CF-Coppell Rd SC-LR020221Hooper Engineering Laboratories, Inc.
Construction Materials Testing
REINFORCING STEEL PLACEMENT INSPECTION
CLIENT: Texas Unified Constructors, Inc.
DATE: 21 February 2002
PROJECT:
Field Service Offices & Maintenance Facility
C0ppell, TX
JOB NO. 01,1054
TIME: 3.0 hours
AREAINSPECTED:
1) Slab on grade, utility slab, from A line to D line and
and from 1 line to 10 line
2) Slab on grade, truck bay, from 8 line to 11 line and
from C line to F line on main building
DATE OF INSPECTION: 2/20/02 (11:30am~l :30pm), 2/21/02 (6:00am-7:00am)
DEFICIENCIES NOTED:
NUMBER
LOCATION/ITEM DESCRIPTION
CORRECTIONS
OBSERVED
1 Slip dowels not in utility slab and truck bay. Yes
2 Dirt on grade beams in both areas. Yes
3 Perimeter dowels not bent down in utility slab, south Yes
side and southwest corner.
4 Mud and dirt on poly in utility slab and truck bay. Yes
5 Dowels not tied down, northeast corner of truck bay. Yes
TECHNICIAN:
DISTRIBUTION:
EWM
(3) City of Coppell
(1) Vidaud & Associates
(1) Doyle Engineering Group
(1) Texas Unified Constructors, Inc.
2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148