Loading...
Riverside Church-LR020227 02/2?/2002 17~00 ~?~870080~ TRIN~¥Y ENGR-DALLAS T~INITY ENCINEERING/KLEIN~ELDE~ 2211 Centu~ Center BIvd, MORTAR CUBE COMP~SSI~ ST~NGTH ~PORT ASTM C109 PAGE 02/02 Last Reissued on: Report Date: 2/27/02 Report~ey '~ Project No.: 10645 Ret No.: 'i02543 /KClver~id_e ~ur~_h of,Christ ~,/ Project: Riverside Church of Christ Coppell, Texas ~ Phase; N/A Coppell, TX 75019 pe~lt No.: Mix D=~ Repo~ to Kleinfelder Cement Supplier: ~n-site Batc~ Cement Factor Mix NO.: n/a M~. $i~ Agg.(in.): ~sl~n Strength: 1 ~00 psi ~ ~ days Adml~ums: Sample D=ta Obse~ed by Klein~lder Date Sampled: 1/29/02 Date Received: Measured Slump wlplastl~i~r(In.): Contractor: Air Temperature (*g): 73 Truc~ick~: MIx Tam,refute (OF): Sampled By: S. Wilson Air Con~nt (%): -- 8ubmiffed By: S Wilson UnltWeight (~: Curing Method: Cure ~oom Batch Size (~y): Specimen Prep: Unbonded Wea~er: Water Add~ (gal.) Field Cure Temp (*g) HI: LO: Wind (MPH) Time Field Cure Time; 24~4 hm. Rh (%); Time Sample: Ti~e In Specified Sample' Date Age Dimensions Ama !.li[ii..a~ Coed C6n; P~-~'~'~--sl~ Required Number Tested (days) Wd. HL Len. (In") (1~.) ~ngth (p S~rength (psi) 200233 A 2/5/0~ 7 ~ x 2 x 2 ,. 4 4100 /1030 ~ -200233 B 2/5/02 7 2 x ~' x 2 4 4700 ~ 1180 " 200233 C 2/26/02 28 2 x 2 ~ 2 4 ~00 1100 200233 D 2/26/0~ 28 2 x 2 x 2 4 5200 1300 ~ ~ , / 28 day atrengtlt failed to meet design specifications. , Avereg~ CC: David Turner K.B Alexander- fax Lar~ Davis City of Coppetl - fax Lee Stone City of Coppell ~ fax Bob Bandy V, Aubrey Helium ArchitectS John Millett, P.E Millett Engineering Group Wm. Duane Harrell, P,E. Senior Consultant Unless pd0r arrangement~ have been made, all HOLD Specimens will be discarded ff required strength is ettelned.