Loading...
Amberpoint BP-LR020208 (2)WATER INJECTION OBSERVATION ENGINEERING, INC. Date of Service: Client No.: Client: Location: 02/08/02 3181 Transwestern Commercial Services 5001 Spring Valley Rd., Suite 600W Dallas, Texas 75244 Report No.: Project No.: Project: Building Pad General Contractor: Injector: 94021029.0043 94021029 Amberpoint Building No. 1 Amberpoint Bus. Pk @ Coppell Coppell, Texas Hill & Wilkinson Jowell Procedure: On this date, a representative of HBC Engineering, Inc. observed the injection of water at this site. During the injection process, the following observations were recorded. Pass No.: 5th No. of Probes: 4 Probe Length: 12 feet OBSEI~IVATION SPECIFICATION Yes No N/A Surfactant added to each load. X Injection pressure 50 to 200 psi at manifold. X Injection downward in 18 inch intervals. X Total depth of injection was 10 feet. X Spacing of injection was 5 feet maximum. X Iniection to refusal at each location. X Comments: Technician: g. Campbell Report Distribution: (I) Transwestem Commercial Services (I) O'Bden & Associates, Inc. (1) TechniStructures, Inc. (1) City of Coppell - Constr. Insp. 99sks (1) City of Coppell Bldg. Insp (1) Hill & Wilkinson, Ltd ( 1 ) Halff Associates (1) State Farm Insurance IBC Engineering, Inc. Eugene Harbour Principal This repod is exclusively for the use of the client indicated above and shall not be reproduced in full without written approval of HBC Engineer