St Joseph-CS020227From: <DanieLMergen/CENTEX%CENTEX%com%com>
To: Allegro5.hub
05Cjphillips@aguirre.com","mmillican%ag uirre.com%CCG@com","groden@aguirre.com")
Date: 2~27~02 12:25PM
Subject: St. Joseph Village - Coordination with the City
The minutes are presented for the meeting with the City of Coppell's
Engineering Department on Monday, 25 February.
This meeting was very helpful to us in developing work-start arrangements
with the Engineering Department.
We've arranged a meeting with Greg Jones, Coppell's Chief Building
Official, for Monday at 1:30 in his office to learn his permitting and plan
review requirements. Travis Crump, Fire Marshall, has also been invited
and currently plans to attend. Aguirre looks for Travis to give them the
addresses, acceptance/rejection of ventless fireplaces, and sprinkler
requirements for the Cotttages. Centex will ask Greg to allow us to to
pull separate permits for the cottages/perimeter screen wall and for the
main building. We also need to learn what his minimum plan requirements
are for the design of the cottage slabs and the utilities because these are
currently planned for design and stamp by Centex subcontractors under
design-build principles.
...................... Forwarded by Daniel Mergen/CENTEX on 02/27/2002
10:41 AM ...........................
St. Joseph Village
Coordination Meeting
Meeting Type Coordination Meeting
Meeting # 002 Date 02~25~2002 at 02:00 PM
Location City of Coppell Engineering
Attendees
AGUIRRE Corporation: The City of Coppell: Gary
Gary Roden W. Johnson
AGUIRRE Corporation: The City of Coppell: Glenn
Mike Millican D. Hollowell
Centex Construction The City of Coppell:
Company: Anthony Kenneth M. Griffin
~n Griffin ~ §{ J~eph ~iiiag~: ~oord- n~i 0~ ~ith ~h-e (~i~ .............. Pag~ ~i
Lauchner
Centex Construction
Company: Daniel
Mergen
Iltem J J I DescriptiolAssignel Due ICompletl
I # IResponsl I n I d J I ed J
I l ible I I I I I I
I-----+ ....... + .................... + ........... + ....... + ....... + ....... I
002.00 Anthony Tank 02/25/2 03/01/2
1 Demo/Force 002 002
Main Permit
Centex will submit a single permit for the Tank
Demolition/Fill and installation of the 30" Sanitary Force
Main as a single permit. Ken Griffin acknowledged that no fee
would be charged for this scope of work performed for the City
through a contract between the City and St. Joseph Village,
Inc. Upon notification of utility disconnects Centex can
contact the assigned city inspector for an on-site tank
demolition preconstruction meeting. Prior to starting work on
the 30" Force Main, Centex shall coordinate with the assigned
city inspector to schedule a formal Preconstruction meeting
for this scope of work.
002.00 Glenn
2 Hollowe
II
Electrical 02/25/2
Service 002
Disconnect
Glenn has been corresponding with First Choice, TXU and OnCor
for a significant time to have the service disconnected, meter
pulled and transformer removed. As of today Glenn's
understanding is this work should be complete by Wednesday
2/27/02. Glenn will continue with follow-up to have this work
completed ASAP. Completion of this work is required to have a
Preconstruction meeting prior to starting work on Tank Demo.
002.00 Glenn
3 Hollowe
II
Water 02~25/2
Service 002
Disconnect
Glenn has been working with Randy Patton of Dallas Water
Utility (DWU) to get the water valve serving the tank removed
and blind-flanged at DWU's main line adjacent to the site.
DWU has started excavation and a power pole has started
slipping into the excavation~ DWU is to hand carry a check to
TXU or the new appropriate entity on Wednesday of this week in
order to have the power pole relocated. Previous indication
has been two weeks to schedule power relocation. Status of
schedule is currently unknown. Glenn will continue with
follow-up to have this work completed ASAP.
002.00 Anthony Tank Fill 02~25~2
4 002
Glenn Hollowell noted that the water in the tank is ground
water that the piping had been disconnected from the tank and
that the City could pump the tank out when demolition is to
begin. Centex may need to place a pump in the test port
manhole to the west to keep the tank dry during fill
operation. The city had previously used this to reduce ground
water around tank. Centex is to demolish the top of the tank
and sides down to existing grade, and the control buitding
All demolition shall be pulverized to approx. 6" rubble at the
bottom of the tank. Additionally, a one foot section of the
tank will be broken from top to bottom to avoid trapping
water. Centex to provide 1Sack cement/sand mix as fill around
and over rubble to fill voids in rubble. Soil compaction above
cement/sand mix shal~ match requirements for compaction under
Star Leaf Road since roadway goes over the top of the old
tank.. Test Port Manhole shall be filled similiarly upon
completion of tank operation.
002.00 Ken
5 Griffin
30" Force 02~25~2
Main Design 002
Ken noted that Turner Collie Braden were expecting to submit
final revised documents to him by March 1, 2002. He
anticipates only a day or two of review since the city has
previously reviewed the original layout and then will stamp
and release these documents for material order The piping is
designed as epoxy lined ductile iron and is specified on the
drawings. Centex anticipates a 3-4 week delivery from release
of material order and will request a preconstruction meeting
just prior to starting this work, under the same permit as the
Tank Demolition.
002.00 Mike
6 Millica
n
Revisions 02/25/2 03/01/2
to 30" 002 002
Force Main
Easement
Due to revisions in layout of 30" Force Main the easement
along the west property line will need to be revised as an
Ken G?iff!n~- _s~t. J~oseph Village- Coordination wi!h the City
amendment to the Plat. Mike Millican to coordinate with the
City on the appropriate reviews necessary to expediously
complete easement modifications and file the plat. Final
review and approval of Plat by city should take 1 week to 10
days. Mike's only concern on completing Plat is finalizing
easements with TXU. Filing the Plat with the county after the
City has approved is a requirement prior to the city's review
of building permit plans.
002.00 Mike
7 Millica
n
Early Site 02/25/2 03/01/2
Grading 002 002
Permit
Mike Millican to submit final site grading plan and SWPPP
erosion control plan to the city along with a current copy of
all site utilities clearly marked as preliminary for reference
only. The city will review and agree to issue an early site
grading plan with completion of the early grading permit
application and submission of other required documents and
fees. (See checklist for early grading permit)
002.00 Mike
8 Millica
n
Final 02/25/2 03~06~2
Utility 002 002
Plan
Final Utility Plans to be submitted to the city by 3/6/02 for
review.
002.00 Anthony Water 02/25/2
9 Meters 002
City will order water meters upon order and payment. City's
contract with Mfr. requires delivery within 45 days, currently
been receiving within about 2 weeks. City will not provide
meter to contractor until impact fees have been paid by
developer. Centex will order meters upon final submission of
utility drawings.
002.01 Mike
0 Millica
n
Fire Lane 02/25/2 03/06/2
Paving 002 002
The City needs a letter to provide a thickened (7") concrete
Fire Lane Paving section without lime stabilization in lieu of
lime stablized subgrade on private roadway. Star Leaf Road
and approaches from property line to Star Leaf Road will
require lime stablization. Mike to provide letter.
002.01 Anthony Temporary 02~25~2
1 Fire Lane 002
Ken Griffin- St. Joseph Vill;'ge: ~oor~inatio~ ~iti~ ih~ ~ity ....... Pa~ ~-;I
Centex inquired about the possibility of having a short
temporary fire lane from Sandy Lake Road to facilitate
construction during the short term. Ken Griffin requested
Centex discuss their plan of action with Travis Crump, City
Fire Marshall.
002.01 Anthony Building
2 Permit 002
Packages
02/25/2
Centex requested information on packaging of building permit
drawings for Phases. Ken Griffin requested Centex contact
Greg Jones, Chief Building Official to discuss requirements.
002.01 Mike
3 Millica
n
Plastic 02~25~2 03/06/2
Storm Pipe 002 002
Mike requested if the city allows use of a plastic storm pipe
inlieu of RCP. Glenn Hollowell indicated that the city has
used it and doesn't have a problem with an appropriate heavy
duty plastic storm pipe. Their experience has been the
material is more costly but is much cheaper for handling.
Centex requested Mike show this as a bid alternate on the
utility plans.
002.01 Mike
4 Millica
n
Sandy Lake 02/25/2 03/06/2
Road 002 002
connection
Star Leaf Road and the St. Joseph Entry Drive elevations are
designed to match up with Sandy Lake Road after it is widened.
Based on discussion today indicating the south side of Sandy
Lake Road will not be widened for over a year, well past the
anticipated completion of Star Leaf and the entry; Mike
Millican shall modify drawing to indicate a asphalt transition
for the interim. Further study may be required to determine
impact of this on the bridge at the entry due to elevation
difference.
cc File
The above constitutes the writer's understanding of the items discussed and
the decisions made. If there are any errors or omissions, please contact
Centex in writing within five business days.
~_~_~'~ ~riffin- St. ,.l_o~_eph Vii!age :i~oordinat~-with th~i--~ ..... ~--" ~' _ i-" ' ...... _ ..... Page
CC: City_of_CoppelI.Town_Center(kg riffin,gjohnson,tcrump),Allegro5.h ub
05("blittle@ccgmail.com","rroberts@ccgmaiLcom","alauchner@ccgmail.com",...