Amberpoint BP-LR020208 (2)WATER INJECTION OBSERVATION
ENGINEERING, INC.
Date of Service:
Client No.:
Client:
Location:
02/08/02
3181
Transwestern Commercial Services
5001 Spring Valley Rd., Suite 600W
Dallas, Texas 75244
Report No.:
Project No.:
Project:
Building Pad
General Contractor:
Injector:
94021029.0043
94021029
Amberpoint Building No. 1
Amberpoint Bus. Pk @ Coppell
Coppell, Texas
Hill & Wilkinson
Jowell
Procedure:
On this date, a representative of HBC Engineering, Inc. observed the injection of water at this
site. During the injection process, the following observations were recorded.
Pass No.: 5th No. of Probes: 4 Probe Length: 12 feet
OBSEI~IVATION
SPECIFICATION Yes No N/A
Surfactant added to each load. X
Injection pressure 50 to 200 psi at manifold. X
Injection downward in 18 inch intervals. X
Total depth of injection was 10 feet. X
Spacing of injection was 5 feet maximum. X
Iniection to refusal at each location. X
Comments:
Technician: g. Campbell
Report Distribution:
(I) Transwestem Commercial Services
(I) O'Bden & Associates, Inc.
(1) TechniStructures, Inc.
(1) City of Coppell - Constr. Insp.
99sks
(1) City of Coppell Bldg. Insp
(1) Hill & Wilkinson, Ltd
( 1 ) Halff Associates
(1) State Farm Insurance
IBC Engineering, Inc.
Eugene Harbour
Principal