Loading...
Amberpoint BP-LR020219REPORT OF WATER INJECTION OBSERVATION Report Number: 94021029.0048 Service Date: February 11,2002 Clien~,~ran~tem Commercial Se.~c /~' At~: Jim Gaspard ~ [, ;~001 Spring ValleyR~,~te 600W 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 (214) 630-1010 Report Date: February 19, 2002 Project: Amberpoint Building No. 1 Amberpoint Bus. Pk. @ Coppell Coppell, Texas Project Number: 94021029 Services: Water injection observation. On this date, an HBC Engineering technician arrived at the above referenced jobsite as scheduled for water injection observation. HBC's technician was on standby until 1:00 p.m. while Jowell's personnel relocated the hoses, pumps and injection rigs from the north side of the pad to the south side of the pad. Also on this date, Jowell had six (6) injection rigs in an isolated area (refer to Water Injection Observation Report 94021029.0047, dated 02/11/02 for recorded data). The pier drillers were drilling on the north side of the pad. Technician: Steve Long Report Distribution: HBC Enginee~ng~ (1) Transwestern Commercial Services (1) City of Coppell * Bldg Insp (1) O'Brien & Associates Inc (1) Hill & Wilkinson Ltd Reviewed by: (1) TechniStructures Inc (1) Halff Associates Eugene Harltour (1) City of Coppell - Constr Insp (1) State Farm Insurance Pdncipel The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shell not be reproduced except in full without the written approval of Terracon. Test results transmitted herein are only applicable to the actual samples tested et the location(s) referenced and are not necessarily indicath,~ of the properties of other apparently similar or identical materials. Page 1 of 1