician; S. Long/M. Arandia
Report Distribution:
(1) Transwestern Commercial Serviccs
(1) O'Bden & Associates, Inc.
( 1 ) TechniStructures, lac.
(1) City of Coppcll - Constr. lnsp.
(1) City of Coppell - Bldg. Insp
(1) Hill & Wilkinson, Ltd.
( 1 ) Halff Associates
(1) State Farm Insurance
I-~ Engineering, Inc.
Eugene Harbour
Principal
99sks This report is exclusively for the use of the client indicated above and shall not be reproduced in full without written approval of HBC Engineer
??
_1