Amberpoint BP-LR020202WATER INJECTION OBSERVATION
ENGINEERING, INC.
Date of Service:
Client No.:
Client:
Location:
02/02/02
3181
Transwestem Commercial Services
5001 Spring Valley Rd., Suite 600W
Dallas, Texas 75244
Report No.:
Project No.:
Project:
Building Pad, lines 0.5 to N.5 and General Contractor:
5.5 to 11 Injector:
94021029.0033
94021029
Amberpoint Building No. 1
Amberpoint Bus. Pk @ Coppell
Coppell, Texas
Hill & Wilkinson
Jowell
Procedure:
On this date, a representative of HBC Engineering, Inc. observed the injection of water at this
site. During the injection process, the following observations were recorded.
Pass No.: 2nd No. of Probes: 4 Probe Length: 10 feet
OBSERVATION
SPECIFICATION Yes No N/A
Surfactant added to each load. X
Injection pressure 50 to 200 psi at manifold. X
Injection downward in 18 inch intervals. X
Total depth of injection was 10 feet. X
Spacing of injection was 5 feet maximum. X
Iniection to refusal at each location. X
Comments:
Technician: S. Long
Report Distribution:
(l) Transwcstem Commercial Services
(I) O'Brien & Associates. Inc.
(1) TechniStructures, Inc.
(1) City of Coppell - Constr. lnsp.
99ss
(1) City of Coppcll - Bldg. Insp.
(1) Hill & Wilkinson, Ltd.
( 1 ) Halff Associates
(1) State Farm Insurance
Engineering, Inc.
Eugene Harbour
Principal
This report is exclusively for the use of the client indicated above and shall not be reproduced in full without written approval of HBC Engineer
J__ I I_ -~/~3__-_i _ I_ L__
t I I I I I I I
WATER INJECTION OBSERVATION
ENGINI~RING, INC.
Date of Service:
Client No.:
Client:
02/02/02
3181
Transwestern Commercial Services
5001 Spring Valley Rd., Suite 600W
Dallas, Texas 75244
Report No.:
Project No.:
Project:
94021029.0032
94021029
Amberpoint Building No. 1
Amberpoint Bus. Pk @ Coppell
Coppell, Texas
Location:
Building Pad
General Contractor: Hill & Wilkinson
Injector: Jowell
Procedure:
On this date, a representative of HBC Engineenng, Inc. observed the injection of water at this
site. During the injection process, the following observations were recorded.
Pass No.: 3rd No. of Probes: 4 Probe Length: 18 feet
OBSERVATION
SPECIFICATION Yes No N/A
Surfactant added to each load. X
Injection pressure 50 to 200 psi at manifold. X
Injection downward in 18 inch intervals. X
Total depth of injection was 10 feet. X
Spacing of injection was 5 feet maximum. X
Injection to refusal at each location. X
Comments:
Technician: S. Campbell
Report Distribution:
( I ) Trans~vestern Cormnercial Services
(1) O'Brien & Associates, lac.
(I) TechniStructures, Inc.
( 1 ) City of Coppell - Constr. lnsp.
99ss
( 1 ) City of Coppell - Bldg lnsp
(I) Hill & Wilkinson, Ltd.
( 1 ) Halff Associates
(I) State Farm Insurance
~ Engineering, Inc.
Eugene Harbour
Principal