Amberpoint BP-LR020207WATER INJECTION OBSERVATION
ENGIt',~ERING, INC.
Date of Service:
Client No.:
Client:
Location:
02/07/02
3181
Transwestem Commercial Services
5001 Spring Valley Rd., Suite 600W
Dallas, Texas 75244
Report No.:
Project No.:
Project:
Building Pad, lines 5.5 to 6.8, L to General Contractor:
Q and lines 6.8 to 11, L to M Injector:
94021029.0042
94021029
Amberpoint Building No. 1
Amberpoint Bus. Pk @ Coppell
Coppell, Texas
Hill & Wilkinson
Jowell
Procedure:
On this date, a representative of HBC Engineering, Inc. observed the injection of water at this
site. During the injection process, the following observations were recorded.
Pass No.: 3rd & 4th No. of Probes: 4 Probe Length: 10 feet
OBSERVATION
SPECIFICATION Yes No N/A
Surfactant added to each load. X
Injection pressure 50 to 200 psi at manifold. X
Injection downward in 18 inch intervals. X
Total depth of injection was 10 feet. X
Spacing of injection was 5 feet maximum. X
~jection to refusal at each location. X
Comments:
Technician: S. Long
Report Distribution:
(1) Transwestem Commercial Services
(I) O'Brien & Associates, Inc.
( I ) TechniStructures, Inc.
( I ) City of Coppell - Constr. Insp.
99sks
(1) City of Coppell - Bldg Insp.
(1) Hill & Wilkinson, Ltd.
( I ) Halff Associates
(1) State Farm Insurance
Engineering, Inc.
Eugene Harbour
Principal
This report is exclusively for the use of the client indicated above and shall not be reproduced in full without written approval of HBC Engineer
I.
WATER INJECTION OBSERVATION
ENGINEERING, INC.
Date of Service:
Client No.:
Client:
Location:
02/07/02
3181
Transwestern Commercial Services
5001 Spring Valley Rd., Suite 600W
Dallas, Texas 75244
Report No.:
Project No.:
Project:
Building Pad #2
General Contractor:
Injector:
94021029.0041
94021029
Amberpoint Building No. 1
Amberpoint Bus. Pk @ Coppell
Coppell, Texas
Hill & Wilkinson
Jowell
Procedure:
On this date, a representative of HBC Engineering, Inc. observed the injection of water at this
site. During the injection process, the following observations were recorded.
Pass No.: 5th No. of Probes: 4 Probe Length: 12 feet
OBSERVATION
SPECIFICATION Yes No N/A
Surfactant added to each load. X
Injection pressure 50 to 200 psi at manifold. X
Injection downward in 18 inch intervals. X
Total depth of injection was 10 feet. X
Spacing of injection was 5 feet maximum. X
Iniection to refusal at each location. X
Comments:
Technician: S. Campbell
Report Distribution:
( 1 ) Transwestem Conmnercial Serviccs
(1) O'Brien & A~sociates, Inc.
(1) TechniStxuctures, Inc.
( 1 ) City of Coppell - Constr. [asp.
99sks
( 1 ) City of Coppell - Bldg. lnsp.
(1) Hill & Wilkinson, Ltd.
(1) Halff Associates
(1) State Farm Insurance
Engineering, Inc.
Eugene Harbour
Principal
This report is exclusively for the use of the client indicated above and shall not be reproduced in full without written approval of HBC Engineer