Amberpoint BP-LR020201WATER INJECTION OBSERVATION
ENGINEEPdNG, INC.
Date of Service: 02/01/02
Client No.: ~ -~.
Clie~,~[ranswestem Comm~ices %
f 5001Spri~, Suite 600W ·
D as 75244
Location:
Report No.:
Project No.:
Project:
Building Pad, lines 5.5 to 11, M to General Contractor:
N.5 & lines 10 to 11, G to L.5 Iniector:
94021029.0031
94021029
Amberpoint Building No. 1
Amberpoint Bus. Pk @ Coppell
Coppell, Texas
Hill & Wilkinson
Jowell
Procedure:
On this date, a representative of HBC Engineering, Inc. observed the injection of water at this
site. During the injection process, the following observations were recorded.
Pass No.: 2nd & 3rd No. of Probes: 4 Probe Length: 10 feet
OBSERVATION
SPECIFICATION Yes No N/A
Surfactant added to each load. X
Injection pressure 50 to 200 psi at manifold. X
Injection downward in 18 inch intervals. X
Total depth of injection was 10 feet. X
Spacing of injection was 5 feet maximum. X
In, iection to refusal at each location. X
Comments:
Technician: S. Long
Report Distribution:
(1) Transwestem Commercial Services
(1) O'Brien & Associates, inc.
( 1 ) TechniStructures. Inc.
(I) City of Coppell - Constr. lnsp.
(1) City of Coppell - Bldg. lnsp.
(1) Hill & Wilkinson, Ltd.
( 1 ) Halff Associates
(1) State Farm Insurance
~ Engineering, Inc.
Eugene Harbour
Principal
99ss This report is exclusively for the use of the client indicated above and shall not be reproduced in full without writlen approval of HBC Engineer
® ???
??
??
WATER INJECTION OBSERVATION
ENGINEERING, INC.
Date of Service:
Client No.:
Client:
02/01/02
3181
Transwestern Commercial Services
5001 Spring Valley Rd., Suite 600W
Dallas, Texas 75244
Report No.:
Project No.:
Project:
94021029.0030
94021029
Amberpoint Building No. !
Amberpoint Bus. Pk @ Coppell
Coppell, Texas
Location:
Building Pad
General Contractor: Hill & Wilkinson
Injector: Jowell
Procedure:
On this date, a representative of I:tBC Engineering, Inc. observed the injection of water at this
site. During the injection process, the following observations were recorded.
Pass No.: 4th No. of Probes: 4 Probe Length: 12 feet
OBSERVATION
SPECIFICATION Yes No N/A
Surfactant added to each load. X
Injection pressure 50 to 200 psi at manifold. X
Injection downward in 18 inch intervals. X
Total depth of injection was i0 feet. X
Spacin~ of injection was 5 feet maximum. X
Iniection to refusal at each location. X
Comments:
Technician: S. Campbell
Report Distribution:
(I) Transwestem Commercial Services
(1) O'Brien & Associates, Inc.
(1) TechniStmctures, Inc.
(I) City of Coppell - Const~. Insp.
(1) City of Coppell - Bldg. lnsp.
(1) Hill & Wilkinson, Ltd
( 1 ) Halff Associates
(1) State Farm Insurance
Engineering, Inc.
Eugene Harbour
Principal
99ss This report is exclusively for the use of the client indicated above and shall not be reproduced in full without wdtten approval of HBC Engineer