Loading...
Amberpoint BP-LR020128WATER INJECTION OBSERVATION ENG--, [NC. Date of Service: Client No.: Client: Location: Procedure: 01/28/02 3181 Transwestem Commercial Services 5001 Spring Valley Rd, Suite 600 W Dallas, TX 75244 Report No.: Project No.: Project: 94021029.0018 94021029 Amberpoint Building No. 1 Amberpoint Bus. Pk @ Coppell Coppell, Texas Building Pad General Contractor: Hill & Wilkinson Injector: Jowell On this date, a representative of HBC Engineering, Inc. observed the injection of water at this site. During the injection process, the following observations were recorded. Pass No.: 2nd No. of Probes: 4 Probe Length: 12 feet OBSERVATION SPECIFICATION Yes No N/A Surfactant added to each load. X Injection pressure 50 to 200 psi at manifold. X Injection downward in 18 inch intervals. X Total depth of injection was 10 feet. X Spacing of injection was 5 feet maximum. X Injection to refusal at each location. X Comments: Technician: S. Campbell Report Distribution: (1) Transwestem Co~mmercial Services (1) O'Brien & Associates, Inc. (1) TechniStmctures, Inc. (1) City of Coppell - Constr. Insp. (1) City of Coppoll - Bldg. Insp. (1) Hill & Wilkinson, Ltd. (1) Halff Associates (1) State Farm Insurance ~ Engineering, Inc. Eugene Harbour Principal 99ss This report is exclusively tot the use of the client indicated above and shall not be reproduced in tull without wrilten approval of HBO Engineer I ]_ I