SS9901-CN020220TurnerCollie Braden Inc.
Engineers - Planners · Project Managers
17300 Dal)as Parkway
Suite 1010
Dallas, Texas 75248
Tel: (972) 735-3000
Fox: (972) 735-3001
February 19, 2002
Mr. Kenneth M. Griffin, P.E.
Director of Engineering & Public Works
City of Coppell
255 Parkway Boulevard
P.O. Box 478
Coppell, Texas 75019-4409
TCB Job Number 15-31124-001
Deforest & Sandy Lake LS Improvements
RE: DeForest and Sandy Lake Wastewater Lift Stations and Force Main Improvements/~' S'
Supplemental Agreement No. 1
/ ..~..~
Dear Mr. Griffin:
After execution of this Supplemental Agreement No. 1, the Engineering Services Contract
between the City of Coppell and Turner Collie & Braden Inc. for the DeForest and Sandy Lake
Wastewater Lift Stations and Force Main Improvements will be modified as follows:
The Engineering Services Contract is revised to increase the compensation from
$405,863 to $415,289, an increase of $9,426. This increase in compensation is requested
due to additions to the Scope of Services as described in Exhibit A and Exhibit B
attached hereto. Compensation for these services will be in accordance with the original
Engineering Services Contract dated March 7, 2001, Section 3A - Compensation.
All other terms and conditions of the Engineering Services Contract dated March 7, 2001 are
unchanged and remain in full force and effect.
Turner Collie & Braden Inc.
T. Barton Hubbard, P.E.
Principal Project Director
City of Coppell
By: ~
.Jha ~/~.tt, c:t. ty lVianager
Engineering Excellence for Over One-Half Century
0.0
2.0
EXHIBIT A
SUPPLEMENTAL AGREEMENT NO. 1
SCOPE OF SERVICES
DEFOREST AND SANDY LAKE LIFT STATIONS AND FORE MAIN IMPROVEMENTS
GENERAL
O. 1. Project Description
The additional services to be provided for this project consist of the re-alignment of the
20" force Line "C" to avoid a conflict with a proposed retaining wall included in the St.
Joseph Development. TC&B was not made aware of the proposed retaining wall until the
plans for the 20" force main Line"C" were 100% complete.
FINAL DESIGN
· Update four plan and profile sheets with information provided by Aguirre Engineers
showing the proposed facilities on the St. Joseph Development.
· Modify horizontal and vertical alignment on four plan and profile sheets to re-align
the 20" force main around the proposed retaining wall.
· Update quantity summary sheet and bid quantities
City of Coppell, Texas
DeForest and Sandy Lake Waatewater
Lift Stations and Force Main improvements
SUPPLEMENTAL AGREEMENT NO. 1
EXHIBIT B
02/19/02
BASIC SERVICES
Project Project Staff Senior
TASK USTING Manager Enginee~ Engineer Technic!an Technician Clerical TOTAL
dodification to 4 plan & profile sheets to re-align the 20' 16 40 40 $8,920
Force Main to avoid the future retaining wall on the
St. Joseph Development.
Jpdate quantit~ sheet & bid quant~ies
TOTAL HOURS 16 40 40 96
LABOR EXPENSE TOTALS $1,920 $4,000 $3,000 $0,920
TC&B NON-LABOR ESTIMATE
SUBCONTRACTOR SERVICES AND ADMINISTRATION
Subconmlctor T&~k & Exp. 15.00% Contract~ Expense
tOTALS I I
ITOTAL ESTIMATE I I $9,4291
FEB 20 ~00~ 16:06 FR TURNER COLLIE& BRADENg?2 ?35 3002 TO 997~3043570 P.05×06
Turner Collie~Braden
COMPUTATION SHEET
JO~ NO,. SHEET NO ~OF ~
t. /
FEB 20 2002 16=07 FR TURNER COLLIE& BRADENg?2 ?55 3002 TO 99?230435?0 P,06×06
III
~- ~- ~--
~ E ~
o~:~
?
TOTAL PRGE.06 ~
FEB 28 2882 16:06 FR TURNER COLLIE& BRADENg?2 735 3002 TO 99723043570 P.02/06
TurnerCollie(. 'Braden Inc.
Engineers o Planners o Project Managers
February 19, 2002
Mr. Kenneth M. Griffin, P.E.
Director of Engineering & Public Works
City of Coppell
255 Parkway Boulevard
P.O. Box 478
CoppelL Texas 75019-4409
RE: DeForest and Sandy Lake W
Supplemental Agreement No. 1
TCB
Deforest,
15-3112,$-001
/ Lake Lilmpr°"vements
Stations and Force Main Improvements
Dear Mr. Griffin:
After execution of this Supplemental
between the City of Copl:nrll and 3
1, the Engineering Services Contract
& Braden Inc. for the DeForest and Sandy Lake
follows:
The Engineering revised to increase the compensation from
$0,05,863 to $415.289, 426. This increase in compensation is requested
due to additions to of Services as described in Exhibit A and Exhibit B
attached hereto, these services will be in accordance with the original
Engineenn .~ontract dated March 7, 2001, Section 3A - Compensation.
All other terms and cc )ns of the Engineering Services Contract dated March 7, 2001 are
unchanged and remain in full force and effect.
Turner Collie & Braden Inc.
By:
T. Barton Flubbard, P.E.
Principal Project Director
Date:
City of Coppell
By: KeSh fi. Z, P.E.
Director of Engineering & Public Works
Date: ~ { ~ I o ~.,