Loading...
Amberpoint BP-LR020211WATER INJECTION OBSERVATION Date of Service: Client No.: Client: Location: Procedure: 02/11/02 3181 Transwestern Commercial Services 5001 Spring Valley Rd, Suite 600 W Dallas, TX 75244 Report No.: Project No.: Project: 94021029.0047 94021029 Amberpoint Building No. 1 Amberpoint Bus. Pk @ Coppell Coppell, Texas Building Pad General Contractor: Hill & Wilkinson Injector: Jowell On this date, a representative of HBC Engineering, Inc. observed the injection of water at this site. During the injection process, the following observations were recorded. Pass No.: 1st No. of Probes: 4 Probe Length: 12 feet OBSERVATION SPECIFICATION Yes No N/A Suffactant added to each load. X Injection pressure 50 to 200 psi at manifold. X Injection downward in 18 inch intervals. X Total depth of injection was 7 feet. X Spacing of injection was 5 feet maximum. X In, iection to refusal at each location. X Comments: Jowell was unable to start injecting until 1:00 p.m. due to equipment problems. Technician: S. Campbell Report Distribution: (l) Transwestem Commercial Services (1) O'Brien & Associates, thc. (1) TectmiStructures. Inc. (1) City of Coppell - Constr. hasp. (1) City of Coppell - Bldg. hasp. (I) Hill & Wilkinson, Ltd. (1) Halff Associates (1) State Farm Insurance Engineering, Inc. Eugene Harbour Principal 9911w This report is exclusively for the use of the client indicated above and shall not be reproduced in full without written approval of HBC Engineer