Loading...
Amberpoint BP-LR020212WATER INJECTION OBSERVATION Date of Service: Client No.: Client: 02/12/02 3181 Transwestem Commercial Services 5001 Spring Valley Rd, Suite 600 W Dallas, TX 75244 Report No.: Project No.: Project: 94021029.0049 94021029 Amberpoint Building No. 1 Amberpoint Bus. Pk ~ Coppell Coppell, Texas Location: Building Pad General Contractor: Hill & Wilkinson Injector: Jowell Procedure: On this date, a representative of HBC Engineering, Inc. observed the injection of water at this site. During the injection process, the following observations were recorded. Pass No.: 1st No. of Probes: 4 Probe Length: 12 feet OBSERVATION SPECIFICATION Yes No NIA Surfactant added to each load. X Injection pressure 50 to 200 psi at manifold. X Injection downward in 18 inch intervals. X Total depth of injection was 10 feet. X Spacing of injection was 5 feet maximum. X Iqjection to refusal at each location. X Comments: Technician: S. Campbell Report Distribution: (l) Transwcstcm Commercial Services (1) O'Bricn & Associates, Inc. (1) TcchniStmctures, Inc. (1) City of Coppell - Constr. Insp. (1) City of Coppell - Bldg. Insp. (1) Hill & Wilkinson, Ltd. (l) Halff Associates (1) State Farm Insurance H~ Engineering, Inc. Eugene Harbour Principal 99ss '~is report is exc~usi~ly for the use of the client ind~at~l above and shall not be reproduced m fldll without written approval of HBC Eng,nee* ?? I iI I I I