REPORT OF CYLINDER COLLECTION
Report No.: 143340
Project No.: 015729
Date of Service: 02/09/2002
Report Date: 02/22/2002
Report of Collection
On this date, a Rone Engineers, Inc. representative arrived on site as scheduled
to pick up compressive strength test specimen cast prior to this date.
Technician Time: 1:00 p.m. - 3:00 p.m.
Page 1 of 1
Technician: Joe Jernigan
Report Distribution:
(1) City of Coppel!
(l) City of Ceppell
(i) City of Ceppell
(1) Infrastructure Services, Inc.
(1) City of Coppell
(1) Schriekel, Rollins & Assoc., Inc.
Project Manager
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, performance, etc.) or any other feature of similar subject maser provided by persons or conditions over which we have no controI. Our letters and
reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineers, Inc.
99DF PaRe 1 of 1
gineers
8908 Ambassador Row
Dallas, Texas 75247-4510
(214) 630-9745
(214) 630-9819 (fax)
CONCRETE COMPRESSIVE STRENGTH TEST
Client:
City of Coppell
Attn: Ms. Susan Taylor - Engineering Dept
PO Box 478
CoppelI TX 75109
Report No.: 143784
Project No.: 015729
Date of Service: 02/14/2002
Report Date: 02/22/2002
Project:
Creekview Drive and
Freeport Parkway
Coppell, TX
Obtain samples of fresh concrete at the placement locations, perform required field testing, cast compressive strength samples and bring
samples back to the laboratory for curing and testing in accordance with applicable standards.
PROJECT DATA
STRENGTH:
SLUMP (in):
AIR (%):
TEST METHOD:
CONTRACTOR: Infrastructure Services, Inc.
CONCRETE SUPPLIER: Lattimore
PLANT: 7
SPECIFICATION REQUIREMENTS
3000 psi @ 28 Days
NA
NA
ASTM C- 172
ASTM C-31
ASTM C-143
ASTM C-231
ASTM C-1064
ASTM C-138
MIX DESIGN I.D.: 38
PLACEMENT DATE: 02/14/2002
WEATHER CONDITIONS: Sunny
TIME SAMPLED: 4:15pm BATCHTIME: 3:lSpm
TEMPERATURE (F). AIR 57 F CONCRETE: 64 V
TRUCK NO: 1092 TICICET NO: 7 113392
AIR CONTENT (%): NA UNITWEIGItT(pcf): NA
OVERALL PLACEMENT LOCATION:
Inlet - 400' east of existing creekview on north side of future road
SAMPLE LOCATION: Same as above
ASTM C-39 REPORT OF TESTS
Concrete Compressive Cylinder 6" x 12" (area 28.27 sq. in.)
CYLINDER MEASURED MAXIMUM COMPRESSIVE
MARKED SLUMP DATE AGE LOAD STRENGTH
SET NO. (inches) TESTED (days) (lbs. force) (psi)
FRACTURE
TYPE
1 1 4.75 02/21/2002 7
1 2 4.75 03/14/2002 28
1 3 4.75 03/14/2002 28
1 4 Hold
Standby time: 2:00pm - 4:00pm
87505 3090
Unbonded Cap
Unbonded Cap
Unbonded Cap
Technician: Cody Carroll
Report Distribution:
(1) City of Coppell
(1) City of Coppell
(1) City of Coppell
(I) Infrastructure Services, Inc,
( 1 ) City of Coppell
(I) Schrickel, Rollins & Assoc., Inc. iF/ 6~ ~ Clay Stark
Project Manager
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and
reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineers, Inc.
01DK Page 1 of 1
Client:
City of Coppell
Arm: Ms. Susan Taylor - Engineering Dept
PO Box 478
Coppell TX 75109
Project: Creekview Drive and
Freeport Parkway
Coppell, TX
Services: Cylinder Collection
8908 Ambassador Row
Dallas, Texas 75247-4510
(214) 630-9745
(214) 630-9819 (fax)
REPORT OF CYLINDER COI,I,ECTION
Report No.: 143921
Project No.: 015729
Date of Service: 02/15/2002
Report Date: 02/22/2002
Report of Collection
On this date, a Rone Engineers, Inc. representative arrived on site as scheduled
to pick up compressive strength test specimen cast prior to this date.
Technician Time: 5:15 p.m. - 6:45 p.m.
Page 1 of 1
Technician: Chris Webber
Report Distribution:
(1) City of CoppeIl
(1) City of Coppell
(1) City of Coppell
(1) Infrastructure Services, lnc,
(i) City of Coppell
(1) Schrickel, Rollins & Assoc., Inc.
~a¥ Stork
Project Manager
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing, We assume no responsibility for variation in quality
(composition, appearance, performance, em.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and
repons are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineers, Inc.
99DF PaRe 1 of 1