Loading...
Amberpoint BP-LR020221February 21,2002 ENGINEERING, INC. a a~is~o,, of ] rerracon Transwestern Commercial Services 5001 Spring Valley Road, Suite 600W Dallas, Texas 75244 Attn: Mr. Jim Gaspard Re: Moisture Evaluation No. 2 Amberpoint Building No. 1 Coppell, Texas HBC Project No. 94021029.0038 Gentlemen: HBC Engineering (HBC) has completed its second evaluation of moisture levels achieved by water pressure injection at the above referenced site. This evaluation was performed along the north portion of the Building No. 1 pad. The northwest portion of the pad was injected with six passes with water and the northeast portion of the pad with four passes with water prior to this evaluation. A total of 16 borings were drilled at the site on February 12 and 13, 2002. Borings 1 through 6 are associated with the northwest portion of the pad and Borings 7 through 16 with the northeast portion. Each bodng was continuously sampled to a depth of about 8 feet with steel tubes. The samples were extruded, logged, sealed and packaged at the site for transportation to the laboratory. In the laboratory, moisture content and hand penetrometer readings were determined on one foot intervals. Absorption swell tests and Atterberg Limits were also pertormed on selected samples obtained from the northwest portion of the building pad to further evaluate the volume change potential of the injected clays. A diagram depicting the approximate boring locations is attached. Laboratory data is provided on the attached Summary of Laboratory Tests and Swell Tests Results. Review of moisture content determinations, hand penetrometer, and swell tests indicate that the moisture levels are generally several percentage points below the desired levets with some intervals in some borings near the desired levels. Therefore, HBC recommends that the northwest portion of the slab be injected by one additional injection using water and surfactant, and the northeast portion of the slab be injected by three additional injections. The approximate areas to be reinjected are shown on the attached Boring Location Diagram. Additional moisture evaluations will be required once the additional passes with water are completed. This information was conveyed to Hill and Wilkinson on February 14, 2002. Houstoa Dallas Fort Worth Austin Texas City 11555 Clay Road 8901 Carpenter Frwy. 2601 Gravel Drive 5307 Industrial Oaks Blvd. 3602 3rd Avenue North Suite 100 Suite 100 Fort Worth, TX 76118 Suite 160 Texas City, Texas 77590 Houston, TX 77043 Dallas. TX 75247 (817) 268*8600 Austin, TX 78735 (4091945-3503 (713) 690-8989 (214) 630-I010 Fax (817) 268-8602 (512) 442~1122 Fax /409) 945 5077 Fax (713 ) 690-8787 Fax (214) 630-7070 Fax (512) 442-1181 Mr. Jim Gaspard Transwestem Commercial Services February 21 2002 Page 2 Please contact us if there are any questions concerning the test results or recommendations. Sincerely, HBC ENGINEERING a division oflErr"~ Project Engineer CC: O'Brien & Associates / Richard Nordyke (1) TechniStructures, inc. / Keith Leslie (1) -City of Coppell - Const. Insp. / Larry Davis (1) City of Coppell - Bldg. Insp. / Lee Stone (1) Hi[I& Wilkinson, Ltd. / Bryan Diagle/Kirk Woltman (1) Halff Associates/Jaime Beard/Travis Markham (1) LEGEND: AREA TO BE INJECTED WITH ONE ADDITIONAL PASS WITH WATER AREA TO BE INJECTED WITH THREE ADDITIONAL PASSES WITH WATER SANDY LAKE ROAD NOTE: BORING LOCATIONS ARE APPROXIMATE 0 125 250 FEET APPROXIMATE SCALE BORING LOCATION DIAGRAM MOISTURE EVALUATION No. 2 AMBERPOINT BUILDING No. 1 COPPELL, TEXAS Project No., 94021029 Date, 02/13/02 MOISTURE EVALUATION NO. 2 SUMMARY OF LABORATORY TESTS PROJECT NAME: Amberpoint Building No. 1 Coppell, Texas PROJECT NO.: 94021029.0053 DATE: 02/21/02 Boring Depth Percent Hand Number /feett u0i~ture 1 0-1 24 2.50 1-2 17 4,5+ 2-3 19 4.5O 3-4 22 3.50 4-5 23 3.00 5-6 18 4.5+ 6-7 19 4.5+ 7-8 22 3.50 2 0-1 24 1.50 1-2 20 4.5+ 2-3 19 3.75 3-4 19 4.5+ 4-5 20 3.75 5-6 20 4.5+ 6-7 20 4.5+ 7-8 20 4.00 3 0-1 19 4.5+ - 1-2 18 4.5+ 2-3 23 2.25 3-4 25 2.25 4-5 25 3.00 5-6 24 3.25 6-7 18 3.00 7-8 18 3.00 4 0-1 22 1.00 1-2 29 1.25 2-3 19 4.5+ 3-4 19 4.5+ 4-5 24 3.50 5-6 26 3.00 6-7 26 1.25 7-8 23 2.25 5 0-1 34 0.25 1-2 25 1.75 2-3 18 4.5+ 3-4 23 3.25 4-5 20 4.5+ 5-6 23 4.5+ 6-7 22 4.25 6 0-1 32 0.50 1-2 25 2.00 2-3 24 2.75 3-4 18 4.5+ 4-5 23 3.75 5-6 25 2.50 6-7 25 3.25 7-8 23 4.00 MOISTURE EVALUATION NO. 2 SUMMARY OF LABORATORY TESTS PROJECT NAME: Amberpoint Building No. 1 Coppe~l, Texas PROJECT NO.: 94021029.0053 DATE: 02/21/02 7 0-1 22 0.75 1-2 24 1.25 2-3 22 1.25 3-4 22 1.50 4-5 22 2.50 5-5 21 4.30 5-7 21 4.5+ 7-8 21 3.25 8 0-1 20 2.00 1-2 20 1.75 2-3 19 2.00 3-4 17 4.5+ 4-5 17 4.5+ 5-6 18 4.5+ 6-7 17 4.00 7-8 14 4.5+ 9 0-1- 23 1.75 1-2 15 4.5+ 2-3 15 4.5+ 3-4 16 4.5+ 4-5 17 4.5+ 5-6 17 4.00 6-7 16 3.75 7-8 15 4.5+ 10 0-1 1-2 15 3.50 2-3 20 3.00 3-4 23 2.00 4-5 19 4.5+ 5-6 19 4.5+ 6-7 17 4.25 7-8 11 4,5+ 11 0-1 24 1.25 1-2 17 4.5+ 2-3 17 4.5+ 3-4 15 4.50 4-5 20 4.5+ 5-6 20 3.50 6-7 22 3.25 7-8 19 3.75 12 0-1 23 1.25 1-2 24 1.75 2-3 16 4.5+ 3-4 16 3.50 4-5 19 3.25 5-6 20 2.00 6-7 20 2.50 7-8 20 3.00 MOISTURE EVALUATION NO. 2 SUMMARY OF LABORATORY TESTS PROJECT NAME: Amberpoint Building No. 1 Coppell, Texas PROJECT NO.: 94021029.0053 DATE: 02/21/02 Boring Depth Percent Hand Number (feett Moisiufe ; ;Pe~tmmete~ 13 0-1 26 0.50 1-2 22 4.5+ 2-3 21 4.5+ 3-4 17 4.5+ 4-5 15 4.5+ 5-6 20 4.5+ 6-7 19 4.5+ 7-8 22 4.5+ 14 0-1 25 1.00 1-2 17 4.5+ 2-3 23 4.00 3-4 22 2.00 4-5 22 3.50 5-6 20 4.5+ 6-7 21 2.50 7-8 17 2.50 15 0-1 - 22 1.00 1-2 24 1.00 2-3 18 4.5+ 3-4 17 4.5+ 4-5 16 4.5+ 5-6 19 3.50 6-7 18 3.75 7-8 18 4.00 16 0-1 22 1.25 1-2 18 3.00 2-3 19 2.50 3-4 20 2.75 4-5 22 2.75 5-6 22 3.25 6-7 18 4.25 7-8 17 4.5+ > o~ oOoOoOOOOo o D.