Loading...
PA9702-LR 991019CONCRETE COMPR IVE STRENGTH TES"" 8901 Carpenter Frwy., Suite #10~ Dallas, Texas 75247 Date of Service: 09/16/1999 Report No.: 9925115 Report Date 10/19/1999 Client No.: COPPELL Project No.: 94991118 Client: City of Coppell Project: Coppell Aquatic/Recreation Ctr Attn: Brad Reid 300 Block of Parkway Blvd 732 DeForest Coppell TX 75019 Coppell, Texas/Prj./~)6051 Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: Hisaw & Assoc. CONCRETE CLASS: N/A CONCRETE SUPPLIER: Nelson Brothers PLACEMENT DATE: 09/16/1999 BATCH TIME: N/A PLANT: Lewisville TIME SAMpLED: 7:24am BY: Dean Martin SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: ClOudy STRENGTH: 4000 psi @ 28 Days TEMPERATURE (F) - AIR 74 F CONCRETE: 84 F SLUMP: 5.0" MAX TRUCK NO: 217 TICKET NO: 77669 AIR: N/A AIRCONTENT(%): N/A UNrrwEion'r(p¢0: N/A TEST METHOD: ASTM C- 143 PLACEMENT LOCATION: Leisure Pool ASTM C-172 ASTM C-39 SAMPLE LOCATION: SE comer REPORT OF TESTS ACCUMULATIVE YARDS: 20 CYLINDER 1VLEASURED MAXIMUNI COMPRESSIYE MARKED SLLrMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 1 1 6.00 09/23/1999 7 97150 3440 I 2 6.00 09/23/1999 7 92160 3260 Average 3350 1 3 6.00 10/14/1999 28 135340 4790 1 4 6.00 10/14/1999 28 137950 4880 Average 4840 1 5 6.00 11/11/1999 56 Note: Concrete placed by pump. Sample taken at point of discharge. Technician: Dean Martin Started: 5:30am Finished: 8:00am H]C ~ring, Inc. Report Distribution: (1) City of Coppell (1) City ofCoppell - Engineering (1) BrinkIcy Sargent Architects (1) City ofCoppcll - Bldg. lnsp. Eugene Harbour (I) Turner Engineers (I) City ofCoppelt - Leisure Serv Dept Vice President (1) Hisaw & Associates ?ais report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the wriRcn approval of HBC Engineering, Inc. 01Th{ Page I of 1