Loading...
Amberpoint BP-LR020129 (2)WATER INJECTION OBSERVATION Date of Service: Client No.: Client: 01/29/O2 3181 Transwestern Commercial Services 5001 Spring Valley Rd., Suite 600 W Dallas, TX 75244 Report No.: Project No.: Project: 94021029.0025 94021029 Amberpoint Building No. 1 Amberpoint Bus. Pk ~ Coppell Coppell, Texas Location: Building Pad at lines 5.2 tol 1 and M to J.5 General Contractor: HilI& Wilkinson Injector: Jowell Procedure: On this date, a representative of HBC Engineering, Inc. observed the injection of water at this site. During the injection process, the following observations were recorded. Pass No.: 2nd No. of Probes: 4 Probe Length: 18 feet OBSERVATION SPECIFICATION Yes No N/A Surfactant added to each load. X Iniection pressure 50 to 200 psi at manifold. X Iniection downward in 18 inch intervals. X Total depth of injection was 10 feet. X Spacing ofiniection was 5 feet maximum X I~iection to refusal at each location. X Comments: Technician: S.Long Report Distribution: ( 1 ) Tramwestem Conunercial Services (1) O'Brien & ~sociates, Inc. (1) TechniStractures, Inc. (1) City of Coppell - Cormr. Insp. 99[Iw I-fiG Engineering, Inc. (1) City of Coppell - Bldg. h~sp. (l) Hill & Wilkinson, Ltd. ~ Eugene Harbour Principal This repori is exclusively for the use of the clienl indicated above and shall not be reproduced in full without written approval of HEIC Engineer WATER INJECTION OBSERVATION ENGINEEPdNG, INC. Date of Service: Client No.: Client: 01/28/02 3181 Transwestem Commercial Services 5001 Spring Valley Rd, Suite 600 W Dallas, TX 75244 Report No.: Project No.: Project: 94021029.0019 94021029 Amberpoint Building No. 1 Amberpoint Bus. Pk. @ Coppell Coppell, Texas Location: Building Pad General Contractor: Hill & Wilkinson Injector: Jowell Procedure: On this date, a representative of HBC Engineering, Inc. observed the injection of water at this site. During the injection process, the following observations were recorded. Pass No.: 1st No. of Probes: 4 Probe Length: 10 feet OBSERVATION SPECIFICATION Yes No N/A Surfactant added to each load. X Injection pressure 50 to 200 psi at manifold. X Injection downward in 18 inch intervals. X Total depth of injection was 10 feet. X Spacing of injection was 5 feet maximum. X Injection to refusal at each location. X Comments: Technician: S. Long Report Distribution: ( 1 ) Transwestem Commercial Services (1) O'Brien & Associates, Inc. (1) TechniStructures, Inc. (1) City of Coppell - Constr. lnsp. (1) City of Coppell - Bldg. Insp. (1) Hill & Wilkinson. Ltd (1) Halff Associates (1) State Farm Insurance ~ Engineering, Inc. Eugene Harbour Principal 99ss This report is exclusively for the use of the client indicated above and shall not be reproduced in full without written approval of HBC Engineer