Loading...
ST0001-LR020220R° gineers 8908 Ambassador Row Dallas, Texas 75247-4510 (214) 630-9745 (214) 630-9819 (fax) CONCRETE COMPRESSIVE STRENGTH TEST Client: City of Coppell Report No.: 143433 Atto: Ms. Susan Taylor - Engineering Dept Project No.: 015729 PO Box 478 J'~"- ' '~'~ Date of Service: 02/11/2002 ~ / Report Date: 02/20/2002 Proje~Cr/e~iew Drive and ~'~ Services: Obtain samples of fresh concrete at the placement locations, perform required field testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. PROJECT DATA STRENGTH: SLUMP (in): AIR (%): TEST METHOD: CONTRACTOR: Infrastructure Services, Inc. CONCRETE SUPPLIER: Lattimore PLANT: 3 SPECIFICATION REQUIREMENTS 3000 psi ~ 28 Days 3" - 5" 3% - 5% ASTM C-172 ASTM C-31 ASTM C-143 ASTM C-231 ASTM C- 1064 ASTM C-138 ASTM C-39 MIX DESIGN I.D.: 42 PLACEMENT DATE: 02/1 1/2002 WEATHER CONDITIONS: Clear TIME SAMPLED: 10:45am BATCHTIME: 10:06am TEMPERATURE (F) - AIR 46 F CONCRETE: 51 F TRUCK NO: 819 TICKET NO: 3140259 AIR CONTENT (%): 4.2 uNrr WEIGHT (pet): NA OVERALL PLACEMENT LOCATION: Paving - northbound leR t~n lane 90'-190' SAMPLE LOCATION: 20'-30' west of cast curb and 130' REPORT OF TESTS north of start oflefitum lane Concrete Compressive Cylinder 6" x 12" (area 28.27 sq. in.) CYLINDER MEASURED MAXIMUM MARKED SLUMP DATE AGE LOAD SET NO. (inch.) TESTED (d~ Obs. ~rce) 1 1 3.0 02/18/2002 ~ 111890 1 2 3.0 02/18/2002 114960 Average 1 3 3.0 03/11/2002 28 1 4 3.0 03/11/2002 28 1 5 Hold ~r 3'960 '~ Unbonded Cap ~ Unbonded Cap 4020 '2.....~'~ ~nbonded Cap Unbonded Cap LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. Wc assume no responsibility for variation in quality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Oux letters and reports are for thc exclusive usc of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineers, Inc. 01DK Page 1 of 2 aeoort ~o.: 143433 RoneEngineers Project No.: 015729 Client: City of Coppell ~~ Water added at site: Technician: Dan Gammon Report Distribution: (1) City of Coppell (1) City of Coppell (1) City of Coppel! (1) Infrastructure Services, Inc. 10 9allons / Started: 9:00amFinished: l:00pm Ro/~ (1) City of Coppoll (1) Schrlckel, Rollins & Assoc., Inc. ay Stark ect Manager LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineers, lnc. 01DK Page 2 of 2 RoneEngineers 8908 Ambassador Row Dallas, Texas 7524%4510 (214) 630-9745 (214} 630-9819 (fax) CONCRETE COMPRESSIVE STRENGTH TEST Client: Project: Services: City of Coppell Arm: Ms. Susan Taylor - Engineering Dept PO Box 478 Coppell TX 75109 Report No.: 143290 Project No.: 015729 Date of Service: 02/08/2002 Report Date: 02/20/2002 Creekview Drive and Freeport Parkway Coppell, TX Obtain samples of fresh concrete at the placement locations, perform required field testing, cast compressive strength samples and bring samples back to the laboratory for caring and testing in accordance with applicable standards. PROJECT DATA STRENGTH: SLUMP (in): AIR (%): TEST METHOD: CONTRACTOR: Infrastructure Services, Inc. CONCRETE SUPPLIER: Lattimore PLANT: 7 SPECIFICATION REQUIREMENTS 3000 psi ~ 28 Days 3"-5" 3% - 5% ASTM C-172 ASTM C-31 ASTM C-143 ASTM C-231 ASTM C- 1064 ASTM C-138 ASTM C-39 MIX DESIGN I.D.: 42 PLACEMENT DATE: 02/08/2002 WEATHER CONDITIONS: Sunny TIME SAMPLED: 10:10am BATCll TIME: 8:52am TEMPERATURE (F) - AIR 51 F CONCRETE: 57 F TRUCK NO: 755 TICKET NO: 7113186 AIR CONTENT (%): 4.4 IINIT WEIGHT (pcl): NA OVERALL PLACEMENT LOCATION: Paving - Northbound Freeport Parkway t¥om Station 32+50 to 36 SAMPLE LOCATION: Station 33+00 REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" (area 28.27 sq. in.) CYLINDER MEASURED MARKED SLUMP SET NO. (inches) 1 I 4.75 MAXIMUM DATE AGE LOAD TESTED (days) (Ibs. brce) 02/11/2002 ~- 72210 COMPRESSIVE STRENGTH FRACTURE TYPE Unbonded Cap Unbonded Cap 1 2 4.75 02/15/2002 1 3 4.75 03/08/2002 1 4 4.75 03/08/2002 1 5 Hold 83495 28 Unbonded Cap 28 Unbonded Cap LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided fbr testing. We assume no responsibility tbr variation in quality (composition, appearance, perlbrmance, etc.) or ally other feature &similar subject matter provided by persons or conditions over wbich we have no cumroL Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in tull without the written approval of Rone Engineers. Inc. 01DK Page 1 of 3 gineers 8908 Ambassador Row Dallas, Texas 75247-4510 (214) 630-9745 {214) 630-9819 (fax) CONCRETE COMPRESSIVE STRENGTH TEST Client: City ofCoppell ARn:Ms. Susan Taylor-Engineering Dcpt PO Box478 CoppellTX 75[09 Report No.: 143290 Project No.: 015729 Date of Service: 02/08/2002 Report Date: 02/20/2002 Project: Creekview Drive and Freeport Parkway Coppell, TX Obtain samples of f?esh concrete at the placement locations, perform required field testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. PROJECT DATA STRENGTH: SLUMP (in): AIR (%): TEST METHOD: CONTRACTOR: htfrastructure Services, Inc. CONCRETE SUPPLIER: Lattimore PLANT: 7 SPECIFICATION REQUIREMENTS 3000 psi ~ 28 Days 3" - T' 3% - 5% ASTM C-172 ASTM C-3 l ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-138 ASTM C-39 MIX DESIGN I.D.: 42 PLACEMENT DATE: 02/08/2002 WEATHER CONDITIONS: Sunny TIME SAMPLED: I l:40am BATCIlTIME: 10:1 lam TEMPERATURE (F}- AIR 68 F CONCRETE: 59 F TRUCK NO: 958 TIC~:ET NO: 7113197 AIR CONTENT (%): 4.6 UNITWEIGHT(pcf}: NA OVERALL PLACEMENT LOCATION: Paving - Nortbbound Freeport Parkway l?om Statiou 32+50 to 36 SAMPLE LOCATION: Station 34+79 REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" (area 28.27 sq. in.) CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) ~ TYPE 2 1 3.0 02/11/2002 ~__ 91990 ~ Unbonded Cap 2 2 3.0 02/15/2002 (~ 108410 Unbonded Cap 2 3 3.0 03/08/2002 28 Unbonded Cap 2 4 3.0 03/08/2002 28 Unbonded Cap 2 5 Hold LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided Ibc testing. We assume no responsibility tb~ variation in quality (composition, appearance, pertbrmance, etc.) or any other feature of similar subject matter provided by persons or couditions over whicb we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shah not be reproduced except in full witbout the written approval of Roue Engineers, thc 01DK Page 2 of 3 Report No.: 143290 RoneEngineers Project No.: 015729 Client: City of Coppell ................ -~ Water added at site: 5 gallons Technician: Jason Barker Started: 7:30am Finished: 12:30pm RoneE/ Report Distribution: (l) City of Coppell (1) City of Coppell / / (1) City of Coppell (1) Schrickel, Rollins & Assoc., Inc. (1) City of Coppell prqi~ (I) Infrastructure Services, Inc. Stark Manager LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided lbr testing. We assume no responsibility for variation in quality (composition, appearance, perfommnce, ere.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in lhl[ without the written approval of Rone Engineers. Inc. 01DK Page 3 of 3