Loading...
Amberpoint BP-LR020202WATER INJECTION OBSERVATION ENGINEERING, INC. Date of Service: Client No.: Client: Location: 02/02/02 3181 Transwestem Commercial Services 5001 Spring Valley Rd., Suite 600W Dallas, Texas 75244 Report No.: Project No.: Project: Building Pad, lines 0.5 to N.5 and General Contractor: 5.5 to 11 Injector: 94021029.0033 94021029 Amberpoint Building No. 1 Amberpoint Bus. Pk @ Coppell Coppell, Texas Hill & Wilkinson Jowell Procedure: On this date, a representative of HBC Engineering, Inc. observed the injection of water at this site. During the injection process, the following observations were recorded. Pass No.: 2nd No. of Probes: 4 Probe Length: 10 feet OBSERVATION SPECIFICATION Yes No N/A Surfactant added to each load. X Injection pressure 50 to 200 psi at manifold. X Injection downward in 18 inch intervals. X Total depth of injection was 10 feet. X Spacing of injection was 5 feet maximum. X Iniection to refusal at each location. X Comments: Technician: S. Long Report Distribution: (l) Transwcstem Commercial Services (I) O'Brien & Associates. Inc. (1) TechniStructures, Inc. (1) City of Coppell - Constr. lnsp. 99ss (1) City of Coppcll - Bldg. Insp. (1) Hill & Wilkinson, Ltd. ( 1 ) Halff Associates (1) State Farm Insurance Engineering, Inc. Eugene Harbour Principal This report is exclusively for the use of the client indicated above and shall not be reproduced in full without written approval of HBC Engineer J__ I I_ -~/~3__-_i _ I_ L__ t I I I I I I I WATER INJECTION OBSERVATION ENGINI~RING, INC. Date of Service: Client No.: Client: 02/02/02 3181 Transwestern Commercial Services 5001 Spring Valley Rd., Suite 600W Dallas, Texas 75244 Report No.: Project No.: Project: 94021029.0032 94021029 Amberpoint Building No. 1 Amberpoint Bus. Pk @ Coppell Coppell, Texas Location: Building Pad General Contractor: Hill & Wilkinson Injector: Jowell Procedure: On this date, a representative of HBC Engineenng, Inc. observed the injection of water at this site. During the injection process, the following observations were recorded. Pass No.: 3rd No. of Probes: 4 Probe Length: 18 feet OBSERVATION SPECIFICATION Yes No N/A Surfactant added to each load. X Injection pressure 50 to 200 psi at manifold. X Injection downward in 18 inch intervals. X Total depth of injection was 10 feet. X Spacing of injection was 5 feet maximum. X Injection to refusal at each location. X Comments: Technician: S. Campbell Report Distribution: ( I ) Trans~vestern Cormnercial Services (1) O'Brien & Associates, lac. (I) TechniStructures, Inc. ( 1 ) City of Coppell - Constr. lnsp. 99ss ( 1 ) City of Coppell - Bldg lnsp (I) Hill & Wilkinson, Ltd. ( 1 ) Halff Associates (I) State Farm Insurance ~ Engineering, Inc. Eugene Harbour Principal This report is exclusively for the use of the client indicated above and shall not be reproduced in full without written approval of HBC Engineer ,1°